Temporary Documents
�(WP4)
�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 47-WP4 ]
�
� |
Draft Report of the joint meeting of ITU-T WP4/11 and ETSI TC INT (Sophia Antipolis, 21-24 March 2016)
�
� |
Chairman WP4/11
� |
Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11
� |
2016-05-31 |
|
[ 46-WP4 ]
�
� |
Final list of participants
�
� |
TSB
� |
Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11
� |
2016-05-23 |
|
[ 45-WP4 ]
�
(Rev.1)� |
Report of the joint interim Rapporteur's group meeting of ITU-T Q11/11 and ETSI TC INT (Sophia Antipolis, 21-24 March 2016)
�
� |
Rapporteur Q11/11
� |
Q11/11
� |
2016-03-24 |
|
[ 44-WP4 ]
�
� |
LS/o on Draft new Recommendation on "SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP" (Q.4016v.1_FAX_req and tests) [to ITU-T SG16]
�
� |
Rapporteur Q11/11
� |
Q11/11
� |
2016-03-24 |
|
[ 43-WP4 ]
�
� |
Report of the joint interim Rapporteur's group meeting of ITU-T Q15/11 and ETSI TC INT (Sophia Antipolis, 21-24 March 2016)
�
� |
Acting Rapporteur Q15/11
� |
Q15/11
� |
2016-03-24 |
|
[ 42-WP4 ]
�
� |
Report of the joint interim Rapporteur's group meeting of ITU-T Q10/11 and ETSI TC INT (Sophia Antipolis, 21-24 March 2016)
�
� |
Rapporteur Q10/11
� |
Q10/11
� |
2016-03-24 |
|
[ 41-WP4 ]
�
� |
Updated benchmarking standardization work plan (Q10/11 Rapporteur group meeting, Sophia-Antipolis, 21-24 March 2016)
�
� |
Rapporteur Q10/11
� |
Q10/11
� |
2016-03-24 |
|
[ 40-WP4 ]
�
� |
Consent - draft new Recommendation ITU-T Q.3932.4 "IMS/NGN performance benchmark - Part 4: Testing of the performance design objectives"
�
� |
Editor
� |
Q10/11
� |
2016-03-22 |
|
[ 39-WP4 ]
�
� |
A.5 justification information for draft new Q.3932.4
�
� |
Editor
� |
Q10/11
� |
2016-03-22 |
|
[ 38-WP4 ]
�
� |
A.5 justification information for draft new Q.4015.2 v.1_SI_Interw_TSS&TP
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 37-WP4 ]
�
� |
A.5 justification information for draft new Q.4015.1 v.1_SI_Interw_PICS
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 36-WP4 ]
�
� |
Revised conformance testing standardization work plan for SIP IMS
�
� |
Rapporteur Q11/11
� |
Q2/11, Q11/11
� |
2016-03-22 |
|
[ 35-WP4 ]
�
� |
Output - Draft revised Recommendation ITU-T Q.1912.5D "Interworking between session initiation protocol (SIP) and bearer independent call control protocol (BICC) or ISDN user part (ISUP): Test suite structure and test purposes (TSS&TP) for profile C"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 34-WP4 ]
�
(Rev.1)� |
Output - Draft Recommendation ITU-T Q.4016 v.1_FAX_req and tests "SIP signalling between the IP Multimedia Subsystem (IMS) and SIP enabled devices for real-time fax over IP"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 33-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4012.3 v.1_SI_ACR_User_TS_Part3 "Anonymous Communication Rejection (ACR) and Communication Barring (CB) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP), user side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 32-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4012.2 v.1_SI_ACR_Net_TS_Part2 "Anonymous Communication Rejection (ACR) and Communication Barring (CB) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP), network side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 31-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4012.1 v.1_SI_ACR_Net_TS_Part1 "Anonymous Communication Rejection (ACR) and Communication Barring (CB) using IP Multimedia (IM) Core Network (CN) subsystem 3GPP Release 10; Conformance Testing Specification Part 1: Protocol Implementation Conformance Statement (PICS)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 30-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4011.3 v.1_SI_CUG_User_TS_Part3 "Closed User Group (CUG) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 3: Test Suite Structure and Test Purposes (TSS&TP), user side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 29-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4011.2 v.1_SI_CUG_Net_TS_Part2 "Closed User Group (CUG) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP), network side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 28-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4011.1 v.1_SI_CUG_Net_TS_Part1 "Closed User Group (CUG) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 1: Protocol Implementation Conformance Statement (PICS)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 27-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4009.2 v.1_SI_CCNR_Net_TS_Part2 "Completion of Communications to Busy Subscriber (CCBS) and Completion of Communications by No Reply (CCNR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 26-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4009.1 v.1_SI_CCNR_Net_TS_Part1 "Completion of Communications to Busy Subscriber (CCBS) and Completion of Communications by No Reply (CCNR) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 1: Protocol Implementation Conformance Statement (PICS)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 25-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4010.3 v.1_SI_MWI_Net_TS_Part3 "Message Waiting Indication (MWI) using IP Multimedia (IM) Core Network (CN) subsystem; Part 3: Test Suite Structure and Test Purposes (TSS&TP), user side
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 24-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4010.2 v.1_SI_MWI_Net_TS_Part2 "Message Waiting Indication (MWI) using IP Multimedia (IM) Core Network (CN) subsystem; Part 2: Test Suite Structure and Test Purposes (TSS&TP), network side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 23-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4010.1 v.1_SI_MWI_Net_TS_Part1 "Message Waiting Indication (MWI) using IP Multimedia (IM) Core Network (CN) subsystem; Part 1: Protocol Implementation Conformance Statement (PICS)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 22-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4008.3 v.1_SI_MCID_User TS_Part3 "Malicious Communication Identification (MCID) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 3: Test Suite Structure and Test Purposes (TSS&TP), user side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 21-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4008.2 v.1_SI_MCID_Net_TS_Part2 "Malicious Communication Identification (MCID) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 2: Test Suite Structure and Test Purposes (TSS&TP), network side"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 20-WP4 ]
�
� |
Output - Draft new Recommendation ITU-T Q.4008.1 v.1_SI_MCID_Net_User_TS_Part1 "Malicious Communication Identification (MCID) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance Test Specification; Part 1: Protocol Implementation Conformance Statement (PICS)"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 19-WP4 ]
�
� |
Consent - Draft new Recommendation ITU-T Q.4015.2 v.1_SI_Interw_TSS&TP "Interworking between the IP Multimedia core network subsystem and circuit switched networks; Conformance testing; Part 2: TSS&TP"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 18-WP4 ]
�
� |
Consent - Draft new Recommendation ITU-T Q.4015.1 v.1_SI_Interw_PICS "Interworking between the IP Multimedia core network subsystem and circuit switched networks; Conformance Testing; Part 1: PICS"
�
� |
Editor
� |
Q11/11
� |
2016-03-22 |
|
[ 17-WP4 ]
�
� |
LS/i/r on first meeting of ITU-T CASC and request to update the living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply to SG11-LS102) [from ITU-T SG3]
�
� |
ITU-T SG3
� |
Q11/11
� |
2016-03-21 |
|
[ 16-WP4 ]
�
� |
LS/i on new work item "A regulation framework of delivering of ICT services with the guaranteed QoS and requested bit rate on the fixed and mobile data networks" [from ITU-T SG3]
�
� |
ITU-T SG3
� |
Q15/11
� |
2016-03-21 |
|
[ 15-WP4 ]
�
� |
LS/i/r on updated living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (COM11 - LS 87) [from ITU-T Q13/16]
�
� |
ITU-T Q13/16
� |
Q11/11
� |
2016-03-18 |
|
[ 14-WP4 ]
�
� |
LS/i on Conformance and Interoperability Testing (CIT) activities for ITU-T WP1/15 Recommendations [from ITU-T SG15]
�
� |
ITU-T SG15
� |
Q11/11
� |
2016-03-07 |
|
[ 13-WP4 ]
�
� |
LS/i/r on CASC and request to update the living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (replies to SG11-LS088, SG11-LS102) [from ITU-T SG15]
�
� |
ITU-T SG15
� |
Q11/11, CASC
� |
2016-03-07 |
|
[ 12-WP4 ]
�
� |
LS/i on consent of new Recommendation ITU-T G.1028 [from ITU-T SG12]
�
� |
ITU-T SG12
� |
Q2/11
� |
2016-03-03 |
|
[ 11-WP4 ]
�
� |
LS/i/r to ITU-T SG11 on "QoS-related work in ITU-T SG11" (reply to SG11-LS 105) [from ITU-T SG12]
�
� |
ITU-T SG12
� |
Q15/11
� |
2016-03-03 |
|
[ 10-WP4 ]
�
� |
LS/i/r on first meeting of ITU-T CASC and request to update the living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply to COM 11 - LS 102, TD 807(GEN/9)) [from ITU-T SG9]
�
� |
ITU-T SG9
� |
Q11/11, CASC
� |
2016-03-03 |
|
[ 9-WP4 ]
�
� |
LS/i/r on first meeting of ITU-T CASC and request to update the living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply to SG11 - LS 102) [from ITU-T SG20]
�
� |
ITU-T SG20
� |
Q11/11
� |
2016-03-03 |
|
[ 8-WP4 ]
�
� |
LS/i/r on SG11 structure and the new SG20 (reply to SG11 - LS 92 -E) [from ITU-T SG20]
�
� |
ITU-T SG20
� |
QALL/11
� |
2016-03-03 |
|
[ 7-WP4 ]
�
� |
LS/i on the revision of Supplement 2 of Recommendation E.164 (Number Portability) [from ITU-T SG2]
�
� |
ITU-T SG2
� |
Q11/11
� |
2016-03-03 |
|
[ 6-WP4 ]
�
� |
LS/i on consent of Draft Recommendation ITU-T X.784 (ex, X.snmp-ics) [from ITU-T SG2]
�
� |
ITU-T SG2
� |
Q11/11
� |
2016-03-03 |
|
[ 5-WP4 ]
�
� |
LS/i on Reply to LS on "Agreement on collaboration between ETSI TC INT and ITU-T SG11 [from ETSI TC INT]
�
� |
ETSI TC INT
� |
QALL/11
� |
2016-03-03 |
|
[ 4-WP4 ]
�
� |
LS/i on IETF IPPM WG reply to Liaison 1444 / ITU-T SG12 reply to SG11 on relevant activities on Internet Speed Measurements [from IETF IPPM WG]
�
� |
IETF IPPM WG
� |
Q15/11
� |
2016-03-03 |
|
[ 3-WP4 ]
�
� |
LS/i on WTSA-16 preparations [from TSAG]
�
� |
TSAG
� |
QALL/11
� |
2016-03-03 |
|
[ 2-WP4 ]
�
(Rev.1)� |
Draft meeting plan (time schedule), Sophia Antipolis, 21-24 March 2016
�
� |
TSB
� |
QALL/11
� |
2016-03-03 |
|
[ 1-WP4 ]
�
� |
Draft Agenda: WP4/11, Sophia Antipolis, 24 March 2016
�
� |
TSB
� |
Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11
� |
2016-03-03 |
Results:47 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):