Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG11 : Documentos de la reuni�n� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG11� ALL�(2007-04-23)�

UIT-T�SG11

Control de sesi�n, portadora y recursos; Control de vinculaci�n, pruebas y manual

Periodo de estudios 2005

Reuni�n� del 2007-04-23 al 2007-04-27

Lugar : Suiza [Ginebra]

Cartas Colectivas��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 7 ]
Reuni�n de la Comisi�n de Estudio 11, Ginebra, 23 - 27 de abril de 2007 � SG 11 2007-01-18

Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 84 ]
Correction of Q.3303.3 � Alcatel-Lucent 5/11 2007-04-13
[ 83 ]
Mobility Support in NACF R2 � ETRI 7/11 2007-04-13
[ 82 ]
Signalling architecture and requirements of NACF supporting MIPv6 protocols � ETRI 7/11 2007-04-13
[ 81 ]
Proposal to add parameter information to section 7 in draft Q. NGN-trx. profile � China Telecom 7/11 2007-04-13
[ 80 ]
Proposed modifications to subsection 6.3 of Q.sup_req � China Telecom 3/11 2007-04-13
Documentos presentados : 5 de un total de 80� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 598-GEN ]
(Rev.1-2)
Q.5/11 meeting report � Q.5/11 Rapporteur 5/11 2007-04-26
[ 597-GEN ]
Output draft of Q.rsf : Signalling Flows and Parameter Mapping for Resource Control � Editor (Sudhir Mittal) 5/11 2007-04-26
[ 596-GEN ]
Work program updates for Q.5/11 � Q.5/11 Rapporteur 5/11 2007-04-26
[ 595-GEN ]
(Rev.1)
Draft Q.rcp5 (Rt interface protocol) - Q.5/11 Meeting output � Editor (Ms. Dina El abed) 5/11 2007-04-26
[ 594-GEN ]
Q.4/11 Report � Rapporteur, Q.4/11 4/11 2007-04-26
Documentos presentados : 5 de un total de 163� relacionaron a este reuni�n (vea m�s...)

Informe��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 26 ]
Report of the Meeting of Working Party 3/11 (Geneva, 23 - 27 April 2007) � SG 11 Q8/11, Q7/11, Q6/11 2007-05-11
[ 25 ]
Report of the Meeting of Working Party 2/11 (Geneva, 23 - 27 April 2007) � Sg 11 Q5/11, Q4/11, Q3/11 2007-05-11
[ 24 ]
Report of the Meeting of Working Party 1/11 (Geneva, 23 - 27 April 2007) � SG 11 Q2/11, Q1/11 2007-05-11
[ 23 ]
Report of the Meeting of Study Group 11 (Geneva, 23 - 27 April 2007) � SG 11 QALL/11 2007-05-11

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25