Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2006-02-06�: Contributions Tardives� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� D�(2006-02-06)�

UIT-T�SG15

Infrastructures des r�seaux optiques et autres r�seaux de transport

P�riode d'�tudes 2005

R�union� du 2006-02-06 au 2006-02-17

Lieu : Suisse [Gen�ve]

Autres r�unions : 2008-12-01� 2008-02-11� 2007-06-04� 2006-10-30� [ 2006-02-06 ]� 2005-05-162004-11-29

Resultats:217 documents
R�sultats :� 1 - 2 - 3 - 4 - 5 �-�Suivant Next
Contributions Tardives��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 673 ]
G.adsl, G.vdsl: Text for Termination impedance model of ADSL or VDSL2 � LEA Q4/15 2006-01-30
[ 672 ]
G.vdsl: Defining impedance models for VDSL for testing and designing splitters � LEA , Alcatel Q4/15 2006-01-30
[ 671 ]
G.adsl, G.vdsl, G.test: Limiting the input capacitance of DSL transceivers over ISDN � LEA , Alcatel Q4/15 2006-01-30
[ 670 ]
G.adsl, G.vdsl, G.test: Limiting input capacitance of DSL transceivers over POTS � LEA , Alcatel Q4/15 2006-01-30
[ 669 ]
G.adsl, G.vdsl, Input capacitance of xDSL should have upper and lower bounds � LEA Q4/15 2006-01-30
[ 668 ]
G.vdsl: 5 liaisons to SG Q4/15 and 5 papers not handled under VDSL in Munich � LEA on behalf of the chair of ETSI AT-A Q4/15 2006-01-30
[ 667 ]
Proposed text for EoM mapping description in G.8012 � Alcatel Q11/15 2006-01-27
[ 666 ]
Proposal for Standardization of Ethernet transport networks � Huawei Q12/15 2006-01-27
[ 665 ]
Proposal for Automatic Discovery Synchronization and Update in ASON � China United Telecomms Q14/15 2006-01-27
[ 664 ]
Proposal for Multiple Control Channels in ASON � China United Telecomms Q14/15 2006-01-27
[ 663 ]
Best practice of cable link test in China � MII China Q5/15 2006-01-27
[ 662 ]
To put the formula of nominal central frequencies into G. Suppl 39 � MII China Q6/15 2006-01-27
[ 661 ]
Proposal for the introduction of Control Network Element Object in G.7718 � MII China Q14/15 2006-01-27
[ 660 ]
Proposals on the Usage of the Different Discovery Mechanisms � MII China Q14/15 2006-01-27
[ 659 ]
Proposals for the interactions between the control plane components in G.8080 � MII China Q12/15 2006-01-27
[ 658 ]
Proposal of new drafts for survivability of ASON network � MII China Q9/15 2006-01-27
[ 657 ]
Proposal For the Interface of Connection Controller Component in G.8080 � MII China Q12/15 2006-01-27
[ 656 ]
The response of call to a failure of connection � MII China Q14/15 2006-01-27
[ 655 ]
Addition of three more sub-type EVPL services to G.8011.2 � China Telecom Q11/15 2006-01-27
[ 654 ]
Proposed modification of label allocation rules to G.7713.2 � China Telecom Q14/15 2006-01-27
[ 653 ]
Discussion of SPC activation/deactivation functions � CMCC , Huawei Q14/15 2006-01-27
[ 652 ]
Discussion of introducing wireless protection in G.984 � CMCC Q2/15 2006-01-27
[ 651 ]
A proposal to inter-layer aspects � CMCC , Huawei Q14/15, Q12/15 2006-01-27
[ 650 ]
A proposal of adding connection status attributes for connection objects � CMCC , Huawei Q14/15 2006-01-27
[ 649 ]
Proposal for Multiple Similar Connections per Call � MII China Q14/15 2006-01-27
[ 648 ]
Characteristics of optical fibre submarine cable � MII China Q8/15 2006-01-27
[ 647 ]
Draft Liaison Statement for Synchronous Ethernet OUI � BT Q13/15 2006-01-27
[ 646 ]
Input to G.pactiming on DS1 network limits for CES � USA Q13/15 2006-01-27
[ 645 ]
Missing words in G.707 � Nortel Networks Q11/15 2006-01-27
[ 644 ]
Client Service Management Methodology considerations � Nortel Networks Q11/15 2006-01-27
[ 643 ]
Ethernet timing flows � Nortel Networks Q13/15 2006-01-27
[ 642 ]
Comments on Transport MPLS SCN � Tellabs Q12/15 2006-01-27
[ 641 ]
Synchronous Connection Points � Tellabs Q12/15 2006-01-27
[ 640 ]
Comment on Appendix on PWE3 - MPLS Interworking � Tellabs Q12/15 2006-01-27
[ 639 ]
Modelling Terminology Mapping � Tellabs Q12/15 2006-01-27
[ 638 ]
G.shdsl, G.selt: SHDSL Test Parameters � Infineon Q4/15 2006-01-27
[ 637 ]
ADSL: Working Text for India Annex � BSNL Q4/15 2006-01-27
[ 636 ]
PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application � LM Ericsson AB Q4/15 2006-01-27
[ 635 ]
Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach � Deutsche Telekom Q6/15 2006-01-27
[ 634 ]
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803 � MII India Q12/15 2006-01-27
[ 633 ]
Reserved Labels for Transport MPLS � Alcatel Q12/15, Q11/15, Q9/15 2006-01-27
[ 632 ]
Control of a T-MPLS packet transport network � Alcatel Q14/15, Q12/15 2006-01-27
[ 631 ]
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks � Lucent Technologies Germany Q13/15 2006-01-27
[ 630 ]
Improvement of clause 10 of G.pactiming in respect to normative and informative content � Lucent Technologies Germany Q13/15 2006-01-27
[ 629 ]
Requirements of 10GE LAN signal transport over OTN ODU connections � Lucent Technologies Germany Q11/15, Q12/15 2006-01-27
[ 628 ]
WITHDRAWN (same as D596) �
Same as D.596
N/A � Q12/15 2006-01-27
[ 627 ]
Line diagnostics functionality � BT Q4/15 2006-01-27
[ 626 ]
G.VDSL Capacity Simulations using Band Plans for 7 MHz and above � BT Q4/15 2006-01-27
[ 625 ]
Ethernet Clock extraction and insertion � BT Q13/15, Q12/15, Q9/15 2006-01-27
[ 624 ]
Comments/additions to G.7714.1 � BT Q14/15 2006-01-27
Resultats:217 documents
R�sultats :� 1 - 2 - 3 - 4 - 5 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2006-02-02