International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 3 : Meeting�2012-09-03�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 3� TD-PLEN�(2012-09-03)�

ITU-T�SG 3

Tariff and accounting principles including related telecommunication economic and policy issues

Study Period 2009

Meeting� from 2012-09-03 to 2012-09-07

held in Switzerland [Geneva]

Other Meetings : [ 2012-09-03 ]� 2012-01-162011-03-282010-05-172009-09-212009-01-19

Results:42 total items.
Temporary Documents �(PLEN) ��Documents / Contributions

Number
Title Source AI/Question
Date
[ 270-PLEN ]
oLS - Smart Grid related issues (representative and deliverables) � Chairman QALL/3 2012-09-10
[ 269-PLEN ]
(Rev.1-2)
Proposals for the terms of reference of the Rapporteur's Group for a new Supplement to Recommendation D.50 and other outputs if necessary � Chairman, WP 1/3 Q1/3 2012-09-06
[ 268-PLEN ]
(Rev.1)
Revision of D.195 � Editor, ad hoc group Q2/3 2012-09-04
[ 267-PLEN ]
iLS - Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery � Chairman, FG-DR&NRR QALL/3 2012-07-02
[ 266-PLEN ]
oLS - NGN studies � Rapporteur, NGN Q1/3 2012-05-25
[ 265-PLEN ]
Alternative calling procedures: background and trends � TSB QALL/3 2012-05-25
[ 264-PLEN ]
Summary of the ITU Workshop on origin identification and alternative calling procedures, Geneva, 19-20 March 2012 � TSB QALL/3 2012-05-25
[ 263-PLEN ]
iLS - Reply LS to JCA-CIT on draft document on Conformance and Interoperability Testing needs � ITU-T SG9 QALL/3 2012-05-24
[ 262-PLEN ]
iLS - Telecommunication Management and OAM Project Plan � ITU-T SG2 QALL/3 2012-05-24
[ 261-PLEN ]
iLS - Reply to Ref: COM 15 - LS 371 regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs � JCA-CIT QALL/3 2012-05-24
[ 260-PLEN ]
iLS - Reply to Ref: COM 16 - LS 281 regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs � JCA-CIT QALL/3 2012-05-24
[ 259-PLEN ]
iLS - Reply to Ref: COM 16 - LS 264 regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs � JCA-CIT QALL/3 2012-05-24
[ 258-PLEN ]
iLS - Reply to Ref: COM 9 - LS 128 regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs � JCA-CIT QALL/3 2012-05-24
[ 257-PLEN ]
iLS - Reply to Ref: COM 11 - LS 75 regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs � JCA-CIT QALL/3 2012-05-24
[ 256-PLEN ]
iLS - Smart Grid related issues (representative and deliverables) � Conveners, JCA SG&HN QALL/3 2012-05-21
[ 255-PLEN ]
iLS - Support and harmonization of International Mobile Telecommunications (IMT) activities � ITU-R SG5 QALL/3 2012-05-21
[ 254-PLEN ]
iLS - SG2 work on conformance and interoperability (Response to JCA-CIT on JCA-CIT-LS6) � ITU-T SG2 QALL/3 2012-05-21
[ 253-PLEN ]
iLS - Update on Numbering Misuse � ITU-T SG2 Q3/3, Q2/3 2012-05-21
[ 252-PLEN ]
(Rev.1)
Proposed text of Questions for the 2013-2016 study period � Chairman QALL/3 2012-07-02
[ 251-PLEN ]
Report of SG3RG-AO meeting held in Bali, 29-30 May 2012 � Chairman, SG3RG-AO Q4/3 2012-07-13
[ 250-PLEN ]
Report of the 2012 SG3RG-AFR meeting � N/A � 2012-04-27
[ 249-PLEN ]
Report of SG3RG-LAC meeting held in Asunci�n, Paraguay, 15-16 March 2012 � Chairman, SG3RG-LAC Q4/3 2012-07-09
[ 248-PLEN ]
Report of the 20-22 June 2012 meeting of CWG-WCIT12 � Chairman, CWG-WCIT12 QALL/3 2012-07-13
[ 247-PLEN ]
Council-12 highlights (not available yet) � TSB QALL/3 2012-08-27
[ 246-PLEN ]
TSAG highlights (2-4 July 2012) � TSB QALL/3 2012-08-27
[ 245-PLEN ]
(Rev.1)
Results of consultation with members (TSB circular 288) � N/A � 2012-04-27
[ 244-PLEN ]
Electronic working methods (EWM): Recent updates to the wireless LAN facilities, e-printing and list of documents � TSB QALL/3 2012-07-09
[ 243-PLEN ]
(Rev.1)
Draft report for ad hoc group on developing country issues � Chairman QALL/3 2012-09-06
[ 242-PLEN ]
Agenda for the ad hoc Group on Developing Country Issues � Chairman QALL/3 2012-09-02
[ 241-PLEN ]
UNUSED NUMBER � N/A � 2012-04-27
[ 240-PLEN ]
UNUSED NUMBER � N/A � 2012-04-27
[ 239-PLEN ]
(Rev.1-2)
Draft WP 3/3 report � TSB Q3/3 2012-08-27
[ 238-PLEN ]
(Rev.1-4)
Draft WP 2/3 report � TSB Q2/3 2012-08-27
[ 237-PLEN ]
(Rev.1-4)
Draft WP 1/3 report � TSB Q1/3 2012-08-27
[ 236-PLEN ]
(Rev.1-4)
Draft SG3 report � Chairman, SG3 QALL/3 2012-08-27
[ 235-PLEN ]
Agenda for WP 3/3 � TSB Q3/3 2012-08-27
[ 234-PLEN ]
(Rev.1)
Agenda for WP 2/3 � TSB Q2/3 2012-08-27
[ 233-PLEN ]
(Rev.1)
Agenda for WP 1/3 � TSB Q1/3 2012-08-27
[ 232-PLEN ]
(Rev.1)
List of participants � TSB QALL/2 2012-08-30
[ 231-PLEN ]
List of incoming liaison statements � TSB QALL/3 2012-08-27
[ 230-PLEN ]
Timetable and room allocation � TSB QALL/3 2012-08-30
[ 229-PLEN ]
Draft agenda � TSB QALL/3 2012-08-27
Results:42 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-10