International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 13 : Meeting�2009-09-02�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 13� TD-PLEN�(2009-09-02)�

ITU-T�SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting� from 2009-09-02 to 2009-09-12

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-042012-02-172012-02-062011-10-102011-05-202011-01-172010-09-162010-04-192010-01-29� [ 2009-09-02 ]� 2009-05-222009-01-12

Results:42 total items.
Temporary Documents �(PLEN) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 85-PLEN ]
Output draft of Draft Recommendation Y.2221 (Y.USN-reqts), "Requirements for support of Ubiquitous Sensor Network (USN) applications and services in the NGN environment" - for consent � Editor Q3/13 2009-09-18
[ 84-PLEN ]
(Rev.1)
REPORT OF WORKING PARTY 2/13 (Service requirements, scenarios and evolution aspects) � Chairman WP 2/13 Q2/13, Q18/13, Q14/13, Q13/13, Q12/13 2009-09-18
[ 83-PLEN ]
Draft Recommendation ITU-T Y.2236 (Y.ngn-mcastsf) - for approval � Editor Q3/13 2009-09-18
[ 82-PLEN ]
WP 2/13 approved liaisons � WP 2/13 Co-chair QALL/13 2009-09-18
[ 81-PLEN ]
Application of IMT and IMS in mobile networks in developing countries � Rapporteur Q15/13 2009-09-18
[ 80-PLEN ]
Contact person for Multimedia communications standards � Chairman of SG13 QALL/13 2009-09-18
[ 79-PLEN ]
SG 13 Focal Points on ICT and Climate Change � SG13 Chairman QALL/13 2009-09-18
[ 78-PLEN ]
Modification of Q16/13 description � Chairman of SG13 Q16/13 2009-09-18
[ 77-PLEN ]
SG13 Contact person to JCA-Mgt � Chairman of SG13 QALL/13 2009-09-18
[ 76-PLEN ]
SG13 Contact person to JCA on ICT and Climate Change � Chairman of SG13 QALL/13 2009-09-18
[ 75-PLEN ]
Response on LS entitled "High-quality, testable Recommendations and test specifications" � Chairman of SG13 QALL/13 2009-09-18
[ 74-PLEN ]
(Rev.1)
REPORT OF WORKING PARTY 5/13 (Future Networks) � WP 5/13 Chairman Q7/13, Q21/13, Q20/13, Q19/13 2009-09-17
[ 73-PLEN ]
Initial version of climate change roadmap (CC-roadmap) � WP1 Chairman and Q.1/13 Rapporteur QALL/13 2009-09-17
[ 72-PLEN ]
Draft Recommendation Y.2237 (Y.cmoip) - Functional model, service scenarios and use cases for QoS enabled mobile VoIP service - for consent � Editor Q14/13 2009-09-17
[ 71-PLEN ]
WP 1/13 Report � WP1 Co-Chairs Q2/13, Q15/13, Q10/13, Q1/13 2009-09-17
[ 70-PLEN ]
WP3/13 meeting report � WP3/13 chairman QALL/13 2009-09-17
[ 69-PLEN ]
List of outgoing liaison statement from WP5/SG 13 (2-12 September 2009) � Chairman SG 13 QALL/13 2009-09-17
[ 68-PLEN ]
WP 3/13 approved liaisons � WP 3/13 chairman Q5/13 2009-09-17
[ 67-PLEN ]
Liaisons, prepared to WP1/13 for approval � WP1/ 13 Co-chair Q2/13, Q15/13, Q10/13, Q1/13 2009-09-17
[ 66-PLEN ]
Recommendation ITU-T Y. 2017 (Multicast functions in Next Generation Networks) � Acting editor Q5/13 2009-09-17
[ 65-PLEN ]
Draft Recommendation Y.2002 (Y.NGN-UbiNet), Overview of ubiquitous networking and of its support in NGN - for consent � Editors Q5/13 2009-09-17
[ 64-PLEN ]
Report of the Meeting of WP 4/13 (QoS and Security) � Chairman of WP 4/13 Q4/13, Q17/13, Q16/13 2009-09-17
[ 63-PLEN ]
Recommendation ITU-T Y.2018 (Y.MMCF) - Mobility management and control framework and architecture within the NGN transport stratum � Editor Q5/13 2009-09-17
[ 62-PLEN ]
Draft new Recommendation Q.1741.6 - for consent � Editor Q10/13 2009-09-17
[ 61-PLEN ]
Liaison statements from WP 4/13 � Acting WP Chairman Q17/13, Q16/13 2009-09-17
[ 60-PLEN ]
Update to the description of Q.16/13 � Rapporteur Q16/13 2009-09-17
[ 59-PLEN ]
NGN Capability Set 2 (Y.2007, exY.NGN-Cap2) for consent � Editor Q1/13 2009-09-17
[ 58-PLEN ]
(Rev.1)
Y.2704 (Y.secMechanism) - NGN security mechanisms and procedures - For determination � Editors Q16/13 2009-09-17
[ 57-PLEN ]
(Rev.2)
Provisional list of participants � TSB QALL/13 2009-09-03
[ 56-PLEN ]
Allocation of documents � TSB Q.ALL/13 2009-09-02
[ 55-PLEN ]
Meeting facilities and information � TSB ALL/13 2009-09-02
[ 54-PLEN ]
Summary results of action taken at and since the 12-23 January 2009 SG 13 meeting � TSB QALL/13 2009-08-28
[ 53-PLEN ]
List of Contributions � TSB QALL/13 2009-08-28
[ 52-PLEN ]
TSAG highlights related to SG13 � Chairman, Study Group 13 QALL/13 2009-08-28
[ 51-PLEN ]
Climate Change study and SG 13 � SG 13 Chairman QALL/13 2009-08-28
[ 50-PLEN ]
Draft workplan for Study Group 13 meeting (2-12 September 2009) � TSB QALL/13 2009-08-26
[ 49-PLEN ]
Report on GSC-14 (Global Standards Collaboration Meeting) meeting in Geneva at ITU, 13 - 16 July 2009 � TSB QALL/13 2009-08-21
[ 48-PLEN ]
Results of the consultation on approving draft revised Recommendation Y.2201 � TSB QALL/13 2009-08-17
[ 47-PLEN ]
(Rev.1)
Draft agenda for the plenary meetings of Study Group 13, Mar del Plata, 2-12 September 2009 � Chairman, SG 13 QALL/13 2009-07-24
[ 46-PLEN ]
Implementation of WTSA-08 Resolution 76: instructions to the ITU-T Study Groups, kind reminder � TSB Director QALL/13 2009-06-15
[ 45-PLEN ]
Updates on Electronic Working Methods Services and database applications � TSAG Chairman QALL/13 2009-06-09
[ 44-PLEN ]
Continuation of ITU-T's work on ICTs/Environment and Climate Change � TSAG Chairman QALL/13 2009-06-09
Results:42 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4