Lettres Collectives�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 5 ]
�
+Corr.1� |
R�union de la Commission d'�tudes 15, Gen�ve, 11-22 f�vrier 2008
�
Corrigendum 1 concerns the English version only.
� |
SG 15
� |
� |
2007-12-10 |
� � |
Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 913 ]
�
� |
Some concerns about and proposals for the future direction of ASON
�
� |
NTT
� |
Q14/15, Q12/15
� |
2008-02-06 |
|
[ 912 ]
�
� |
Proposal to start discussion on power consumption and its reduction in optical transmission systems
�
� |
NTT
� |
Q7/15, Q6/15
� |
2008-02-06 |
|
[ 911 ]
�
� |
Non-revertive recovery mechanism in G.8032
�
� |
ETRI
� |
Q9/15
� |
2008-02-06 |
|
[ 910 ]
�
� |
Requirements on OTN enhancements
�
� |
Deutsche Telekom
� |
Q11/15
� |
2008-02-03 |
|
[ 909 ]
�
� |
Requirements on Mapping of 40GBase and 100GBase into ODUs
�
� |
Deutsche Telekom
� |
Q11/15
� |
2008-02-03 |
Documents affich�s : 5 sur un total de 289� relatifs � cette r�union (en voir plus...)
� � |
Documents Temporaires�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 304-GEN ]
�
� |
Advance programme for "Innovations in NGN" ITU-T Kaleidoscope academic conference (Geneva, 12-13 May 2008)
�
� |
TSB
� |
QALL/15
� |
2008-02-21 |
|
[ 303-GEN ]
�
� |
Recent activities in the OIF Network Working Groups
�
� |
SG15 representative to OIF Network Working Groups
� |
Q14/15, Q12/15
� |
2008-02-21 |
|
[ 302-GEN ]
�
� |
SG15 "Energy Saving Tutorials" Meeting Report
�
� |
Rapporteur Q2/15
� |
Q2/15
� |
2008-02-20 |
|
[ 301-GEN ]
�
� |
SG 15 "Power Saving Tutorials": Proposed material for a press release
�
� |
Rapporteur Q2/15
� |
Q2/15
� |
2008-02-20 |
|
[ 300-GEN ]
�
� |
Draft agenda for the second joint Question sessions on Optical Transport Networks (OTN) Coordination
�
� |
Q3/15 Rapporteur
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q7/15, Q6/15, Q3/15
� |
2008-02-18 |
Documents affich�s : 5 sur un total de 387� relatifs � cette r�union (en voir plus...)
� � |
Rapports�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 25 ]
�
� |
Report of the sixth meeting of Working Party 3/15, OTN structure (2005-2008), (Geneva, 11-22 February 2008), General
�
� |
SG 15
� |
Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
� |
2008-05-01 |
|
[ 24 ]
�
� |
Report of the sixth meeting of Working Party 2/15, OTN technology, (Geneva, 11-22 February 2008), General
�
� |
SG 15
� |
Q10/15, Q8/15, Q7/15, Q6/15, Q5/15
� |
2008-05-01 |
|
[ 23 ]
�
� |
Report of the sixth meeting of Working Party 1/15, Optical and metallic access network (2005-2008), (Geneva,11-22 February 2008), GENERAL
�
� |
SG 15
� |
Q4/15, Q2/15, Q1/15
� |
2008-05-01 |
|
[ 22 ]
�
� |
Report of the sixth meeting of Study Group 15, Optical and Other Transport Networks (2005-2008), (Geneva, 11 - 22 February 2008), GENERAL
�
� |
SG 15
� |
Q1-14/15
� |
2008-05-01 |
� � |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):