Documentos Temporales
�(WP3)
�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 34-WP3 ]
�
� |
QSDG Overview
�
� |
Chairman QSDG
� |
Q12/12
� |
2009-03-17 |
|
[ 33-WP3 ]
�
� |
CFP for G.OMVAS
�
� |
Rapporteurs Q13/12
� |
Q13/12
� |
2009-03-17 |
|
[ 32-WP3 ]
�
� |
Proposed new work item on a New Recommendation ?Perceptual guidelines for voiceband switching in heterogeneous mobile networks?
�
� |
Rapporteur Q11/12
� |
Q11/12
� |
2009-03-16 |
|
[ 31-WP3 ]
�
� |
Incoming LS: Performance design objectives for the IMS architecture
�
� |
ETSI TC INT
� |
Q11/12
� |
2009-03-13 |
|
[ 30-WP3 ]
�
� |
Proposed Y.1540 Appendix VIII: IP-layer capacity framework
�
� |
Editor
� |
Q17/12
� |
2009-03-12 |
|
[ 29-WP3 ]
�
� |
Related work on Interconnection Quality Parameters
�
� |
Co-Rapporteur Q11/12
� |
Q11/12
� |
2009-03-11 |
|
[ 28-WP3 ]
�
� |
Packet/Frame Performance Objectives: Review and Proposals
�
� |
Rapporteur Q17/12
� |
Q17/12
� |
2009-03-11 |
|
[ 27-WP3 ]
�
(Rev.1-3)� |
Report of Q17 Meeting and Status
�
� |
Rapporteur Q17/12
� |
Q17/12
� |
2009-03-11 |
|
[ 26-WP3 ]
�
(Rev.1)� |
Status report of Q.12/12 "Operational aspects of telecommunication network service quality"
�
� |
Acting Rapporteur Q12/12
� |
Q12/12
� |
2009-03-09 |
|
[ 25-WP3 ]
�
(Rev.1-2)� |
Status report of Q.11/12 "Performance interworking and traffic management for Next Generation Networks"
�
� |
Acting Rapporteur Q11/12
� |
Q11/12
� |
2009-03-09 |
|
[ 24-WP3 ]
�
(Rev.1)� |
Status report of Q.2/12 "Multimedia performance considerations for IP gateways"
�
� |
Acting Rapporteur Q2/12
� |
Q2/12
� |
2009-03-09 |
|
[ 23-WP3 ]
�
� |
Incoming LS: Liaison to ITU-T Q17/12, Q10/15 from the MEF Delivered throughput project
�
� |
MEF
� |
Q17/12
� |
2009-03-09 |
|
[ 22-WP3 ]
�
(Rev.1-2)� |
Status report of Question 13/12
�
� |
Co-Rapporteurs of Q13/12
� |
Q13/12
� |
2009-03-05 |
|
[ 21-WP3 ]
�
� |
Incoming LS: ATIS standards on QoS metrics and on IPTV linear TV service
�
� |
ATIS
� |
Q12/12, Q13/12
� |
2009-03-02 |
|
[ 20-WP3 ]
�
� |
Incoming LS: LS to ITU-T SG2 on collaboration on IPTV requirements
�
� |
ITU-T SG 16
� |
Q13/12
� |
2009-02-17 |
|
[ 19-WP3 ]
�
� |
Incoming LS: LS on the completion of the 1st version of home network QoS analysis
�
� |
ITU-T SG 16
� |
Q13/12
� |
2009-02-17 |
|
[ 18-WP3 ]
�
� |
Draft text of G.RQAM
�
� |
Acting Editor G.RQAM
� |
Q15/12, Q14/12, Q9/12, Q8/12, Q7/12, Q13/12
� |
2009-02-13 |
|
[ 17-WP3 ]
�
� |
Incoming LS: Request for Consideration of Contribution T09-SG13-C-0011
�
� |
ITU-T SG13
� |
Q17/12
� |
2009-02-13 |
|
[ 16-WP3 ]
�
� |
Incoming LS: Draft Recommendation Y.FAinX, "Requirements for Flow Aggregate Information Exchange in NGN"
�
� |
ITU-T SG13
� |
Q17/12, Q11/12
� |
2009-02-13 |
|
[ 15-WP3 ]
�
� |
Incoming LS: Information about newly approved ITU-T Recommendation Y.1901 (ex - Y.iptv-req)
�
� |
ITU-T SG13
� |
Q13/12
� |
2009-02-13 |
|
[ 14-WP3 ]
�
� |
Incoming LS: LS to IPTV related Study Groups on NGN capability set 2
�
� |
ITU-T SG13
� |
Q13/12, Q11/12
� |
2009-02-13 |
|
[ 13-WP3 ]
�
� |
Incoming LS: Establishment of Focus Group on Future Networks (FG-FN)
�
� |
Chairman of SG13
� |
Q17/12, Q13/12, Q11/12
� |
2009-02-13 |
|
[ 12-WP3 ]
�
� |
Report of Question 17 Interim Meeting and Status
�
� |
Rapporteur Q17/12
� |
Q17/12
� |
2009-02-09 |
|
[ 11-WP3 ]
�
� |
Incoming LS: Objectives for Quality related Parameters at VoIP Interconnection Points
�
� |
ITU-T Study Group 11
� |
Q17/12
� |
2009-02-03 |
|
[ 10-WP3 ]
�
� |
Incoming LS: Performance design objectives for the PSTN/ISDN emulation architecture
�
� |
ITU-T Study Group 11
� |
Q13/12, Q11/12
� |
2009-02-03 |
|
[ 9-WP3 ]
�
� |
Incoming LS: Response to liaison from Q17/12 (TD-329 (WP1/15))
�
� |
ITU-T SG15
� |
Q17/12
� |
2009-01-22 |
|
[ 8-WP3 ]
�
� |
Draft Recommendation E.841 (formerly E.IPQoS)
�
� |
Editor, E.841
� |
Q12/12
� |
2008-12-16 |
|
[ 7-WP3 ]
�
� |
Report of Q.13/12 interim meeting in Tokyo (Nov. 11-12, 2008)
�
� |
Co-Rapporteurs Q13/12
� |
Q13/12
� |
2008-12-16 |
|
[ 6-WP3 ]
�
� |
Report of the 25th QSDG meeting, Vienna, Austria, 13-16 May 2008
�
� |
Chairman QSDG
� |
Q12/12
� |
2008-12-16 |
|
[ 5-WP3 ]
�
� |
Incoming LS: Liaison statement on "Performance and availability requirements
and objectives for wireless access systems"
�
� |
ITU-R WP5A
� |
Q11/12, Q17/12
� |
2008-12-16 |
|
[ 4-WP3 ]
�
� |
Incoming LS: Response to LS on requirements for flow aggregate information exchange
�
� |
Q4/12 Rapporteur Group
� |
Q17/12
� |
2008-12-16 |
|
[ 3-WP3 ]
�
� |
Incoming LS: Draft Recommendation E.841 (formerly E.IPQoS)
�
� |
ITU-T SG2
� |
Q17/12, Q12/12, Q11/12
� |
2008-12-16 |
|
[ 2-WP3 ]
�
� |
Incoming LS: LS on Home Network QoS Analysis
�
� |
ITU-T Q24/16
� |
Q13/12
� |
2008-12-16 |
|
[ 1-WP3 ]
�
� |
Draft agenda for Working Party 3/12 meeting
�
� |
Chairman of Working Party 3/12
� |
Q17/12, Q13/12, Q12/12, Q11/12, Q2/12
� |
2008-12-16 |
Resultados :34 documentos
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):