International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7E : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7E� C�

ITU-R�WP7E

Inter-service sharing and compatibility

Results:121 total items.
Result page:� Previous�-� 1 - 2 - 3
Contributions��Documents / Contributions

Number
Title Source Date
[ 21 ]
Liaison statement to Working Parties 4A, 7E and 8D concerning Agenda item 1.11 of WRC-03 � WP 7D 2001-10-17
[ 20 ]
Liaison statement to WPs 7E and 8D concerning Agenda item 1.16 of WRC-03 � WP 7D 2001-10-17
[ 19 ]
Liaison statement to Working Parties 7E and 8D concerning Agenda item 1.15 of WRC-03 � WP 7D 2001-10-17
[ 18 ]
Liaison statement to WPs 7E and 8D concerning Agenda item 1.11 of WRC-03 � WP 7B 2001-10-17
[ 17 ]
Liaison statement to Working Party 7E - Sharing studies between spaceborne active sensors and radiolocation systems in the 35.5-36 GHz band � WP 7C 2001-10-17
[ 16 ]
LS to WPs 6E, 6S, 7E, 7D, 8A, 8B, 8D and 9D on the WRC-03 Agenda item 1.12, Res. 723, resolves 1 - Summary of the available information on the provision of spectrum, for telecommand links in the � WP 7B Ad Hoc Group 2 2001-10-17
[ 15 ]
Liaison statement to Working Party 8D - Sharing between the Metaids and Metsat services and the mobile-satellite service in the band 1 670-1 700 MHz � WP 7C 2001-10-17
[ 14 ]
Report from the Liaison Rapporteurs on WRC-2003 Agenda items for which WP 7E designated as interested group � Liaison Rapporteur Coordinator 2001-10-17
[ 13 ]
Liaison statement to Working Parties 7B and 7E - WRC-03 Agenda item 1.12 � WP 9D 2001-10-17
[ 12 ]
Liaison statement to Task Group 1/7 - Present status of the compatibility studies between the fixed service using high altitude platform stations and science services including radio astronomy service and Earth Exploration-Satellite Service (passive) performed in accordance with Resolution 122 (Rev.WRC-2000) � WP 9D 2001-10-17
[ 11 ]
Liaison statement to Working Parties 7C, 7D, 7E and 9D - Studies concerning WRC-03 agenda item 1.16 � WP 8D 2001-10-17
[ 10 ]
Liaison statement to WPs 9B, 9D, 7C and 7E - Impact of HAPS interference to EESS (passive) operations in the 31.3-31.8 GHz band � WP 4-9S 2001-10-17
[ 9 ]
Liaison statement to WPs 7C and 7E - Studies related to WRC-03 agenda item 1.38 EESS (active) and existing services in the band 420-470 MHz � WP 8A 2001-10-17
[ 8 ]
Liaison statement to Working Party 7E - Sharing between high-density links in the fixed service and other services in the frequency range from 30 GHz to about 50 GHz � WP 9D 2001-10-17
[ 7 ]
Liaison statement to ITU-R Study Group 1 and Working Parties 6M, 6E, 7E, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems � JTG 1-6-8-9 2001-10-17
[ 6 ]
Report on the first meeting of Working Party 7E (Vancouver, 28-29 July 2000) � Chairman, WP 7E 2001-10-17
[ 5 ]
Liaison statement to Working Party 7E - The role of Working Party 7E with respect to CPM-02 text addressing WRC-2003 Agenda item 1.22 � WP 8F 2001-10-17
[ 4 ]
List of participants (Richmond, 28-29 July 2000) � WP 7E 2001-10-17
[ 3 ]
List of documents issued � BRSGD 2001-10-17
[ 2 ]
Allocation of ITU-R preparatory work for WRC-03 to Working Party 7E � Chairman, WP 7E 2001-10-17
[ 1 ]
Liaison statement from Working Party 3M to Working Parties 7E and 9D concerning sharing between high-density links in the fixed service and other services in the frequency range from 30 to about 50 GHz � WP 3M 2001-10-17
Results:121 total items.
Result page:� Previous�-� 1 - 2 - 3
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2002-08-28