Cartas Colectivas�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 6 ]
�
� |
Reuni�n virtual de la Comisi�n de Estudio 15, 7-18 de septiembre de 2020
�
� |
TSB
� |
QALL/15
� |
2020-06-30 |
� � |
Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 2274 ]
�
� |
G.mgfast: Proposed text update for clause 10.7 (DTFO)
�
� |
Maxlinear Inc (United States)
� |
Q4/15
� |
2020-08-25 |
|
[ 2273 ]
�
� |
G.mgfast: Logical frame format supporting DTFO in FDX mode
�
� |
Maxlinear Inc (United States)
� |
Q4/15
� |
2020-08-25 |
|
[ 2272 ]
�
� |
Document withdrawn - Posted as TD646/WP3
�
� |
N/A (no se aplica)
� |
� |
2020-08-25 |
|
[ 2271 ]
�
� |
G.8261: SyncE Network Limits for Fronthaul Applications
�
� |
Calnex Solutions Limited (United Kingdom)
� |
Q13/15
� |
2020-08-25 |
|
[ 2270 ]
�
(Rev.1)� |
400 Gb/s DP-16QAM Reference Receiver Settings for EVM Testing
�
� |
Ciena Canada
� |
Q6/15
� |
2020-08-25 |
Documentos presentados : 5 de un total de 301� relacionaron a este reuni�n (vea m�s...)
� � |
Documentos Temporales�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 435-GEN ]
�
� |
LS/i on Incubation mechanism in SG17
�
� |
ITU-T Study Group 17
� |
QALL/15
� |
2020-09-13 |
|
[ 433-GEN ]
�
(Rev.1)� |
Final list of participants E-meeting, 7-18 September 2020)
�
� |
TSB
� |
QALL/15
� |
2020-09-07 |
|
[ 432-GEN ]
�
� |
Current and potential stale work items
�
� |
TSB
� |
QALL/15
� |
2020-09-06 |
|
[ 431-GEN ]
�
� |
Liaison report from IEC SC86A WG1
�
� |
IEC SC86A WG1 Liaison Rapporteur
� |
QALL/15
� |
2020-09-05 |
|
[ 430-GEN ]
�
� |
Liaison report from IEC SC86A WG3
�
� |
IEC SC86A WG3 Liaison Rapporteur
� |
QALL/15
� |
2020-09-05 |
Documentos presentados : 5 de un total de 420� relacionaron a este reuni�n (vea m�s...)
� � |
Informe�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 27 ]
�
� |
Report of Working Party 3/15, Transport network characteristics (E-meeting, 7-18 September 2020)
�
� |
Study Group 15
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
� |
2020-11-12 |
|
[ 26 ]
�
� |
Report of Working Party 2/15, Optical technologies and physical infrastructures (E-meeting, 7-18 September 2020)
�
� |
Study Group 15
� |
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
� |
2020-11-12 |
|
[ 25 ]
�
� |
Report of Working Party 1/15, Transport aspects of access, home and smart grid networks (E-meeting, 7-18 September 2020)
�
� |
Study Group 15
� |
Q4/15, Q2/15, Q18/15, Q15/15, Q1/15
� |
2020-11-12 |
|
[ 24 ]
�
� |
Report of the sixth meeting of Study Group 15, Networks, Technologies, and Infrastructure for Transport, Access and Home ((E-meeting, 7-18 September 2020)
�
� |
Study Group 15
� |
QALL/15
� |
2020-11-12 |
� � |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):