Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 11 : Reuni�n�2017-07-12�: Documentos Temporales� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 11� TD�(2017-07-12)�

UIT-T�SG 11

Protocols and test specifications

Periodo de estudios 2017

Reuni�n� del 2017-07-12 al 2017-07-13

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-012021-07-152021-03-172020-12-182020-12-042020-11-192020-07-222020-03-042019-10-162019-06-262019-03-062018-10-312018-07-182017-11-08� [ 2017-07-12 ]� 2017-02-06

Documentos Temporales �(WP1) ��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 18-WP1 ]
(Rev.1)
Draft Report for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 12 July 2017) � Chairman WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2017-07-11
[ 17-WP1 ]
Agenda for Interim Meeting of WP1/11 "Signalling requirements and protocols for emerging telecommunications networks" � Chairman WP1/11 Q5/11, Q4/11, Q3/11, Q2/11, Q1/11 2017-07-11
[ 16-WP1 ]
Withdrawn � N/A (no se aplica) � 2017-07-11
[ 15-WP1 ]
Output - draft new Recommendation of Q.BNG-DBOD "Signalling requirements for dynamic bandwidth adjustment on demand on broadband network gateway implemented by SDN technologies" � Editors Q5/11 2017-07-11
[ 14-WP1 ]
Report for Q5/11 meeting "Protocols and procedures supporting services provided by broadband network gateways" (e-meeting, 5 July 2017) � Associate Rapporteur Q5/11 Q5/11 2017-07-11
Documentos presentados : 5 de un total de 18� relacionaron a este reuni�n (vea m�s...)

Documentos Temporales �(WP2) ��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 22-WP2 ]
(Rev.1)
Draft report for Working Party 2/11 "Control and management protocols for IMT-2020" (Geneva, 13 July 2017) � Chairman WP2/11 Q8/11, Q7/11, Q6/11 2017-07-13
[ 21-WP2 ]
(Rev.1)
Agenda for WP2/11 "Control and management protocols for IMT-2020" � Chairman WP2/11 Q8/11, Q7/11, Q6/11 2017-07-13
[ 20-WP2 ]
(Rev.1)
Report of Rapporteur meeting of Question 8/11 (Geneva, 3-12 July 2017) � Rapporteur Q8/11 Q8/11 2017-07-13
[ 19-WP2 ]
(Rev.1-2)
Report of Q7/11 Rapporteur meeting "Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020" (Geneva, 3-12 July 2017) � Rapporteur Q7/11 Q7/11 2017-07-13
[ 18-WP2 ]
Output-Draft Recommendation Q.MEA-SRA "Signalling requirement and architecture for media service entity attachment" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017) � Editors Q7/11 2017-07-13
Documentos presentados : 5 de un total de 22� relacionaron a este reuni�n (vea m�s...)

Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2017-07-18