International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum management methodologies

Results:136 total items.
Result page:� Previous�-� 1 - 2 - 3
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 36 ]
Liaison from ITU-D Study Group 1 on Question 17/1 � ITU-D SG 1 2004-09-21
[ 35 ]
Liaison from ITU-D Study Group 1 - Question 18/1 � ITU-D SG 1 2004-09-21
[ 34 ]
+Add.1
Proposed revision of Recommendation ITU-R SM.1538-1 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices � Germany (Federal Republic of) 213/1 2004-09-20
[ 33 ]
Analysis of the replies from ITU-R Working Parties to Liaison statement sent by WP 1B related to preliminary draft new Recommendation ITU-R SM.[...] - Criteria for the evaluation of interference between Radiocommunication networks operating in a shared frequency band � Russian Federation 209/1 2004-09-16
[ 32 ]
Preliminary draft new Recommendation ITU-R SM.[...] - Index for the evaluation of the effect of interference between radiocommunication networks operating in a shared frequency band � Russian Federation 2004-09-16
[ 31 ]
Draft revision of Recommendation ITU-R SM.1046-1 - Definition of spectrum use and efficiency of a radio system � Russian Federation 2004-06-23
[ 30 ]
Liaison statement to ITU-D Study Group 1 - Comments on the draft Report on satellite regulation in developing countries � WP 4B 2004-05-14
[ 29 ]
Reply to the liaison statement from WP 1B on the application of a uniform criterion for evaluating interference between radiocommunication systems, operating in shared frequency bands � WP 6E 2004-05-13
[ 28 ]
Liaison statement to Working Party 1B - Comments regarding PDNR SM.[REML] � WP 4A 2004-05-05
[ 27 ]
Reply to the liaison statement from WP 1B on the application of a uniform criterion for evaluating interference between radiocommunication systems, operating in shared frequency bands � WP 6S 2004-05-04
[ 26 ]
Liaison statement to ITU-R Working Party 1B and Working Parties 4A and 4B of Study Group 4 � ITU-D Study Group 1 2004-04-07
[ 25 ]
Liaison statement to WP 1B - Use of the REML (Relative Energy Margin Loss) interference metric in the radio astronomy service � WP 7D 2004-03-31
[ 24 ]
Liaison statement to Working Party 1B - Response to WP 1B liaison statement on the application of a uniform criterion of evaluating interference between Radiocommunication networks � WP 7C 2004-03-26
[ 23 ]
Liaison statement to Working Party 1B - Response to Working Party 1B liaison statement on the application of a uniform criterion of evaluating interference between radicommunication networks � WP 7B 2004-03-22
[ 22 ]
Response to the liaison statement from Working Party 1B concerning criteria for evaluating interference between radiocommunication networks operating in shared frequency bands � WP 8F 2004-03-17
[ 21 ]
Liaison statement to Working Party 1B - Application of a uniform criterion of evaluating interference between radiocommunication networks � WPs 9A and 9D 2004-02-27
[ 20 ]
Liaison statement to Working Party 1B - The application of a uniform criterion of evaluating interference between radio communication networks � WP 4-9S 2004-02-18
[ 19 ]
Response to the liaison statement from WP 1B - Criteria for the evaluation of interference between radiocommunication networks operating in a shared frequency band � WP 8D 2004-01-29
[ 18 ]
Response to the Liaison statement from Working Party 1B concerning criteria for evaluation interference between radiocommunication networks operating in shared frequency bands � WP 8B 2004-01-15
[ 17 ]
Liaison statement from Working Party 8A - Criteria for the evaluation of interference between radiocommunication networks operating in a shared frequency band � WP 8A 2003-12-15
[ 16 ]
+Ann.1-8
Report on the meeting of Working Party 1B - Geneva, 30 October to 5 November 2003 � Chairman, WP 1B 2003-11-11
[ 15 ]
Final List of Participants - Working Party 1B � Director, BR 2003-11-04
[ 14 ]
List of documents issued � BR Study Group Department 2003-10-29
[ 13 ]
Contribution to promote a Report on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1 � France 223/1 2003-10-29
[ 12 ]
Proposed work programme for Working Party 1B � Chairman, WP 1B 2003-10-28
[ 11 ]
Report of the Chairman of Study Group 1, its Working Parties and Task Group � Chairman, SG 1 2003-10-24
[ 10 ]
Preliminary draft revision of Recommendation ITU-R SM.1538 - Technical parameters and spectrum requirements for short-range radiocommunication devices � Korea (Republic of) 213/1 2003-10-23
[ 9 ]
Draft working document towards a preliminary draft new Report on Technical convergence with respect to terrestrial fixed, mobile, and broadcasting interactive multimedia applications � Sweden 224/1 2003-10-24
[ 8 ]
Improving the international spectrum regulatory framework � United States of America 2003-10-23
[ 7 ]
Draft new Question - Improving the international spectrum regulatory framework � United States of America 2003-10-21
[ 6 ]
Contribution to carry on the work towards a preliminary draft new Recommendation on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1 � India (Republic of) 223/1 2003-10-20
[ 5 ]
Draft Revision of Question ITU-R 209/1 - Parameters of radio systems and equipment required for spectrum management and the efficient use of the radio spectrum � Russian Federation 209/1 2003-10-15
[ 4 ]
Working materials towards Draft New Recommendation ITU-R SM.[...] - Index for the evaluation of harmful effect of interference between radio communication networks operating in a shared frequency band � Russian Federation 2003-10-15
[ 3 ]
Contribution to carry on the work towards a PDNR on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1 � Brazil (Federative Republic of) 223/1 2003-10-08
[ 2 ]
Recommendations brought to the attention of Radiocommunication Study Group 1, its Working Parties or Task Groups � Chairman, SG 1 2003-08-15
[ 1 ]
Documents to be carried over from the 2000-2003 study period � WP 1B 2003-07-15
Results:136 total items.
Result page:� Previous�-� 1 - 2 - 3
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-17