Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 59 ]
�
� |
Liaison statement to Working Party 9C with copy to Working Parties 3L, 6E, 8A and 8B - Review of allocations to all services in the HF bands between 4 and 10 MHz
�
� |
WP 7D
� |
� |
2005-03-29 |
|
[ 58 ]
�
� |
Agenda item 1.13
�
� |
France
� |
� |
2005-03-21 |
|
[ 57 ]
�
� |
Usage of the HF band between 4 and 10 MHz by fixed and mobile services
�
� |
France
� |
� |
2005-03-21 |
|
[ 56 ]
�
� |
Use of MF and HF spectrum for disaster relief
�
� |
Australia
� |
� |
2005-03-17 |
|
[ 55 ]
�
� |
Production of CPM text for WRC-07 Agenda item 1.13
�
� |
Coordinator of the Coordination Group for AI 1.13
� |
� |
2005-03-15 |
|
[ 54 ]
�
� |
Liaison statement to Working Parties 3L, 7D, 8A, 8B and 9C regarding WRC-07 Agenda item 1.13
�
� |
WP 6E
� |
� |
2004-11-24 |
|
[ 53 ]
�
� |
Liaison statement to WPs 8A and 9C (information copy to WP 8B) - Clarification of HFBC schedule planning data/statistics indicating a need for additional spectrum allocations in the band 4-10 MHz
�
� |
WP 6E
� |
� |
2004-11-23 |
|
[ 52 ]
�
� |
Liaison statement to WP 9C - Information relevant in the future revision of Recommendation ITU-R F.1487
�
� |
WP 3L
� |
� |
2004-11-16 |
|
[ 51 ]
�
� |
Liaison statement to WPs 3L, 6E, 7A, 7D, 8A, 8B and 9C - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
�
� |
WP 1A
� |
� |
2004-10-20 |
|
[ 50 ]
�
+Ann.1-10� |
Report on the meeting of Working Party 9C, Geneva, 23-29 September 2004
�
� |
Chairman, WP 9C
� |
� |
2004-10-01 |
|
[ 49 ]
�
� |
Final List of Participants - Working Party 9C
�
� |
Director, BR
� |
� |
2004-09-28 |
|
[ 48 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-09-22 |
|
[ 47 ]
�
� |
Liaison statement to WP 9C - Supplement to ITU-R Handbook on frequency adaptive communication systems and networks in MF/HF bands
�
� |
ITU-R SG 2
� |
� |
2004-09-21 |
|
[ 46 ]
�
� |
Liaison statement to WPs 8B and 9C regarding draft CPM text for WRC-07 Agenda item 1.15
�
� |
WP 8A
� |
� |
2004-09-17 |
|
[ 45 ]
�
� |
Liaison statement to WPs 6E, 8B and 9C regarding Agenda item 1.13
�
� |
WP 8A
� |
� |
2004-09-17 |
|
[ 44 ]
�
� |
Liaison statement to WP 9C (Copy to WP 6E for information) - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service
�
� |
Chairman, WP 3L
� |
� |
2004-09-16 |
|
[ 43 ]
�
� |
Optimising spectrum use by the fixed and land mobile services in the HF bands
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2004-09-15 |
|
[ 42 ]
�
� |
Spectrum usages statistics for 4 000-9 995 kHz band in Brazil
�
� |
Brazil (Federative Republic of)
� |
� |
2004-09-15 |
|
[ 41 ]
�
� |
Working document toward a preliminary draft new Recommendation - Characteristics of frequency adaptive communications sytems in the MF/HF bands
�
� |
United States of America
� |
205/9, 147/9
� |
2004-09-15 |
|
[ 40 ]
�
� |
Working document toward a preliminary draft new Recommendation and draft element of CPM text - Characteristics of high frequency (HF) electronic messaging communications systems
�
� |
United States of America
� |
� |
2004-09-15 |
|
[ 39 ]
�
� |
Working document toward CPM text - Characterization of United States spectrum usage and typical parameters in the HF fixed bands between 4 MHz and 10 MHz
�
� |
United States of America
� |
� |
2004-09-14 |
|
[ 38 ]
�
� |
Draft Liaison statement to WP 6E (Information copies to WP 8A and WP 8B) - Request for clarification of HFBC schedule planning data/statistics indicating a need for additional spectrum allocations in the band 4-10 MHz
�
� |
United States of America
� |
� |
2004-09-14 |
|
[ 37 ]
�
� |
Situational use of the HF spectrum
�
� |
United States of America
� |
� |
2004-09-14 |
|
[ 36 ]
�
� |
WRC-07 Agenda item 1.13 - Draft CPM text
�
� |
United States of America
� |
� |
2004-09-14 |
|
[ 35 ]
�
� |
Draft modification of Recommendation ITU-R F.240-6 - Signal-to-interference protection ratios for various classes of emission in the fixed service below about 30 MHz
�
� |
Japan
� |
143/9
� |
2004-09-14 |
|
[ 34 ]
�
� |
Elements for a proposed liaison statement to Working Party 6E - Regarding the draft CPM Report to WRC-07 Agenda item 1.13 Resolution 544
�
� |
Canada
� |
� |
2004-09-08 |
|
[ 33 ]
�
� |
Working document towards a preliminary draft new Recommendation - Channel access requirements for HF adaptive systems in the Fixed Service [HF-AR]
�
� |
Canada
� |
205-1/9
� |
2004-09-08 |
|
[ 32 ]
�
� |
Proposed draft revision of Recommendation ITU-R F.339-6 - Bandwidths, signal-to-noise ratios and fading allowances in complete systems
�
� |
Canada
� |
� |
2004-09-06 |
|
[ 31 ]
�
� |
Elements of a liaison statement to WP 1A - Methodology for protection of the fixed service from interference caused by high data rate communications using the electricity supply wiring
�
� |
Canada
� |
� |
2004-09-06 |
|
[ 30 ]
�
� |
Use of the band 4 MHz to 10 MHz by fixed, mobile and broadcasting services
�
� |
Australia
� |
� |
2004-09-06 |
|
[ 29 ]
�
� |
Graphical presentation of the utilization of Appendix 17
�
� |
France
� |
� |
2004-08-30 |
|
[ 28 ]
�
� |
Understanding WRC-07 agenda item 1.13
�
� |
France
� |
� |
2004-08-30 |
|
[ 27 ]
�
� |
Liaison statement to WPs 3L, 8A and 9C - Establishment of a Rapporteur for the preparation of CPM-06 text on Agenda item 1.13, Resolution 544
�
� |
WP 6E
� |
� |
2004-05-18 |
|
[ 26 ]
�
� |
Liaison statement to Working Parties 8A, 8B, and 9C concerning WRC-07 Agenda item 1.13
�
� |
WP 6E
� |
� |
2004-05-18 |
|
[ 25 ]
�
+Ann.2-5� |
Chairman's Report of the WP 9C meeting
�
� |
Chairman, WP 9C
� |
� |
2004-03-11 |
|
[ 24 ]
�
� |
Final List of Participants - Working Party 9C
�
� |
Director, BR
� |
� |
2004-02-26 |
|
[ 23 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-02-23 |
|
[ 22 ]
�
� |
Draft liaison statement to Working Party 3L - Discussion of ionospheric parameters for consideration by WP 3L in connection with modelling approaches supporting adaptive HF communication systems in the fixed service
�
� |
United States of America
� |
� |
2004-02-13 |
|
[ 21 ]
�
� |
Review pre-2000 ITU-R F. series Recommendations and existing Questions related to WP 9C work for current telecommunications technology application
�
� |
United States of America
� |
� |
2004-02-13 |
|
[ 20 ]
�
� |
Draft liaison statement to Working Party 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring
�
� |
United States of America
� |
� |
2004-02-13 |
|
[ 19 ]
�
� |
Use of the band 4 MHz to 10 MHz by fixed, mobile, broadcasting and amateur services
�
� |
Brazil (Federative Republic of)
� |
� |
2004-02-12 |
|
[ 18 ]
�
� |
Optimizing spectrum use by the fixed and land mobile services in the HF bands
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2004-02-11 |
|
[ 17 ]
�
� |
The climatic control of intensity of a field strength terrestrial wave on communication lines in an MF band
�
� |
Russian Federation
� |
225/3
� |
2004-02-11 |
|
[ 16 ]
�
� |
Proposal from WP 6E for the establishment of a JRG for coordinated development of documentation from the ITU-R on WRC-07 Agenda item 1.13 (Resolution 544 (WRC-03)) (HF in the 4-10 MHz portion of the spectrum)
�
� |
Australia
� |
� |
2004-02-04 |
|
[ 15 ]
�
� |
Proposed reply liaison statement to Working Party 6E concerning WRC-07 Agenda item 1.13
�
� |
Canada
� |
� |
2004-01-29 |
|
[ 14 ]
�
� |
Draft reply to Liaison statement from Working Party 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring
�
� |
Chairman, WP 9C
� |
� |
2004-01-26 |
|
[ 13 ]
�
� |
Liaison statement to Working Parties 6E, 8A and 9C concerning WRC-07 Agenda item 1.13
�
� |
WP 8B
� |
� |
2004-01-14 |
|
[ 12 ]
�
� |
Liaison statement to Working Party 9C - Prediction methods for adaptive HF system operation
�
� |
WP 3L
� |
� |
2004-01-08 |
|
[ 11 ]
�
� |
Liaison statement to Working Parties 8B and 9C concerning WRC-07 Agenda item 1.13
�
� |
WP 8A
� |
� |
2004-01-06 |
|
[ 10 ]
�
� |
Reply to Liaison statement from WP 6E concerning WRC-07 Agenda item 1.13
�
� |
WP 8A
� |
� |
2003-12-15 |
Results:159 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):