International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4A� C�

ITU-R�R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:358 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 358 ]
Proposed Topic to be considered under WRC-27 agenda item 7 to improve the accuracy of geographical coordinates in SpaceCap for Earth Station filings � Nigeria AI7 2024-12-19
[ 357 ]
Reply liaison statement to Working Party 4C (copy to Working Party 4A for information) - Relevant technical information to support studies under WRC-27 agenda item 1.10 � WP 5C AI1.10 2024-12-13
[ 356 ]
Reply liaison statement to Working Party 4A - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.1 � WP 5C AI1.1 2024-12-13
[ 355 ]
Liaison statement to Working Party 4A - Relevant technical information to support studies under WRC-27 agenda item 1.2 � WP 5A AI1.2 2024-12-11
[ 354 ]
Liaison statement to Working Party 4A - Information to support studies under WRC-27 agenda item 1.1 � WP 5A AI1.1 2024-12-11
[ 353 ]
Liaison statement to Working Party 4A - Handbook on Satellite Communications and Technologies � WP 5A 2024-12-11
[ 352 ]
Liaison statement to Working Party 4A - WRC-27 agenda item 1.4 � WP 5A AI1.4 2024-12-11
[ 351 ]
Liaison statement to Working Party 4A - WRC-27 agenda item 1.3 � WP 5A AI1.3 2024-12-11
[ 350 ]
Liaison statement to Working Party 7D (copy for information to Working Parties 4A and 4C) - WRC-27 agenda item 1.16 � WP 5B AI1.16 2024-11-29
[ 349 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management � ITU-D SG1 - Q3/1 2024-11-27
[ 348 ]
Information on characteristics of FSS and MSS networks or systems as currently contained in BR IFIC required for studies under WRC-27 agenda item 1.10 � Director, BR AI1.10 2024-11-26
[ 347 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-11-18
[ 346 ]
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-11-18
[ 345 ]
Liaison statement to Working Parties 4A and 4C (copy to Working Party 1C) - Review of the part of the ITU Handbook on Spectrum Monitoring describing Global Navigation Satellite Systems Society of Motion Picture and Television Engineers � WP 1C RG on revision of ITU Handbook on Spectrum Monitoring 2024-11-15
[ 344 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10 � WP 4C AI1.10 2024-11-12
[ 343 ]
+Ann.1-47
Report on the fifty-fifth meeting of Working Party 4A (Geneva, 21-31 October 2024) � Chair, WP 4A 2024-11-01
[ 342 ]
Final list of participants - Working Party 4A (Geneva, 21-31 October 2024) � Director, BR 2024-11-01
[ 341 ]
Liaison statement to Working Parties 4A and 4C - Draft Table of Contents (ToC) of a revised Satellite Communications Handbook � WP 4B 2024-10-23
[ 340 ]
Reply liaison statement to Working Party 5B (copy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8 � WP 4C AI1.8 2024-10-22
[ 339 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11 � WP 4C AI1.11 2024-10-22
[ 338 ]
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-10-22
[ 337 ]
(Rev.1)
List of documents issued (Documents 4A/128 - 4A/337) � BR, Study Groups Department 2024-10-21
[ 336 ]
Reply liaison statement to Working Party 4A - Information to support studies under WRC-27 agenda item 1.1 � WP 4C AI1.1 2024-10-17
[ 335 ]
Liaison statement to Working Party 4A (copy to Study Group 4) - Satellite Communication Handbook � WP 4C 2024-10-16
[ 334 ]
Reply liaison statement to Working Party 4A - WRC-27 agenda item 1.1 � WP 5D AI1.1 2024-10-14
[ 333 ]
Proposal to finalize the work on the "working document towards a preliminary draft new Report ITU-R S.[MITIGATION MEASURES]" � Mexico 2024-10-09
[ 332 ]
View on the proposed topic to be considered under agenda item 7 of WRC-27 regarding BIU, BBIU and provision No. 11.44B � Mexico AI7 2024-10-09
[ 331 ]
Views on the proposed topic to be considered under agenda item 7 of WRC-27 regarding FSS of Region 2 into plan BSS of Regions 1 and 3 � Mexico AI7 2024-10-09
[ 330 ]
Elements for working document on WRC-27 agenda item 1.5 - Limiting uplink transmissions from unauthorized non-GSO user terminals based on location information � Eutelsat S.A AI1.5 2024-10-09
[ 329 ]
Considerations with respect to Recommendation ITU-R S.1586-1 methodology and possible improvements � Eutelsat S.A. 2024-10-09
[ 328 ]
Proposed reply liaison statement from Working Party 4A to Working Party 7D - Relevant technical information to support studies under WRC-27 agenda item 1.16 documenting FSS characteristics in some frequency bands � France AI1.16 2024-10-09
[ 327 ]
Initial elements for the draft CPM on WRC-27 agenda item 1.4 � France AI1.4 2024-10-09
[ 326 ]
Proposed reply liaison statement to Working Party 5D documenting FSS characteristics in the frequency range 7 125-8 400 MHz for sharing and compatibility studies under WRC-27 agenda item 1.7 � France AI1.7 2024-10-09
[ 325 ]
Proposed reply liaison statement to Working Party 5C � France AI1.10 2024-10-09
[ 324 ]
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) � France AI1.2 2024-10-09
[ 323 ]
Considerations with respect to proposed studies on Resolution 35 (Rev.WRC-23) � France 2024-10-09
[ 322 ]
Proposed amendments to working document towards a preliminary draft new recommendation - Maximum allowable aggregate interference levels from time-variant sources from other services into fixed-satellite service links � France 2024-10-09
[ 321 ]
Proposed modifications to the working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-[NGSO/GSO]] � France 2024-10-09
[ 320 ]
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] � France 2024-10-09
[ 319 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[EXCEEDANCE EPFD KA KU] - Examples of Technical procedures for addressing any exceedance of aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands... � France 2024-10-09
[ 318 ]
Proposed revision to Recommendation ITU-R BO.1504-0 � European Broadcasting Union , Broadcast Networks Europe 2024-10-09
[ 317 ]
Clarification on the proposed ToC of working document towards a preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services � Astroscale Ltd. 2024-10-09
[ 316 ]
Proposed revisions to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] � SES 2024-10-09
[ 315 ]
Statistics and information on satellite networks related to Resolution 35 (Rev.WRC-23) � Director, BR 2024-10-10
[ 314 ]
Generation of a coverage diagram that represents the smallest area encompassing the associated service area of the satellite networks under RR Appendices 30A or 30B and Resolution 170 (Rev.WRC-23) � Director, BR 2024-10-10
[ 313 ]
Update to working document on RR Article 22 epfd studies � United Kingdom 2024-10-09
[ 312 ]
Analysis of alpha table methodology proposing potential enhancement � United Kingdom 2024-10-09
[ 311 ]
Draft reply liaison statement to Working Party 5C - Studies under WRC-27 agenda item 1.10 � United Kingdom AI1.10 2024-10-09
[ 310 ]
Review of the long-term protection limits defined in RR Article 22 and Resolution 76 (Rev.WRC-23) � Intelsat 2024-10-09
[ 309 ]
Information on the current status of deployments in the middle Earth orbit (MEO) to progress work on preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services � Intelsat 2024-10-09
Results:358 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-19