Contributions�� |
�
|
Number�
|
Title
|
Source
|
Date
|
|
[ 59 ]
�
� |
Summary record of the twenty second meeting of Study Group 5 (Geneva, 2-3 December 2024)
�
� |
Chair, SG 5
� |
2024-12-03 |
|
[ 58 ]
�
� |
Final list of participants Study Group 5 (Geneva, 2-3 December 2024)
�
� |
Director, BR
� |
2024-12-03 |
|
[ 57 ]
�
� |
List of documents issued (Documents 5/26 - 5/57)
�
� |
BR, Study Groups Department
� |
2024-12-02 |
|
[ 56 ]
�
(Rev.1)� |
Executive Report from Working Party 5C
�
� |
Acting Chair, WP 5C
� |
2024-11-29 |
|
[ 55 ]
�
(Rev.1)� |
Executive Report from Working Party 5B
�
� |
Acting Chair, WP 5B
� |
2024-11-29 |
|
[ 54 ]
�
(Rev.1)� |
Executive Report from Working Party 5A
�
� |
Acting Chair, WP 5A
� |
2024-11-29 |
|
[ 53 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R M.1041-2 - Future amateur radio systems
�
� |
WP 5A
� |
2024-11-29 |
|
[ 52 ]
�
� |
Draft revision of Report ITU-R M.2442-0 - Current and future usage of railway radiocommunication systems between train and trackside
�
� |
WP 5A
� |
2024-11-29 |
|
[ 51 ]
�
� |
Draft new Report ITU-R M.[LMS.BANDWIDTH.275-450GHZ] - Bandwidth considerations for land mobile service applications in the frequency range 275-450 GHz
�
� |
WP 5A
� |
2024-11-29 |
|
[ 50 ]
�
� |
Structure and activities of Study Group 5
�
� |
Canada
� |
2024-11-20 |
|
[ 49 ]
�
� |
Executive Report from Working Party 5D
�
� |
Acting Chair, WP 5D
� |
2024-11-14 |
|
[ 48 ]
�
� |
Study Group 5 Vice-Chair function
�
� |
Chair, SG 5
� |
2024-11-12 |
|
[ 47 ]
�
� |
Structure of Study Group 5, Terms of Reference of the Working Parties, and approval of revision to Recommendation ITU-R M.1036-7
�
� |
Brazil
� |
2024-11-09 |
|
[ 46 ]
�
� |
Proposal with regard to the Annex 2 of Document 5/26 - Structure of ITU-R Study Group 5
�
� |
Russian Federation
� |
2024-11-05 |
|
[ 45 ]
�
(Rev.2)� |
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.MS] - Unwanted emission characteristics of mobile stations using the terrestrial radio interface of IMT-2020
�
� |
WP 5D
� |
2024-10-29 |
|
[ 44 ]
�
(Rev.3)� |
Draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] - Unwanted emission characteristics of base stations using the terrestrial radio interface of IMT-2020
�
� |
WP 5D
� |
2024-10-29 |
|
[ 43 ]
�
� |
Reply liaison statement to Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
�
� |
WP 7B
� |
2024-10-09 |
|
[ 42 ]
�
� |
Liaison statement on the establishment of the Working Group 2 on vehicular communications for advanced emergency braking, including to protect VRUs
�
� |
CITS
EG-ComAD
� |
2024-09-18 |
|
[ 41 ]
�
� |
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
2024-07-19 |
|
[ 40 ]
�
� |
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan
�
� |
ITU-T SG15
� |
2024-07-19 |
|
[ 39 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
2024-07-09 |
|
[ 38 ]
�
� |
Draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
�
� |
WP 5D
� |
2024-07-05 |
|
[ 37 ]
�
� |
Liaison statement on overview of work of FG-AI4A
�
� |
FG-AI4A
� |
2024-07-03 |
|
[ 36 ]
�
� |
Liaison statement on completion of FG-AI4A deliverables
�
� |
FG-AI4A
� |
2024-07-03 |
|
[ 35 ]
�
� |
Liaison statement on results of the seventh and final meeting of the FG-MV
�
� |
ITU-T FG-MV
� |
2024-06-24 |
|
[ 34 ]
�
� |
Liaison statement on the establishment of the working group on requirements for merging automatically into congested lanes
�
� |
CITS EG-ComAD
� |
2024-06-10 |
|
[ 33 ]
�
(Rev.1)� |
Draft revision of Report ITU-R F.2416-0 - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz
�
� |
WP 5C
� |
|
|
[ 32 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R F.758-7 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
�
� |
WP 5C
� |
2024-05-29 |
|
[ 31 ]
�
� |
Draft new Report ITU-R M.[NON-SAFETY AM(OR)S CHARACTERISTICS AND SHARING STUDIES]
�
� |
WP 5B
� |
2024-05-23 |
|
[ 30 ]
�
� |
Draft new Question ITU-R [DIGITAL VOICE]/5 - Introduction of Digital Voice Communications in the VHF maritime frequency channels
�
� |
WP 5B
� |
2024-05-23 |
|
[ 29 ]
�
� |
Reply liaison statement on the consent of draft Recommendation ITU-T Q.5032 (ex. Q.NCRP) - Network coding protocol for network repeaters
�
� |
ITU-T SG11
� |
2024-05-22 |
|
[ 28 ]
�
� |
Note from Working Party 5B to Study Group 5
�
� |
WP 5B
� |
2024-05-20 |
|
[ 27 ]
�
(Rev.1)� |
Draft new Question ITU-R [R-MODE]/5 - Coexistence of VHF data exchange system with a ranging-mode
in the VHF data exchange system
�
� |
WP 5B
� |
2024-05-20 |
|
[ 26 ]
�
(Rev.1)� |
Summary record of the twenty-first meeting of Study Group 5 (Geneva, 13 May 2024)
�
� |
Chair, SG 5
� |
2024-05-13 |
|
[ 25 ]
�
� |
Final list of participants Study Group 5 (Geneva, 13 May 2024)
�
� |
Director, BR
� |
2024-05-13 |
|
[ 24 ]
�
� |
List of documents issued (Documents 5/1 - 5/24)
�
� |
BR, Study Groups Department
� |
2024-05-10 |
|
[ 23 ]
�
� |
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and
Resolution ITU-R 74
�
� |
SG 4
� |
2024-05-10 |
|
[ 22 ]
�
� |
Proposed organization of the work of Study Group 5
�
� |
Chair, SG 5
� |
2024-05-10 |
|
[ 21 ]
�
� |
Liaison statement on results of the sixth meeting of the FG-MV
�
� |
ITU-T FG-MV
� |
2024-05-06 |
|
[ 20 ]
�
� |
Executive Report from Working Party 5D
�
� |
Acting Chair, WP 5D
� |
2024-05-01 |
|
[ 19 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
2024-04-22 |
|
[ 18 ]
�
� |
Liaison statement on definition of CitiVerse
�
� |
ITU-T FG-MV
� |
2024-04-18 |
|
[ 17 ]
�
� |
Liaison statement on initiation of the draft new technical Report ITU-T TR.URCN-REQ - Service requirements of ubiquitous real time communication network for future networks
�
� |
ITU-T SG13
� |
2024-04-09 |
|
[ 16 ]
�
� |
Liaison statement on results of the fifth meeting of the FG-MV
�
� |
ITU-T FG-MV
� |
2024-04-02 |
|
[ 15 ]
�
� |
Liaison statement on vocabulary for metaverse
�
� |
ITU-T FG-MV
� |
2024-03-27 |
|
[ 14 ]
�
� |
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002
�
� |
ETSI
� |
2024-03-27 |
|
[ 13 ]
�
(Rev.1)� |
Draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz
�
� |
WP 5D
� |
2024-02-14 |
|
[ 12 ]
�
� |
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
�
� |
Director, BR
� |
2024-01-30 |
|
[ 11 ]
�
(Rev.1)� |
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV
�
� |
Director, BR
� |
2024-01-26 |
|
[ 10 ]
�
� |
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz
�
� |
Chairs, SGs 1, 5 & 7
� |
2024-01-22 |
Results:59 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):