Cartas Colectivas�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 8 ]
�
+Corr.1 +Add.1� |
Reuni�n de la Comisi�n de Estudio 15, Ginebra, 5-16 de diciembre de 2011
�
This corrigendum applies to the English version only
� |
SG 15
� |
� |
2011-10-05 |
� � |
Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 1938 ]
�
� |
G.fast: Multi-layer TCAM
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-11-24 |
|
[ 1937 ]
�
� |
Mapping of G.798 atomic functions to G.874.1 object classes
�
� |
Deutsche Telekom AG
� |
Q14/15
� |
2011-11-23 |
|
[ 1936 ]
�
� |
G.hnem: Proposal for subcarrier spacing of coexistence preamble symbols
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2011-11-23 |
|
[ 1935 ]
�
� |
G.vector: Editorial fix in G.993.5 Figure 7-4 and 7-5.
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-11-23 |
|
[ 1934 ]
�
� |
G.gen: G.vdsl: G.vector: VDSL2 Dynamic Virtual Noise
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-11-23 |
Documentos presentados : 5 de un total de 420� relacionaron a este reuni�n (vea m�s...)
� � |
Documentos Temporales�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 310-GEN ]
�
� |
oLS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
�
� |
ITU-T Study Group 15
� |
QALL/15
� |
2011-12-15 |
|
[ 309-GEN ]
�
� |
iLS: LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations
�
� |
ITU-T SG16
� |
QALL/15
� |
2011-12-12 |
|
[ 308-GEN ]
�
� |
iLS: Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)
�
� |
ITU-T SG16
� |
QALL/15
� |
2011-12-12 |
|
[ 307-GEN ]
�
� |
Report of IEC SC86B meeting Melbourne, 27-29 October 2011
�
� |
Liaison Rapporteur to IEC SC86B
� |
Q7/15
� |
2011-12-12 |
|
[ 306-GEN ]
�
� |
iLS: Communication to ITU-T Q6/15 and Q12/15 from IETF's CCAMP Working Group on Flexible Grids
�
� |
IETF CCAMP
� |
Q6/15, Q12/15
� |
2011-12-08 |
Documentos presentados : 5 de un total de 609� relacionaron a este reuni�n (vea m�s...)
� � |
Informe�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 30 ]
�
� |
Report of Working Party 3/15, Transport network structures (Geneva meeting, 5-16 December 2011)
�
� |
SG 15
� |
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
� |
2012-02-06 |
|
[ 29 ]
�
� |
Report of Working Party 2/15, Optical access/transport network technologies and physical infrastructures (Geneva meeting, 5-16 December 2011)
�
� |
SG 15
� |
Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15
� |
2012-02-06 |
|
[ 28 ]
�
� |
Report of Working Party 1/15, Transport aspects of access networks and home networking (Geneva meeting, 5-16 December 2011)
�
� |
SG 15
� |
Q4/15, Q2/15, Q1/15
� |
2012-02-06 |
|
[ 27 ]
�
� |
Report of the sixth meeting of Study Group 15, Optical transport networks and access network infrastructures (Geneva, 5-16 December 2011)
�
� |
SG 15
� |
QALL/15
� |
2012-01-31 |
� � |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):