Cartas Colectivas�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 1 ]
�
� |
Reuni�n de la Comisi�n de Estudio 15, Ginebra, 16-27 de mayo de 2005
�
� |
SG 15
� |
� |
2005-02-23 |
� � |
Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 26 ]
�
� |
Amendment to Recommendation G.983.1: PICS (Protocol Implementation Conformance Statement) for ONU in G.983.1 (for agreement)
�
� |
Editor Rec. G.983.1
� |
Q2/15
� |
2005-03-23 |
|
[ 25 ]
�
� |
Amendment to Recommendation G.983.1: PICS (Protocol Implementation Conformance Statement) for OLT in G.983.1 (for agreement)
�
� |
Editor Rec. G.983.1
� |
Q2/15
� |
2005-03-23 |
|
[ 24 ]
�
� |
Draft ITU-T Recommendation G.984.4 Amendment 1 (Rev. 0.0) (for consent)
�
� |
Rapporteur Question 2/15
� |
Q2/15
� |
2005-03-23 |
|
[ 23 ]
�
� |
Amendment 1 to Recommendation G.984.3, Gigabit-capable Passive Optical Networks (G-PON): Transmission Convergence Layer Specification (for consent)
�
� |
Editor Rec. G.984.3
� |
Q2/15
� |
2005-03-23 |
|
[ 22 ]
�
� |
Amendment 2 to Recommendation G.983.3, A broadband optical access system with increased service capability by wavelength allocation (for consent)
�
� |
Editor Rec. G.983.3
� |
Q2/15
� |
2005-03-23 |
Documentos presentados : 5 de un total de 12� relacionaron a este reuni�n (vea m�s...)
� � |
Contribuciones Tard�as�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 456 ]
�
� |
WITHDRAWN - See D435
�
� |
N/A (no se aplica)
� |
Q4/15
� |
2005-05-10 |
|
[ 455 ]
�
� |
Architectural considerations on Ethernet Services and Transport Ethernet
�
� |
Siemens
� |
Q12/15
� |
2005-05-09 |
|
[ 454 ]
�
� |
WITHDRAWN
�
� |
N/A (no se aplica)
� |
Q6/15
� |
2005-05-09 |
|
[ 453 ]
�
� |
G.test: A pseudo random Gaussian white noise generator for REIN testing
�
� |
BT
� |
Q4/15
� |
2005-05-06 |
|
[ 452 ]
�
� |
Impulse Noise Protection Optimisation
�
� |
BT
� |
Q4/15
� |
2005-05-06 |
Documentos presentados : 5 de un total de 281� relacionaron a este reuni�n (vea m�s...)
� � |
Documentos Temporales�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 93-GEN ]
�
� |
Final list of participants
�
� |
TSB
� |
QALL
� |
2005-05-27 |
|
[ 92-GEN ]
�
� |
Optical Transport Networks & Technologies Standardization Work Plan, Issue 6
�
� |
Rapporteur Q3/15
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q7/15, Q6/15, Q3/15
� |
2005-05-24 |
|
[ 91-GEN ]
�
� |
Interim activities
�
� |
Chairman WP2/15
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q7/15, Q6/15, Q3/15
� |
2005-05-23 |
|
[ 90-GEN ]
�
� |
Response on the PCE Working Group
�
� |
IETF PCE WG
� |
Q14/15, Q12/15, Q6/15
� |
2005-05-23 |
|
[ 89-GEN ]
�
� |
Nomination of Liaison Officer for IEC TC86/SC86B
�
� |
IEC TC86 SC86B
� |
QALL
� |
2005-05-23 |
Documentos presentados : 5 de un total de 345� relacionaron a este reuni�n (vea m�s...)
� � |
Informe�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 9 ]
�
� |
Report of the second meeting of Working Party 3/15 - OTN Structure (Geneva, 16-27 May 2005) - Part I - General
�
� |
SG 15
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
� |
2005-07-11 |
|
[ 8 ]
�
� |
Report of the second meeting of Working Party 2/15 - OTN Technology (Geneva, 16-27 May 2005) - Part I - General
�
� |
SG 15
� |
Q10/15, Q8/15, Q7/15, Q6/15, Q5/15
� |
2005-07-11 |
|
[ 7 ]
�
� |
Report of the second meeting of Working Party 1/15 - Optical and metallic access network (Geneva, 16-27 May 2005) - Part I - General
�
� |
SG 15
� |
Q4/15, Q2/15, Q1/15
� |
2005-07-11 |
|
[ 6 ]
�
� |
Report of the second meeting of Study Group 15 - Optical and other transport networks
(2005-2008) - (Geneva, 16 - 27 May 2005) - General
�
� |
SG 15
� |
Q1-14/15
� |
2005-07-11 |
� � |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):