International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP3L : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP3L� C�

ITU-R�R23-WP3L

Ionospheric Propagation and Radio Noise

Results:38 total items.
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 38 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � WP 6A AI1.17 2024-11-19
[ 37 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11 � WP 4C AI1.11 2024-10-22
[ 36 ]
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-10-22
[ 35 ]
Reply liaison statement to Working Party 4C (copy to the SG 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14 � WP 7C AI1.14 2024-09-30
[ 34 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13 � WP 7D AI1.13, AI1.12 2024-09-27
[ 33 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 3L, 5C, and 6A for information and copy to ICAO for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.9 on the modernization of RR Appendix 26 � WP 7A AI1.9 2024-09-23
[ 32 ]
Information on the preparation of texts for the draft CPM Report to WRC-27 � Chair, CPM-27 2024-07-09
[ 31 ]
+Ann.1-15
Report on the meeting of Working Party 3L (Denver, Colorado, USA, 29 May - 7 June 2024) � Chair, WP 3L 2024-06-08
[ 30 ]
Final list of participants WP 3L (Denver, Colorado, USA, 29 May - 7 June 2024) � Director, BR 2024-06-08
[ 29 ]
List of documents issued (Documents 3L/1 - 3L/29) � BR, Study Groups Department 2024-05-31
[ 28 ]
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13 � WP 5C AI1.13 2024-05-29
[ 27 ]
Liaison statement to ITU-R Working Parties 3L, 5C, 6A and 7A (copy to ICAO for information) - Request for relevant technical information to support studies under WRC-27 agenda item 1.9 in order to review Appendix 26 of the Radio Regulations to support modernization of high-frequency spectrum use in the aeronautical mobile (OR) service � WP 5B AI1.9 2024-05-28
[ 26 ]
Submission of external noise data to radio noise databank - 2024 � United Kingdom 2024-05-17
[ 25 ]
Supporting documentation for MATLAB code for processing white gaussian noise recordings � United Kingdom 2024-05-17
[ 24 ]
Ofcom's long-term radio noise measurement campaign in the United Kingdom - 2024 update � United Kingdom 2024-05-17
[ 23 ]
Towards a set of machine learning methods for radiowave propagation modelling � Canada 2024-05-17
[ 22 ]
Supplement for Recommendation ITU-R P.531 on modelling ionospheric scintillation occurrence variations with geomagnetic latitude � China , France 2024-05-16
[ 21 ]
Supporting information document on Recommendation ITU-R P.1239 - Validation of computational method influence of R12 in foF2 prediction of Recommendation ITU-R P.1239 using ionospheric observations from Chinese region � China 2024-05-16
[ 20 ]
Discussion document on the machine learning model in the field of radio wave propagation � China 2024-05-16
[ 19 ]
Working document towards a preliminary draft revision of Recommendation ITU-R P.533-14 - Update L_y and L_z values � United States 2024-05-13
[ 18 ]
Working document toward a preliminary draft revision of HDB-58 - Update of Handbook 58 on ITU-R propagation prediction methods for interference and sharing studies � United States 2024-05-13
[ 17 ]
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products � CG 3M-4 2024-05-14
[ 16 ]
Report on activities during April 2023 to April 2024 � CG 3L-7 2024-05-05
[ 15 ]
Preliminary draft revision of Recommendation ITU-R P.372 - Step-by-step brightness temperature method - Radio noise � CG 3L-7 2024-05-05
[ 14 ]
Draft new fascicle on the brightness temperature prediction method in Recommendation ITU-R P.372 � CG 3L-7 2024-05-05
[ 13 ]
Correspondence Group 3L-20 Activity Report � CG 3L-20 2024-05-03
[ 12 ]
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14 � WP 4C AI1.14 2024-05-01
[ 11 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13 � WP 4C AI1.13 2024-05-01
[ 10 ]
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12 � WP 4C AI1.12 2024-05-01
[ 9 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11 � WP 4C AI1.11 2024-05-01
[ 8 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chair, CCV 2024-04-22
[ 7 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17 � WP 7C AI1.17 2024-03-25
[ 6 ]
Liaison statement to Working Party 5B (copy to Working Parties 3L, 5C and 7A) - Protection requirements for the HF broadcasting service relative to WRC-27 agenda item 1.9 � WP 6A AI1.9 2024-03-18
[ 5 ]
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13 � WP 6A AI1.13 2024-03-18
[ 4 ]
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11 � WP 6A AI1.11 2024-03-18
[ 3 ]
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17 � WP 6A AI1.17 2024-03-18
[ 2 ]
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda � Director, BR 2024-01-30
[ 1 ]
Documents to be carried over from the 2019-2023 Study Period � WP 3L 2023-12-06
Results:38 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-11-19