Contributions Tardives�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 673 ]
�
� |
G.adsl, G.vdsl: Text for Termination impedance model of ADSL or VDSL2
�
� |
LEA
� |
Q4/15
� |
2006-01-30 |
|
[ 672 ]
�
� |
G.vdsl: Defining impedance models for VDSL for testing and designing splitters
�
� |
LEA
,
Alcatel
� |
Q4/15
� |
2006-01-30 |
|
[ 671 ]
�
� |
G.adsl, G.vdsl, G.test: Limiting the input capacitance of DSL transceivers over ISDN
�
� |
LEA
,
Alcatel
� |
Q4/15
� |
2006-01-30 |
|
[ 670 ]
�
� |
G.adsl, G.vdsl, G.test: Limiting input capacitance of DSL transceivers over POTS
�
� |
LEA
,
Alcatel
� |
Q4/15
� |
2006-01-30 |
|
[ 669 ]
�
� |
G.adsl, G.vdsl, Input capacitance of xDSL should have upper and lower bounds
�
� |
LEA
� |
Q4/15
� |
2006-01-30 |
|
[ 668 ]
�
� |
G.vdsl: 5 liaisons to SG Q4/15 and 5 papers not handled under VDSL in Munich
�
� |
LEA on behalf of the chair of ETSI AT-A
� |
Q4/15
� |
2006-01-30 |
|
[ 667 ]
�
� |
Proposed text for EoM mapping description in G.8012
�
� |
Alcatel
� |
Q11/15
� |
2006-01-27 |
|
[ 666 ]
�
� |
Proposal for Standardization of Ethernet transport networks
�
� |
Huawei
� |
Q12/15
� |
2006-01-27 |
|
[ 665 ]
�
� |
Proposal for Automatic Discovery Synchronization and Update in ASON
�
� |
China United Telecomms
� |
Q14/15
� |
2006-01-27 |
|
[ 664 ]
�
� |
Proposal for Multiple Control Channels in ASON
�
� |
China United Telecomms
� |
Q14/15
� |
2006-01-27 |
|
[ 663 ]
�
� |
Best practice of cable link test in China
�
� |
MII China
� |
Q5/15
� |
2006-01-27 |
|
[ 662 ]
�
� |
To put the formula of nominal central frequencies into G. Suppl 39
�
� |
MII China
� |
Q6/15
� |
2006-01-27 |
|
[ 661 ]
�
� |
Proposal for the introduction of Control Network Element Object in G.7718
�
� |
MII China
� |
Q14/15
� |
2006-01-27 |
|
[ 660 ]
�
� |
Proposals on the Usage of the Different Discovery Mechanisms
�
� |
MII China
� |
Q14/15
� |
2006-01-27 |
|
[ 659 ]
�
� |
Proposals for the interactions between the control plane components in G.8080
�
� |
MII China
� |
Q12/15
� |
2006-01-27 |
|
[ 658 ]
�
� |
Proposal of new drafts for survivability of ASON network
�
� |
MII China
� |
Q9/15
� |
2006-01-27 |
|
[ 657 ]
�
� |
Proposal For the Interface of Connection Controller Component in G.8080
�
� |
MII China
� |
Q12/15
� |
2006-01-27 |
|
[ 656 ]
�
� |
The response of call to a failure of connection
�
� |
MII China
� |
Q14/15
� |
2006-01-27 |
|
[ 655 ]
�
� |
Addition of three more sub-type EVPL services to G.8011.2
�
� |
China Telecom
� |
Q11/15
� |
2006-01-27 |
|
[ 654 ]
�
� |
Proposed modification of label allocation rules to G.7713.2
�
� |
China Telecom
� |
Q14/15
� |
2006-01-27 |
|
[ 653 ]
�
� |
Discussion of SPC activation/deactivation functions
�
� |
CMCC
,
Huawei
� |
Q14/15
� |
2006-01-27 |
|
[ 652 ]
�
� |
Discussion of introducing wireless protection in G.984
�
� |
CMCC
� |
Q2/15
� |
2006-01-27 |
|
[ 651 ]
�
� |
A proposal to inter-layer aspects
�
� |
CMCC
,
Huawei
� |
Q14/15, Q12/15
� |
2006-01-27 |
|
[ 650 ]
�
� |
A proposal of adding connection status attributes for connection objects
�
� |
CMCC
,
Huawei
� |
Q14/15
� |
2006-01-27 |
|
[ 649 ]
�
� |
Proposal for Multiple Similar Connections per Call
�
� |
MII China
� |
Q14/15
� |
2006-01-27 |
|
[ 648 ]
�
� |
Characteristics of optical fibre submarine cable
�
� |
MII China
� |
Q8/15
� |
2006-01-27 |
|
[ 647 ]
�
� |
Draft Liaison Statement for Synchronous Ethernet OUI
�
� |
BT
� |
Q13/15
� |
2006-01-27 |
|
[ 646 ]
�
� |
Input to G.pactiming on DS1 network limits for CES
�
� |
USA
� |
Q13/15
� |
2006-01-27 |
|
[ 645 ]
�
� |
Missing words in G.707
�
� |
Nortel Networks
� |
Q11/15
� |
2006-01-27 |
|
[ 644 ]
�
� |
Client Service Management Methodology considerations
�
� |
Nortel Networks
� |
Q11/15
� |
2006-01-27 |
|
[ 643 ]
�
� |
Ethernet timing flows
�
� |
Nortel Networks
� |
Q13/15
� |
2006-01-27 |
|
[ 642 ]
�
� |
Comments on Transport MPLS SCN
�
� |
Tellabs
� |
Q12/15
� |
2006-01-27 |
|
[ 641 ]
�
� |
Synchronous Connection Points
�
� |
Tellabs
� |
Q12/15
� |
2006-01-27 |
|
[ 640 ]
�
� |
Comment on Appendix on PWE3 - MPLS Interworking
�
� |
Tellabs
� |
Q12/15
� |
2006-01-27 |
|
[ 639 ]
�
� |
Modelling Terminology Mapping
�
� |
Tellabs
� |
Q12/15
� |
2006-01-27 |
|
[ 638 ]
�
� |
G.shdsl, G.selt: SHDSL Test Parameters
�
� |
Infineon
� |
Q4/15
� |
2006-01-27 |
|
[ 637 ]
�
� |
ADSL: Working Text for India Annex
�
� |
BSNL
� |
Q4/15
� |
2006-01-27 |
|
[ 636 ]
�
� |
PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application
�
� |
LM Ericsson AB
� |
Q4/15
� |
2006-01-27 |
|
[ 635 ]
�
� |
Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach
�
� |
Deutsche Telekom
� |
Q6/15
� |
2006-01-27 |
|
[ 634 ]
�
� |
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803
�
� |
MII India
� |
Q12/15
� |
2006-01-27 |
|
[ 633 ]
�
� |
Reserved Labels for Transport MPLS
�
� |
Alcatel
� |
Q12/15, Q11/15, Q9/15
� |
2006-01-27 |
|
[ 632 ]
�
� |
Control of a T-MPLS packet transport network
�
� |
Alcatel
� |
Q14/15, Q12/15
� |
2006-01-27 |
|
[ 631 ]
�
� |
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks
�
� |
Lucent Technologies Germany
� |
Q13/15
� |
2006-01-27 |
|
[ 630 ]
�
� |
Improvement of clause 10 of G.pactiming in respect to normative and informative content
�
� |
Lucent Technologies Germany
� |
Q13/15
� |
2006-01-27 |
|
[ 629 ]
�
� |
Requirements of 10GE LAN signal transport over OTN ODU connections
�
� |
Lucent Technologies Germany
� |
Q11/15, Q12/15
� |
2006-01-27 |
|
[ 628 ]
�
� |
WITHDRAWN (same as D596)
�
Same as D.596
� |
N/A
� |
Q12/15
� |
2006-01-27 |
|
[ 627 ]
�
� |
Line diagnostics functionality
�
� |
BT
� |
Q4/15
� |
2006-01-27 |
|
[ 626 ]
�
� |
G.VDSL Capacity Simulations using Band Plans for 7 MHz and above
�
� |
BT
� |
Q4/15
� |
2006-01-27 |
|
[ 625 ]
�
� |
Ethernet Clock extraction and insertion
�
� |
BT
� |
Q13/15, Q12/15, Q9/15
� |
2006-01-27 |
|
[ 624 ]
�
� |
Comments/additions to G.7714.1
�
� |
BT
� |
Q14/15
� |
2006-01-27 |
Resultats:217 documents R�sultats :�
1 -
2 -
3 -
4 -
5
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):