Cartas Colectivas�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 5 ]
�
� |
Reuni�n de la Comisi�n de Estudio 11, Ginebra, 11-22 de noviembre de 2002
�
� |
SG 11
� |
� |
2002-08-15 |
� � |
Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 3 ]
�
� |
Propuesta para estudiar el protocolo para control de conexi�n IP en redes de acceso radioel�ctrico
�
� |
Australia
� |
QALL/11
� |
2002-08-26 |
|
[ 2 ]
�
� |
Report on an Interim Meeting to Support IEPS by ISUP Protocol Versions (Mainz, Germany, 15-18 July 2002)
�
� |
SG 11 Coordinator
� |
Q11/11, Q12/11, Q6/11
� |
2002-09-04 |
� � |
Contribuciones Tard�as�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 446 ]
�
� |
Proposed changes to draft Q.2630.3 for mandatory support of AAL Type 2 Transfer Capability
�
� |
Siemens AG, Germany
� |
Q15/11
� |
2002-10-30 |
|
[ 445 ]
�
� |
Section D.5/Q.2630.2 - SDL Diagrams for Q.2630.2
�
� |
Swisscom Ltd.
� |
Q15/11
� |
2002-10-29 |
|
[ 444 ]
�
� |
Connectionless Procedures
�
� |
Swisscom Ltd.
� |
Q13/11
� |
2002-10-29 |
|
[ 443 ]
�
� |
Signalling Network Architecture - � 5 for TI-SCCP
�
� |
Swisscom Ltd
� |
Q13/11
� |
2002-10-29 |
|
[ 442 ]
�
� |
Further Considerations of the Procedures for OPC
�
� |
Swisscom Ltd.
� |
Q13/11
� |
2002-10-29 |
Documentos presentados : 5 de un total de 138� relacionaron a este reuni�n (vea m�s...)
� � |
Documentos Temporales�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 38-PLEN ]
�
� |
WP2/11 Document Roadmap for SG11 Plenary
�
� |
WP2/11 Chairman (G. Ratta)
� |
Q6/11, Q7/11, Q8/11, Q9/11
� |
2002-11-22 |
|
[ 37-PLEN ]
�
� |
SG11 INVOLVEMENT IN NGN 2004 PROJECT
�
� |
SG11
� |
QALL/11
� |
2002-11-22 |
|
[ 36-PLEN ]
�
(Rev.1-3)� |
WP3/11 Meeting Draft Report
�
Rev. 1 & 2 are available only electronically
� |
WP3/11 Chairman (A. Le Roux)
� |
Q10/11, Q11/11, Q12/11, Q16PNEW/11
� |
2002-11-22 |
|
[ 35-PLEN ]
�
(Rev.1-2)� |
Liaison Statements from WP3/11
�
Rev. 1 is available only electronically
� |
WP3/11 Chairman (A. Le Roux)
� |
Q10/11, Q11/11, Q12/11, Q16PNEW/11
� |
2002-11-22 |
|
[ 34-PLEN ]
�
(Rev.1) +Add.1� |
Proposed Workplan for September 2003 Meeting of SG11
�
� |
WP3/11 Chairman (A. LeRoux)
� |
QALL/11
� |
2002-11-22 |
Documentos presentados : 5 de un total de 260� relacionaron a este reuni�n (vea m�s...)
� � |
Informe�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 53 ]
�
� |
Implementors' guide (11/2002) for Recommendation Q.2630.2 (12/2000)
�
� |
SG 11
� |
Q15/11
� |
2002-12-10 |
|
[ 52 ]
�
� |
Implementors' guide (11/2002) for Recommendation Q.2630.1 (12/1999)
�
� |
SG 11
� |
Q15/11
� |
2002-12-10 |
|
[ 51 ]
�
� |
Report of the meeting held in Geneva from 11 November to 22 November 2002 - Part I - Report of Working Party 4/11 (Engineering of AAL2 signalling and common signalling protocols)
�
� |
SG 11
� |
Q15/11, Q14/11, Q13/11
� |
2002-12-10 |
|
[ 50 ]
�
� |
Report of the meeting held in Geneva from 11 November to 22 November 2002 - Part I - Report of Working Party 3/11 (Engineering of BICC and legacy signalling)
�
� |
SG 11
� |
Q16/11, Q12/11, Q11/11, Q10/11
� |
2002-12-10 |
|
[ 49 ]
�
� |
Report of the meeting held in Geneva from 11 November to 22 November 2002 - Part I - Report of Working Party 2/11 (Requirements for IP and advanced network applications)
�
� |
SG 11
� |
Q9/11, Q8/11, Q7/11, Q6/11
� |
2002-12-09 |
Documentos presentados : 5 de un total de 7� relacionaron a este reuni�n (vea m�s...)
� � |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):