International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4C� C�

ITU-R�R23-WP4C

Efficient Orbit/Spectrum Utilization for MSS and RDSS

Results:228 total items.
Result page:� 1 - 2 - 3 - 4 - 5 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 228 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.14 � WP 5C AI1.14 2024-12-13
[ 227 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.12 � WP 5C AI1.12 2024-12-13
[ 226 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda items 1.12, 1.13 and 1.14 � WP 5C AI1.14, AI1.13, AI1.12 2024-12-13
[ 225 ]
Reply liaison statement to Working Party 4C - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.11 � WP 5C AI1.11 2024-12-13
[ 224 ]
Reply liaison statement to Working Party 4C (copy to Working Party 4A for information) - Relevant technical information to support studies under WRC-27 agenda item 1.10 � WP 5C AI1.10 2024-12-13
[ 223 ]
Liaison statement to Working Party 4C - Technical characteristics and protection criteria for aeronautical telemetry systems operating in the frequency band 1 427-1 432 MHz and adjacent bands under WRC-27 agenda item 1.12 � WP 5B AI1.12 2024-12-12
[ 222 ]
Liaison statement to Working Party 4C - Relevant technical information to support studies under WRC-27 agenda item 1.14 � WP 5A AI1.14 2024-12-11
[ 221 ]
Liaison statement to Working Party 4C - Technical information to support the studies for WRC-27 agenda item 1.13 � WP 5A AI1.13 2024-12-11
[ 220 ]
Liaison statement to Working Party 4C - Relevant technical information to support studies under WRC-27 agenda item 1.12 � WP 5A AI1.12 2024-12-11
[ 219 ]
Liaison statement to Working Party 4C - Relevant technical information to support studies under WRC-27 agenda item 1.11 � WP 5A AI1.11 2024-12-11
[ 218 ]
Liaison statement to Working Party 4C - Protection of RNSS receivers operating in 5 010-5 030 MHz from AM(R)S transmitters operating in 5 030-5 091 MHz � WP 5B 2024-12-02
[ 217 ]
Liaison statement to Working Party 7D (copy for information to Working Parties 4A and 4C) - WRC-27 agenda item 1.16 � WP 5B AI1.16 2024-11-29
[ 216 ]
Reply liaison statement to Working Party 4C - Relevant technical information for sharing studies under WRC-27 agenda item 1.13 � WP 5B AI1.13 2024-11-29
[ 215 ]
Liaison statement to Working Party 4C - Relevant technical information to take into account for sharing studies under WRC-27 agenda item 1.11 � WP 5B AI1.11 2024-11-29
[ 214 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management � ITU-D SG1 - Q3/1 2024-11-27
[ 213 ]
Information on characteristics of FSS and MSS networks or systems as currently contained in BR IFIC required for studies under WRC-27 agenda item 1.10 � Director, BR AI1.10 2024-11-26
[ 212 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-11-18
[ 211 ]
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-11-18
[ 210 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � WP 6A AI1.17 2024-11-18
[ 209 ]
Liaison statement to Working Parties 4A and 4C (copy to Working Party 1C) - Review of the part of the ITU Handbook on Spectrum Monitoring describing Global Navigation Satellite Systems Society of Motion Picture and Television Engineers � WP 1C RG on revision of ITU Handbook on Spectrum Monitoring 2024-11-15
[ 208 ]
Liaison statement to Working Parties 4B, 4C, 5A and 7B - Handbook on satellite communications and technologies � WP 4A 2024-11-14
[ 207 ]
Liaison statement to Working Party 1C, 4B, 4C and 5A - Draft table of contents (ToC) of Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services � WP 4A 2024-11-07
[ 206 ]
Report of the twentieth meeting of the Joint IMO/ITU Experts Group on Maritime Radiocommunication Matters � International Maritime Organization 2024-10-29
[ 205 ]
Liaison statement to Working Parties 4A and 4C - Draft Table of Contents (ToC) of a revised Satellite Communications Handbook � WP 4B 2024-10-23
[ 204 ]
+Ann.1-19
Report of the thirty-second meeting of Working Party 4C (Geneva, 10-18 October 2024) � Chair, WP 4C 2024-10-18
[ 203 ]
Final list of participants - Working Party 4C (Geneva, 10-18 October 2024) � Director, BR 2024-10-18
[ 202 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.12 � WP 5D AI1.12 2024-10-14
[ 201 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.11 � WP 5D AI1.11 2024-10-14
[ 200 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.14 � WP 5D AI1.14 2024-10-14
[ 199 ]
Reply liaison statement to Working Party 4C - WRC-27 agenda item 1.13 � WP 5D AI1.13 2024-10-14
[ 198 ]
List of documents issued (Documents 4C/77 - 4C/198) � BR, Study Groups Department 2024-10-09
[ 197 ]
Analysis of space frequency assignments recorded under No. 11.41 � Director, BR 2024-10-09
[ 196 ]
Reply liaison statement to Working Party 4C on WRC-27 agenda items 1.12, 1.13, 1.14 and 1.15 � WP 7B AI1.15, AI1.14, AI1.13, AI1.12 2024-10-08
[ 195 ]
Reply liaison statement to ITU-R Working Party 4C regarding WRC-27 agenda item 1.11 - Technical information to support studies under WRC-27 agenda item 1.11 � WP 7B AI1.11 2024-10-08
[ 194 ]
Reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.11 � WP 7C AI1.11 2024-10-08
[ 193 ]
Reply liaison statement to Working Party 4C - Updates regarding Working Party 7C consideration of RNSS-related comments on Report ITU-R RS.2537-0, Recommendation ITU-R RS.2165-0, and working document towards a preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS] (Questions ITU-R 217-2/4 and ITU-R 288/4) � WP 7C 2024-10-08
[ 192 ]
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8 � WP 7C AI1.8 2024-10-01
[ 191 ]
SKAO's views on WRC-27 agenda item 1.16 � Square Kilometre Array Observatory (SKAO) AI1.16 2024-09-28
[ 190 ]
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 189 ]
Reply liaison statement to Working Party 4C regarding WRC-27 agenda items 1.12 and 1.13 � WP 7C AI1.13, AI1.12 2024-09-30
[ 188 ]
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14 � WP 7C AI1.14 2024-09-30
[ 187 ]
Reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.15 - Technical information to support studies under WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 186 ]
Revisions to working document under WRC-27 agenda item 1.12 - Studies on low-data-rate non-GSO mobile-satellite systems in the mobile-satellite service � United Kingdom AI1.12 2024-09-27
[ 185 ]
Revisions to working document under WRC-27 agenda item 1.11 - Non-geostationary satellites operating space-to-space links in mobile-satellite service (MSS) allocations in the frequency bands 1 518-1 544 MHz, 1 545-1 559 MHz, 1 610-1 645.5 MHz, 1 646.5-1 660 MHz, 1 670-1 675 MHz and 2 483.5-2 500 MHz � United Kingdom AI1.11 2024-09-27
[ 184 ]
Revisions to Recommendation ITU-R M.1184-3 - Technical characteristics of mobile satellite systems in the frequency bands below 3 GHz for use in developing criteria for sharing between the mobile-satellite service (MSS) and other services � United Kingdom 2024-09-27
[ 183 ]
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-09-30
[ 182 ]
Considerations for studies regarding WRC-27 agenda item 1.13 � GSM Association AI1.13 2024-09-28
[ 181 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT) � WP 7D 2024-09-30
[ 180 ]
Key components for developing a working document to support WRC-27 agenda item 1.14 � Mexico AI1.14 2024-09-28
[ 179 ]
Input for working document regarding WRC-27 agenda item 1.12 - Studies on low-data-rate non-GSO mobile-satellite systems in the mobile-satellite service � Mexico AI1.12 2024-09-28
Results:228 total items.
Result page:� 1 - 2 - 3 - 4 - 5 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-13