Collective Letters�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 5 ]
�
� |
Meeting of Special Study Group, Geneva, 4-8 November 2002
�
� |
SSG
� |
� |
2002-08-14 |
� � |
Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 9 ]
�
� |
Proposed new service capability "Supporting individual selectable application sets" for Section 6 of PDNR: Q.SCFN
�
� |
NEC (Japan)
� |
Q1/SSG
� |
2002-08-21 |
|
[ 8 ]
�
� |
Proposed new service capability "Number portability" for Section 6 of PDNR: Q.SCFN
�
� |
NEC (Japan)
� |
Q1/SSG
� |
2002-08-21 |
|
[ 7 ]
�
� |
Proposed new service capability "Service portability" for Section 6 of PDNR: Q.SCFN
�
� |
NEC (Japan)
� |
Q1/SSG
� |
2002-08-21 |
|
[ 6 ]
�
� |
Deletion of sub-section 6.1 of PDNR: Q.SCFN
�
� |
NEC (Japan)
� |
Q1/SSG
� |
2002-08-21 |
|
[ 5 ]
�
� |
Proposed modifications of mobility definition to Section 3 of PDNR: Q.SCFN
�
� |
NEC (Japan)
� |
Q1/SSG
� |
2002-08-21 |
Currently viewing 5 of 7� documents related to this meeting (more...)
� � |
Delayed Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 127 ]
�
� |
Requirements of PSTN Enhanced Fixed Terminal Equipment to Achieve Convergence.
�
� |
India
� |
Q7/SSG
� |
2002-10-30 |
|
[ 126 ]
�
� |
Feasibility of Supporting In-band Signalling Procedures Between Smart Card based Fixed Terminal Equipment and Fixed Mobility Plane (FMP) To Achieve Discrete Terminal Mobility in PSTN/ISDN Networks.
�
� |
India
� |
Q7/SSG
� |
2002-10-30 |
|
[ 125 ]
�
� |
3GPP2 Specification - S.R0072 All IP Packet Data Surveillance Requirements
�
� |
Nortel Networks (Canada)
� |
Q7/SSG, Q6/SSG, Q2/SSG
� |
2002-10-29 |
|
[ 124 ]
�
� |
Reference Material on Lawful Intercept
�
� |
Nortel Networks (Canada)
� |
Q7/SSG, Q6/SSG
� |
2002-10-29 |
|
[ 123 ]
�
� |
A Way Forward On Proposed Revised Rec. A.9
�
� |
Canada
� |
Q8/SSG
� |
2002-10-29 |
Currently viewing 5 of 26� documents related to this meeting (more...)
� � |
Temporary Documents�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 38-GEN ]
�
� |
Joint Session of WP1 & WP3/SSG: a Report
�
� |
Acting WP3/SSG Chairman
� |
Q7/SSG, Q6/SSG, Q2/SSG, Q1/SSG
� |
2002-11-08 |
|
[ 37-GEN ]
�
� |
ETSI Workshop on Multi Services Network Technologies &Standardization for the NGN Environment
�
� |
SSG Vice Chairman
� |
QALL/SSG
� |
2002-11-08 |
|
[ 36-GEN ]
�
(Rev.1-2)� |
Joint Session Report of Q.2/SSG, Q.6/SSG & Q.7/SSG
�
� |
Q.2/SSG Rapporteur, Q.6/SSG Rapporteur
� |
Q7/SSG, Q6/SSG, Q2/SSG
� |
2002-11-08 |
|
[ 35-GEN ]
�
� |
Report on SG-13/SSG Information Sharing Session on NGN.
�
� |
Rapporteur for Q.6/SSG
� |
Q7/SSG, Q6/SSG, Q2/SSG
� |
2002-11-06 |
|
[ 34-GEN ]
�
+Add.1� |
Questions and Issues during the joint session with ITU-T SG13
�
� |
TSB
� |
Q7/SSG, Q6/SSG, Q2/SSG
� |
2002-11-06 |
Currently viewing 5 of 174� documents related to this meeting (more...)
� � |
Reports�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 12 ]
�
� |
Reports of WP 1/SSG (Service and interface requirements for IMT-2000 and Beyond), WP 2/SSG (Application and Interworking of IMT-2000 Systems) and 3/SSG (Harmonization and Convergence of IMT-2000 Systems) meetings (Geneva, 4-8 November 2002)
�
� |
SSG
� |
QALL/SSG
� |
2002-12-23 |
|
[ 11 ]
�
� |
Report of the Geneva meeting (4-8 November 2002)
�
� |
SSG
� |
QALL/SSG
� |
2002-12-13 |
� � |
Multiple Document Download:�Formats and Languages to be included (when available):