International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP1B� C�

ITU-R�R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Results:53 total items.
Result page:� 1 - 2 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 53 ]
Reply liaison statement to ITU-R Working Party 1B and ITU-T Study Groups 11, 17 and 20 (copy to ITU-R Working Party 1A) - Addition of the UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term � CCT 2024-12-19
[ 52 ]
Reply liaison statement to Working Party 1B (copy to Working Party 5B) - Studies related to revision on Recommendation ITU-R SM.1896-1 and Report ITU-R SM.2153-9 � WP 5A 2024-12-13
[ 51 ]
Liaison statement to Working Parties 1B, 5C and 6A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS] � WP 5A 2024-12-11
[ 50 ]
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management � ITU-D SG1 - Q3/1 2024-11-27
[ 49 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B on economic aspects of telecommunication/ICTs - ITU-D Study Group 1 Question 4/1: Economic aspects of national telecommunications/ICTs � ITU-D SG1 Q4/1 2024-11-18
[ 48 ]
+Ann.2-6
Report on the second 2023-2027 meeting of Working Party 1B (Geneva, 5-8 November 2024) � Chair, WP 1B 2024-11-08
[ 47 ]
Final list of participants - Working Party 1B (Geneva, 5-8 November 2024) � Director, BR 2024-11-08
[ 46 ]
List of documents issued (Documents 1B/33 - 1B/46) � BR, Study Groups Department 2024-11-04
[ 45 ]
Spectrum utilization efficiency data collection (Information document) � Brazil Q241/1 2024-10-24
[ 44 ]
Spectrum grid for determining spectrum availability and economy � Indonesia 2024-10-23
[ 43 ]
Proposed revision of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands � Japan 2024-10-22
[ 42 ]
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports � Korea (Rep. of) 2024-10-22
[ 41 ]
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents � Korea (Rep. of) 2024-10-22
[ 40 ]
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Rep. of) Q241/1 2024-10-22
[ 39 ]
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems � Korea (Rep. of) 2024-10-22
[ 38 ]
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range devices � United States 2024-10-21
[ 37 ]
(Rev.1)
Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management � China 2024-10-21
[ 36 ]
Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] � China 2024-10-21
[ 35 ]
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators � ITU-T SG3 2024-07-19
[ 34 ]
Information on the preparation of texts for the draft CPM Report to WRC-27 � Chair, CPM-27 2024-07-09
[ 33 ]
+Ann.1-10
Report on the first 2023-2027 meeting of Working Party 1B (Geneva, 12-19 June 2024) � Chair, WP 1B 2024-06-18
[ 32 ]
Final list of participants - Working Party 1B (Geneva, 12-19 June 2024) � Director, BR 2024-06-18
[ 31 ]
List of documents issued (Documents 1B/1 - 1B/31) � BR, Study Groups Department 2024-06-12
[ 30 ]
Consideration of Document 1B/22 by Working Party 1A - Preliminary draft new Question ITU-R [UWB]/1 � Acting Chairs, WPs 1A and 1B 2024-06-12
[ 29 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 3J AI1.15 2024-06-12
[ 28 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C AND 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7 � WPs 3K & 3M AI1.7 2024-06-10
[ 27 ]
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16 � WPs 3J & 3M AI1.16 2024-06-10
[ 26 ]
Report of the Correspondence Group to further work on the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] � Co-Chairs, CG GPR/WPR 2024-06-05
[ 25 ]
Proposed modification to the working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management � India 2024-05-31
[ 24 ]
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices � Netherlands (Kingdom of the) 2024-05-29
[ 23 ]
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices � Netherlands (Kingdom of the) 2024-05-29
[ 22 ]
Preliminary draft new Question ITU-R [UWB]/1 � Germany , Austria , Finland , Hungary , Latvia , Netherlands (Kingdom of the) , Romania , Switzerland 2024-05-29
[ 21 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15 � WP 5C AI1.15 2024-05-29
[ 20 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7 � WP 5C AI1.7 2024-05-29
[ 19 ]
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Rep. of) Q241/1 2024-05-29
[ 18 ]
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7 � WP 5B AI1.7 2024-05-28
[ 17 ]
Editorial revision and update of Report ITU-R SM.2353 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands � United States 2024-05-24
[ 16 ]
Liaison statement on implementation of WTDC Resolution 9 (Rev. Kigali, 2022) for digital skills and human hazards - ITU-D Study Group 2 Question 5/2: Adoption of telecommunications/ICTs and improving digital skills - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields � ITU-D SG2 2024-05-24
[ 15 ]
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management � China 2024-05-23
[ 14 ]
Liaison statement to Working Party 4C (copy to Working Party 1B for information) - Relevant technical and operational information to support studies under WRC-27 agenda item 1.5 � WP 4A AI1.5 2024-05-14
[ 13 ]
Liaison statement to ITU-R Working Party 1B on mutual activities - Economic aspects of telecommunication/ICTs � ITU-D SG1 Q4/1 2024-05-07
[ 12 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chair, CCV 2024-04-22
[ 11 ]
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16 � WP 7D AI1.16 2024-03-28
[ 10 ]
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18 � WP 7D AI1.18, AI1.16 2024-03-28
[ 9 ]
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-03-27
[ 8 ]
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7 � WP 7B AI1.7 2024-03-27
[ 7 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7 � WP 7C AI1.7 2024-03-25
[ 6 ]
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-03-18
[ 5 ]
Preliminary position on WRC-27 agenda � WMO 2024-03-06
[ 4 ]
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7 � WP 5D AI1.7 2024-02-13
Results:53 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-12-19