International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : TSAG : Meeting�2020-09-21�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�TSAG� TD�(2020-09-21)�

ITU-T�TSAG

ITU-T Telecommunication Standardization Advisory Group

Study Period 2017

Meeting� from 2020-09-21 to 2020-09-25

held in E-Meeting

Other Meetings : 2022-01-102021-10-252021-01-11� [ 2020-09-21 ]� 2020-02-102019-09-232018-12-102018-02-262017-05-01

Results:143 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Temporary Documents �(GEN)

Number
Title Source Date
[ 913 ]
(Rev.1-2)
Draft LS on "New IP", "Future Vertical Communications Networks and Protocols (FVCN)", Network 2030 [to ITU-T SGs 11 and 13] � TSAG 2020-09-24
[ 912 ]
WSC Terms of Reference revision history � Director, TSB 2020-09-24
[ 911 ]
Agenda for the TSAG plenary session on Tuesday, 22 September 2020, 12:30 - 13:00 hours CEST � TSAG Management Team 2020-09-21
[ 910 ]
ITU-T study group Question level statistics (2017-2020) � TSB 2020-09-17
[ 909 ]
ITU-T SG13 proposed revision to its mandate (WTSA Resolution 2 parts) � Chairman, ITU-T SG13 2020-09-15
[ 908 ]
LS/r on information about new work items and consent of ITU-T Recommendation Y.3109 on QoS aspects in Q6/13 (reply to SG13-LS167) [from ITU-T SG12] � ITU-T SG12 2020-09-14
[ 907 ]
LS on updated operational plan for WTSA-16 Resolution 95: ITU-T initiatives to raise awareness on best practices and policies related to service quality [from ITU-T SG12] � ITU-T SG12 2020-09-14
[ 906 ]
LS/r about TSAG Information Session on Network 2030 (reply to FG NET2030-LS5) [from ITU-T SG12] � ITU-T SG12 2020-09-14
[ 905 ]
LS on QoS and QoE thresholds for ACP - Preliminary reply to WTSA-16 Resolution 29: Alternative calling procedures on international telecommunication networks [from ITU-T SG12] � ITU-T SG12 2020-09-14
[ 904 ]
ITU-T databases overview � TSB 2020-09-14
[ 903 ]
LS on Incubation mechanism in SG17 [from ITU-T SG17] � ITU-T SG17 2020-09-12
[ 902 ]
Editorial updates to the Author's guide for drafting ITU-T Recommendations � TSB 2020-09-11
[ 901 ]
LS/r on WTSA-20 preparations concerning work programme and structure (reply to TSAG-LS27) [from ITU-T SG2] � ITU-T SG2 2020-09-08
[ 900 ]
Updated analysis from TSB investigations on the feasibility of automated generation of statistics � TSB 2020-09-09
[ 899 ]
LS/r on WTSA-20 preparations (reply to TSAG-LS20, TSAG-LS27) [from ITU-T SG3] � ITU-T SG3 2020-09-12
[ 898 ]
LS/r on Streamlining Resolutions (reply to TSAG-LS30R1) [from ITU-T SG13] � ITU-T SG13 2020-09-08
[ 897 ]
LS/r on draft ITU-T Study Group 17 REPORTs TO WTSA-20 - PART I - GENERAL (Annex 2 only), and Part II - QUESTIONS for the next study period (2021 - 2024) (reply to TSAG-LS27) [from ITU-T SG17] � ITU-T SG17 2020-09-08
[ 896 ]
LS/r on increasing efficiency of security work in ITU-T (reply to TSAG-LS27) [from ITU-T SG17] � ITU-T SG17 2020-09-08
[ 895 ]
(Rev.1)
Revised goals and terms of reference for the IEC/ISO/ITU World Standards Cooperation (WSC) � Director, TSB 2020-09-01
[ 894 ]
LS/r on hot topics (reply to TSAG-LS32) [from ITU-T SG3] � ITU-T SG3 2020-09-01
[ 893 ]
Q&A on oneM2M � ITU Secretariat 2020-08-16
[ 892 ]
LS on Deliverables of Focus Group NET2030 [from ITU-T SG13] � ITU-T SG13 2020-08-15
[ 891 ]
LS on Deliverables of Focus Group ML5G to ITU-T, ITU-R study groups and other groups [from ITU-T SG13] � ITU-T SG13 2020-08-14
[ 890 ]
LS on Continuation of JCA-IMT2020 with revised ToR [from ITU-T SG13] � ITU-T SG13 2020-08-14
[ 889 ]
LS/r on WTSA-20 regional focal points and coordinators (reply to TSAG-LS29) [from APT] � APT 2020-08-07
[ 888 ]
LS on revised text of SG13 Questions and updated SG13 text of Resolution 2 [from ITU-T SG13] � ITU-T SG13 2020-08-05
[ 887 ]
LS on New IP, Shaping Future Network [from ITU-T SG11] � ITU-T SG11 2020-08-04
[ 886 ]
LS on updated Questions texts, mandate and Lead Study Group roles of ITU-T SG11 for the next Study Period (2021-2024) [from ITU-T SG11] � ITU-T SG11 2020-08-04
[ 885 ]
ITU-T SG9 proposals to WTSA-20 for its Questions and Mandate (Res.2 portion) � ITU-T SG9 Chairman 2020-08-03
[ 884 ]
(Rev.1)
ITU-T SG16 proposals to WTSA-20 for its Questions and Res.2 at its final meeting in the study period 2017-2020 (Virtual, 22 June - 3 July 2020) � ITU-T SG16 Chairman 2020-07-28
[ 883 ]
(Rev.1)
LS/r on WTSA-20 preparations concerning work programme and structure (reply to TSAG-LS27) [from ITU-T SG20] � ITU-T SG20 2020-07-22
[ 882 ]
LS on Collaboration between ITU and oneM2M [from ITU-T SG20] � ITU-T SG20 2020-07-22
[ 881 ]
LS/r on hot topics (reply to TSAG-LS32) [from ITU-T SG2] � ITU-T SG2 2020-07-17
[ 880 ]
(Rev.1)
LS/r on WTSA Preparation (reply to TSAG-LS27) [from ITU-T SG5] � ITU-T SG5 2020-07-02
[ 879 ]
LS/r on New IP, Shaping Future Network (reply to TSAG-LS23) [from ITU-T SG5] � ITU-T SG5 2020-06-25
[ 878 ]
LS/r on ITU inter-Sector coordination (reply to TSAG-LS22) [from ITU-T SG5] � ITU-T SG5 2020-06-25
[ 877 ]
LS/r on results of FG-DLT (reply to TSAG-LS24) [from ITU-T SG5] � ITU-T SG5 2020-06-25
[ 876 ]
LS/r on hot topics (reply to TSAG-LS32) [from ITU-T SG5] � ITU-T SG5 2020-06-25
[ 875 ]
LS/r on WTSA-20 preparations (reply to TSAG-LS20) [from ITU-T SG12] � ITU-T SG12 2020-06-23
[ 874 ]
LS on Telecommunication Management and OAM Project Plan [from ITU-T SG2] � ITU-T SG2 2020-06-09
[ 873 ]
LS/r on Telecommunication Management and OAM Project Plan (SG2-LS140) [from ITU-T SG9] � ITU-T SG9 2020-05-21
[ 872 ]
LS/r on the new version of the Access Network Transport (ANT) Standards Overview and Work Plan (SG15-LS226) [from ITU-T SG9] � ITU-T SG9 2020-05-21
[ 871 ]
LS/r on hot topics (TSAG-LS32) [from ITU-T SG9] � ITU-T SG9 2020-05-21
[ 870 ]
LS/r on ITU inter-Sector coordination (TSAG-LS22R1) [from ITU-T SG9] � ITU-T SG9 2020-05-21
[ 869 ]
Adjustments to harmonize the WTSA-20 proposals by SG16 and SG20 � Chairmen ITU-T SG2, SG16 and SG20 2020-09-23
[ 868 ]
Draft LS on ITU-T inter-regional meetings � TSAG 2020-09-24
[ 867 ]
IRM: WTSA-20 updates of the regional preparations � TSB 2020-04-21
[ 866 ]
IRM: ITU-T SG20 highlights SP2017-2020 � Chairman, ITU-T SG20 2020-04-21
[ 865 ]
IRM: ITU-T SG17 highlights SP2017-2020 � Chairman, ITU-T SG17 2020-04-21
[ 864 ]
IRM: ITU-T SG16 highlights SP2017-2020 � Chairman, ITU-T SG16 2020-04-21
Results:143 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2020-11-04