Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1162 ]
�
� |
Withdrawn by submitter
�
� |
N/A
� |
� |
2014-11-11 |
|
[ 1161 ]
�
� |
T-BC with 1PPS input (aka T-GM) specification [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1160 ]
�
� |
Updates to T-TSC and comparison to T-BC [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1159 ]
�
� |
T-BC Specification without SyncE [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1158 ]
�
� |
Use case analysis of the DSL-PLC interference mitigation mechanism and proposal of initial working text
�
� |
Marvell Semiconductor Inc.
� |
Q4/15, Q18/15
� |
2014-11-11 |
|
[ 1157 ]
�
� |
Holdover Performance with SyncE of T-BC [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1156 ]
�
� |
Profile Proposals including BMCA [G.8275.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1155 ]
�
� |
Modification of OOC PSD Note to allow OOC PSD Relief via ONU Power Leveling for G.989.2 amendment 1
�
� |
Calix Networks, Inc.
� |
Q2/15
� |
2014-11-11 |
|
[ 1154 ]
�
� |
G.fast, G.bond: Bonding of multiple G.fast links
�
� |
ADTRAN
,
AT&T, Inc.
� |
Q4/15
� |
2014-11-11 |
|
[ 1153 ]
�
� |
G.fast: Proposed text changes for the draft Amendment 1
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1152 ]
�
� |
Crosstalk model and mux/demux measurements for determination of TEE tuning requirements
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Transmode Systems AB
� |
Q6/15
� |
2014-11-11 |
|
[ 1151 ]
�
� |
PLC-DSL Coordination Scheme
�
� |
Broadcom Corporation
� |
Q4/15, Q18/15
� |
2014-11-11 |
|
[ 1150 ]
�
� |
Clause 17.1: Announcement - Proposed open issue resolutions
�
� |
Verizon Communication Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1149 ]
�
� |
G.989.3: New Appendix - Consistent Ranging
�
� |
Verizon Communication Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1148 ]
�
� |
Proposal to use VSM for Bandwidth Notification
�
� |
Alcatel-Lucent USA Inc.
� |
Q10/15
� |
2014-11-11 |
|
[ 1147 ]
�
� |
G.7712 updates to add an out-of-Band protocol for reporting OPS and OCh status
�
No file provided
� |
Coriant GmbH & Co. KG
� |
Q14/15
� |
2014-11-11 |
|
[ 1146 ]
�
� |
G.989.3: Comments on the PLOAM channel
�
� |
Verizon Communication Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1145 ]
�
� |
Proposal regarding unidirectional failures in the context of G.mdsp
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-11-11 |
|
[ 1144 ]
�
� |
G.mdsp scope, definitions, and network objectives
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-11-11 |
|
[ 1143 ]
�
� |
Clause 14: Monitoring, Supervision, and Defects
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
Verizon Communication Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1142 ]
�
� |
Proposal regarding the null Interconnected Domain case
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-11-11 |
|
[ 1141 ]
�
� |
Draft working text for the new Recommendation "Secure admission in G.hn networks"
�
� |
Marvell Semiconductor Inc.
� |
Q18/15
� |
2014-11-11 |
|
[ 1140 ]
�
� |
Draft G.7714.1 changes to add Neighbour Discovery for Ethernet and MPLS-TP
�
� |
Coriant GmbH & Co. KG
� |
Q14/15
� |
2014-11-11 |
|
[ 1139 ]
�
� |
Proposal to update the Q9/15 living list
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-11-11 |
|
[ 1138 ]
�
� |
Clause 17.2: Calibration
�
� |
Verizon Communication Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1137 ]
�
� |
Revised proposal for G.695 application code C4S1 9D1F
�
� |
Finisar Corporation
� |
Q6/15
� |
2014-11-11 |
|
[ 1136 ]
�
� |
Proposed Editorial Modification to Rec. G.959.1
�
� |
Finisar Corporation
� |
Q6/15
� |
2014-11-11 |
|
[ 1135 ]
�
� |
Clause 17.4: ONU wavelength locking
�
� |
Telecom Italia S.p.A.
,
Verizon Communication Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1134 ]
�
� |
Revised proposed parameter values for G.959.1 application code 4L1-9D1F
�
� |
Finisar Corporation
� |
Q6/15
� |
2014-11-11 |
|
[ 1133 ]
�
� |
Clause 17.1: Announcement
�
� |
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
� |
Q2/15
� |
2014-11-11 |
|
[ 1132 ]
�
� |
Comments on options in the CPRI Option 7 Breakout Report
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1131 ]
�
� |
Using GFP-T to map CPRI clients into OTU2c
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1130 ]
�
� |
Recommendations for providing a ODUC identifier in ODUCn
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1128 ]
�
� |
G.fast: On the low power mode link-state transitions (Amd1)
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2014-11-11 |
|
[ 1127 ]
�
� |
Cesium time holdover
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1126 ]
�
� |
Standardized OTN Link Degradation Parameter for OTN Links with FEC
�
� |
Xtera Communications, Inc.
� |
Q11/15
� |
2014-11-11 |
|
[ 1125 ]
�
� |
PRTC ensemble (GNSS + Cs) architecture and technology
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1124 ]
�
� |
Downstream WNE-PSD in NGPON2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-11-11 |
|
[ 1123 ]
�
� |
PMD Parameters for Low Loss Budget ODNs
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-11-11 |
|
[ 1122 ]
�
� |
Packet-Filtered Offset Time Error [G.8260]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1121 ]
�
� |
8 Channel TWDM in NGPON2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-11-11 |
|
[ 1120 ]
�
� |
Combining two-way flows [G.8260]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1119 ]
�
� |
Improving EEC
�
� |
Vitesse Semiconductor Corporation
� |
Q13/15
� |
2014-11-11 |
|
[ 1117 ]
�
� |
Structure of Appendix on Metrics [G.8260]
�
� |
Microsemi
� |
Q13/15
� |
2014-11-11 |
|
[ 1116 ]
�
� |
Upstream wavelength plan in NGPON2
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q2/15
� |
2014-11-11 |
|
[ 1115 ]
�
� |
Partial timing support metrics in a network containing BCs, G.8260
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-11-11 |
|
[ 1114 ]
�
� |
Network limit for assisted partial timing support in G.8271.2
�
� |
Nokia Solutions and Networks Gmbh & Co. KG
� |
Q13/15
� |
2014-11-11 |
|
[ 1113 ]
�
� |
G.8271.2: Potential Indoor Deployment Budget
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2014-11-11 |
|
[ 1112 ]
�
� |
G.989.3 rogue scenarios as hooks for G.Sup49
�
� |
Vodafone Group Services Ltd.
� |
Q2/15
� |
2014-11-11 |
|
[ 1111 ]
�
� |
Comment on Inter-OLT duplex modes of type B protection in G.989.1Amd1
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2014-11-11 |
Results:382 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):