Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 79 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
�
� |
WP 6A
� |
AI1.10
� |
2024-11-19 |
|
[ 78 ]
�
� |
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
�
� |
WP 4A
� |
AI1.1
� |
2024-11-07 |
|
[ 77 ]
�
� |
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8
�
� |
WP 7C
� |
AI1.8
� |
2024-10-01 |
|
[ 76 ]
�
� |
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-09-30 |
|
[ 75 ]
�
� |
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-09-30 |
|
[ 74 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
�
� |
WP 7D
� |
AI1.8
� |
2024-09-27 |
|
[ 73 ]
�
� |
Reply liaison statement to Working Parties 3J, 3K and 3M - Relevant technical information to support studies in preparation of WRC-27 agenda items
�
� |
WP 7D
� |
AI1.8, AI1.7, AI1.3, AI1.18, AI1.17, AI1.16, AI1.15, AI1.11, AI1.10, AI1.1
� |
2024-09-27 |
|
[ 72 ]
�
� |
Determination and mitigation of electromagnetic compatibility issues for IMT (5G) network under tropospheric duct effect
�
� |
ATDI
� |
� |
2024-09-21 |
|
[ 71 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
�
� |
WP 7A
� |
AI1.15
� |
2024-09-23 |
|
[ 70 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
� |
2024-07-09 |
|
[ 69 ]
�
� |
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T SG5
�
� |
WP 5D
� |
� |
2024-07-05 |
|
[ 68 ]
�
� |
Liaison statement on draft Recommendation ITU-T K.DMEI -Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect
�
� |
ITU-T SG5
� |
� |
2024-06-18 |
|
[ 67 ]
�
+Ann.1-40� |
Report on the meeting of Working Party 3J (Denver, Colorado, USA, 29 May - 7 June 2024)
�
� |
Chair, WP 3J
� |
� |
2024-06-08 |
|
[ 66 ]
�
� |
Final list of participants WP 3J (Denver, Colorado, USA, 29 May - 7 June 2024)
�
� |
Director, BR
� |
� |
2024-06-08 |
|
[ 65 ]
�
� |
List of documents issued (Documents 3J/1 - 3J/65)
�
� |
WP 3J
� |
� |
2024-06-01 |
|
[ 64 ]
�
� |
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2024-05-29 |
|
[ 63 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials
�
� |
WP 5C
� |
AI1.18
� |
2024-05-29 |
|
[ 62 ]
�
� |
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WP 5C
� |
AI1.10
� |
2024-05-29 |
|
[ 61 ]
�
� |
Contribution to DBSG3 Table IV-1: Rain rate statistics in Cochabamba
�
� |
Spain
,
France
� |
� |
2024-05-17 |
|
[ 60 ]
�
� |
Comparison between ERA5 cloud parameters and simultaneous experimental rainfall rate in Madrid
�
� |
Spain
� |
� |
2024-05-17 |
|
[ 59 ]
�
� |
Rain attenuation at millimetre waves and its variability caused by the shape of the drop size distribution
�
� |
Spain
� |
� |
2024-05-17 |
|
[ 58 ]
�
� |
Proposed revision to Report ITU-R P.2346-5 - Outdoor-to-indoor propagation loss model on a NLoS path based on building entry loss (BEL) and clutter loss (CL) model
�
� |
Korea (Rep. of)
� |
� |
2024-05-17 |
|
[ 57 ]
�
� |
Proposed revision to Report ITU-R P.2346-5 - Characteristics of window penetration loss (WinPL) and its impact on BEL
�
� |
Korea (Rep. of)
� |
� |
2024-05-17 |
|
[ 56 ]
�
� |
Working document toward a preliminary draft new Question ITU-R [LUNAR_COMMNUNICATION]/3 - Relevant propagation characteristics and prediction method for lunar surface systems and lunar-orbiting systems
�
� |
Korea (Rep. of)
� |
AI1.15
� |
2024-05-17 |
|
[ 55 ]
�
� |
Proposed reply liaison statement to Working Party 7D
�
� |
South Africa
� |
AI1.18, AI1.16
� |
2024-05-17 |
|
[ 54 ]
�
� |
Liaison statement to Working Parties 3J, 3K and 3M - Propagation information to support studies in preparation for WRC-27 agenda item 1.8
�
� |
WP 5B
� |
AI1.8
� |
2024-05-20 |
|
[ 53 ]
�
� |
Contribution to Recommendation ITU-R P.310 - Discussion regarding definition of human blockage
�
� |
United Kingdom
� |
� |
2024-05-17 |
|
[ 52 ]
�
� |
Excel implementations of P-Series Recommendations - Recommendations ITU-R P.837-6, ITU-R P.838-3 and ITU-R P.839-4
�
� |
United Kingdom
� |
� |
2024-05-17 |
|
[ 51 ]
�
� |
Application of Machine Learning/Artificial Intelligence for modelling of RadioWave propagation - Ofcom's preliminary investigation on path-specific prediction methods
�
� |
United Kingdom
� |
� |
2024-05-17 |
|
[ 50 ]
�
� |
Towards a set of Machine learning methods for Radiowave propagation modelling
�
� |
Canada
� |
� |
2024-05-17 |
|
[ 49 ]
�
� |
Proposed revision to Recommendation ITU-R P.1812-7 - Clutter classification model
�
� |
Canada
� |
� |
2024-05-17 |
|
[ 48 ]
�
� |
Software implementation of Recommendation ITU-R P.2146 on sea surface bistatic scattering
�
� |
Institute of Electrical and Electronics Engineers, Inc. (IEEE) (United States)
� |
� |
2024-05-16 |
|
[ 47 ]
�
� |
Discussion document on the machine learning model in the field of radio wave propagation
�
� |
China
� |
� |
2024-05-16 |
|
[ 46 ]
�
� |
Discussion document on slant path diffraction model extention of Recommendation ITU-R P.526
�
� |
China
� |
� |
2024-05-16 |
|
[ 45 ]
�
� |
Discussion document for Recommendation ITU-R P.530-18 - Atmospheric scintillation at 340 GHz
�
� |
China
� |
� |
2024-05-16 |
|
[ 44 ]
�
� |
Discussion document about Recommendation ITU-R P.453-14
�
� |
China
� |
� |
2024-05-16 |
|
[ 43 ]
�
� |
Supplement to Annex 24 to the Working Party 3J Chair's Report
�
� |
China
� |
� |
2024-05-16 |
|
[ 42 ]
�
� |
Supporting document about the tropospheric delay mapping function
�
� |
China
� |
� |
2024-05-16 |
|
[ 41 ]
�
� |
Proposed draft modification to Recommendation ITU-R P.1621-2 - Propagation data required for the design of Earth-space systems operating between 20 THz and 375 THz
�
� |
China
� |
� |
2024-05-16 |
|
[ 40 ]
�
� |
Proposed modification to Recommendation ITU-R P.838-3 - Specific attenuation model for rain for use in prediction methods
�
� |
China
� |
� |
2024-05-16 |
|
[ 39 ]
�
� |
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 38 ]
�
� |
Support document for Annex 10 to Document 3K/335 - Prediction of building entry loss
�
� |
Japan
� |
� |
2024-05-16 |
|
[ 37 ]
�
� |
Correspondence Group 3J-17 activity Report
�
� |
Co-Chairs, CG 3J-17
� |
� |
2024-05-16 |
|
[ 36 ]
�
� |
Proposed revisions of Recommendations ITU-R P.526-15 and ITU-R P.619-5 - Propagation by diffraction - addition of a general terrain slant path model
�
� |
Australia
� |
� |
2024-05-16 |
|
[ 35 ]
�
� |
Submission of D-Band rain attenuation statistics affecting an 800-m terrestrial link for Table I-1 of DBSG3
�
� |
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria (Italy)
� |
� |
2024-05-16 |
|
[ 34 ]
�
� |
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies
under WRC-27 agenda item 1.18
�
� |
WP 4A
� |
AI1.18
� |
2024-05-15 |
|
[ 33 ]
�
� |
Merge of two working documents towards a preliminary draft revision of Recommendation ITU-R P.676-13 into one document - Attenuation by atmospheric gases and related effects
�
� |
Russian Federation
� |
� |
2024-05-14 |
|
[ 32 ]
�
� |
Modification to the preliminary draft revision of Recommendation ITU-R P.526-15 - Propagation by diffraction
�
� |
Russian Federation
� |
� |
2024-05-14 |
|
[ 31 ]
�
� |
Proposal on elevation of preliminary draft revision of Recommendation ITU-R P.525-4 - Calculation of free-space attenuation
�
� |
Russian Federation
� |
� |
2024-05-14 |
|
[ 30 ]
�
� |
Correspondence Group 3J-3K-3M-14 Activity Report - Issues relating to the HAPS propagation model
�
� |
Chair, CG 3J-3K-3M-14
� |
� |
2024-05-14 |
Results:79 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):