International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP5D� C�

ITU-R�R23-WP5D

IMT Systems

Results:433 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 433 ]
Documents from Study Group 5 to Working Party 5D � Chair, SG 5 2024-12-20
[ 432 ]
Reply liaison statement to ITU-R Working Party 5D (copy to RAG, TSAG, TDAG, ITU-T SGs 17 AND 13 and ITU-R WP 4B) - Terms and definitions related to IMT-2020 (5G) technology � CCT 2024-12-20
[ 431 ]
Liaison statement to ITU-T Study Group 12 and to ITU-R Working Parties 1A and 5D - Clarifications on the term "conducted radio frequency connection" and its definition � CCT 2024-12-19
[ 430 ]
Reply liaison statement to Working Party 5D - Coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz � WP 5C 2024-12-13
[ 429 ]
Liaison Note to ITU-R Working Party 5D � International Association of Marine Aids to Navigation and Lighthouse Authorities 2024-12-13
[ 428 ]
Reply liaison statement on parameters for 14 800 to 15 350 MHz of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27 � Director, BR 2024-12-05
[ 427 ]
Reply liaison statement to Working Party 5D - Additional technical information for sharing and compatibility studies under WRC-27 agenda item 1.7 for ARNS and AM(R)S systems in frequency band 4 200-4 400 MHz � WP 5B AI1.7 2024-12-05
[ 426 ]
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Working Parties 5D and 1C on base station antenna OTA conformance testing - ITU-D Study Group 2 Question 4/2 - Telecommunication/ICT equipment - Conformance and interoperability, combating counterfeiting and theft of mobile devices � ITU-D SG2 - Q4/2 2024-12-04
[ 425 ]
Liaison statement to Working Party 5D - AMS and MMS systems characteristics in the frequency bands 4 400-4 800 MHz and 14.8-15.35 GHz under WRC-27 agenda item 1.7 � WP 5B AI1.7 2024-12-03
[ 424 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management � ITU-D SG1 - Q3/1 2024-11-27
[ 423 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-11-18
[ 422 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � WP 6A AI1.17 2024-11-18
[ 421 ]
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1 � WP 4A AI1.1 2024-11-07
[ 420 ]
Public protection and disaster relief Rapporteur Report � PP Disaster Relief Liaison Rapporteur 2024-11-06
[ 419 ]
Reply liaison statement to Working Party 5D - WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-10-22
[ 418 ]
Reply liaison statement to Working Party 5D - Relevant information to support studies under WRC-27 agenda item 1.7 � WP 4C AI1.7 2024-10-22
[ 417 ]
Liaison statement to Working Party 5D - Protection of receiving earth stations of the radionavigation satellite service operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz from spurious emissions of IMT stations in the frequency range below 3 GHz � WP 4C 2024-10-22
[ 416 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11 � WP 4C AI1.13 2024-10-22
[ 415 ]
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-10-22
[ 414 ]
Proposal towards development of a new Report on "technical feasibility towards providing wireless broadband using IMT technology" � Kenya 2024-09-21
[ 413 ]
+Ch.7(Rev.1)
Report on the 47th meeting of Working Party 5D (Geneva, 3-11 October 2024) � Acting Chair, WP 5D 2024-10-11
[ 412 ]
Final list of participants - Working Party 5D (Geneva, 3-11 October 2024) � Director, BR 2024-10-11
[ 411 ]
Update Report on CITEL PCC.II activities � Citel Rapporteur 2024-10-03
[ 410 ]
Update on recent activities within ATU � ITU Region 1 (ATU) Rapporteur 2024-10-01
[ 409 ]
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 408 ]
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14 � WP 7C AI1.14 2024-09-30
[ 407 ]
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 406 ]
Liaison statement to Working Party 5D regarding WRC-27 agenda item 1.7 - Technical information to support studies under WRC-27 agenda item 1.7 in relation to WRC-27 agenda item 1.15 � WP 7B AI1.7, AI1.15 2024-09-30
[ 405 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT) � WP 7D 2024-09-30
[ 404 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7 � WP 7D AI1.7 2024-09-30
[ 403 ]
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) � WP 7B AI1.7 2024-09-30
[ 402 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 7D AI1.15 2024-09-30
[ 401 ]
Liaison statement to Working Party 5D - WRC-27 agenda items 1.19 and 1.7 � WP 7C AI1.7, AI1.19 2024-09-27
[ 400 ]
Reply liaison statement to Working Party 5D - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz � WP 7B 2024-09-27
[ 399 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1 � WP 7D AI1.1 2024-09-27
[ 398 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13 � WP 7D AI1.13, AI1.12 2024-09-27
[ 397 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11 � WP 7D AI1.11 2024-09-27
[ 396 ]
Update on activities in Region 3 � Region 3 Rapporteur 2024-09-26
[ 395 ]
Proposal for a new Recommendation on possible coordination between NGSO FSS (space-to-Earth) ground stations operating in the frequency band 6 700-7 075 MHz and IMT stations operating in the band 6 425-7 125 MHz � France 2024-09-20
[ 394 ]
A method for determining the probability associated with interference protection criteria, for sharing and compatibility studies � France 2024-09-20
[ 393 ]
Determination and mitigation of electromagnetic compatibility issues for IMT (5G) network under tropospheric duct effect � ATDI 2024-09-21
[ 392 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications � WP 7A AI1.15 2024-09-23
[ 391 ]
Interim evaluation report from 5GIF IEG on the candidate technology towards Revision-3 of IMT-2020 � Director, BR 2024-09-21
[ 390 ]
Sharing and compatibility studies involving IMT for WRC-27 � Nokia Corporation 2024-09-21
[ 389 ]
IMT characteristics for use in WRC-27 studies � GSM Association 2024-09-21
[ 388 ]
Consideration on characteristics of adjacent services to the 4 400-4 800 MHz band for compatibility studies under WRC-27 agenda item 1.7 � GSM Association AI1.7 2024-09-21
[ 387 ]
Proposals for the working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] � Telefon AB - LM Ericsson 2024-09-21
[ 386 ]
Proposals for test environments for the evaluation of IMT-2030 � Telefon AB - LM Ericsson 2024-09-21
[ 385 ]
Updates to WRC-27 agenda item 1.7 sharing and compatibility studies - Main part � New Zealand AI1.7 2024-09-21
[ 384 ]
Updates to WRC-27 agenda item 1.7 sharing and compatibility studies - Annex 3 (14.8-15.35 GHz) � New Zealand AI1.7 2024-09-21
Results:433 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-20