Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 18 ]
�
� |
Summary record of the meeting of Study Group 3 (Geneva, 17 June 2024)
�
� |
Chair, SG 3
� |
� |
2024-06-18 |
|
[ 17 ]
�
� |
Final list of participants - Study Group 3 (Geneva, 17 June 2024)
�
� |
Director, BR
� |
� |
2024-06-18 |
|
[ 16 ]
�
� |
Proposed organization of the work of Study Group 3
�
� |
Chair, SG 3
� |
� |
2024-06-14 |
|
[ 15 ]
�
� |
Executive Report to Study Group 3
�
� |
Acting Chair, WP 3L
� |
� |
2024-06-14 |
|
[ 14 ]
�
� |
Executive Report to Study Group 3
�
� |
Acting Chair, WP 3K
� |
� |
2024-06-14 |
|
[ 13 ]
�
(Rev.1)� |
Executive Report to Study Group 3
�
� |
Acting Chair, WP 3J
� |
� |
2024-06-12 |
|
[ 12 ]
�
� |
Executive Report to Study Group 3
�
� |
Acting Chair, WP 3M
� |
� |
2024-06-12 |
|
[ 11 ]
�
� |
Draft revision of Recommendation ITU-R P.835-6 - Reference standard atmospheres
�
� |
WP 3J
� |
� |
2024-06-12 |
|
[ 10 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R P.1511-2 - Topography for Earth-space propagation modelling
�
� |
WP 3J
� |
Q202/3
� |
2024-06-12 |
|
[ 9 ]
�
� |
Draft editorial amendment of Recommendation ITU-R P.676-13 - Gaseous attenuation and related effects
�
� |
WP 3J
� |
� |
2024-06-12 |
|
[ 8 ]
�
� |
Draft revision of Recommendation ITU-R P.525-4 - Calculation of free-space attenuation
�
� |
WP 3J
� |
� |
2024-06-12 |
|
[ 7 ]
�
� |
Draft editorial amendment to Recommendation ITU-R P.618-14 - Propagation data and prediction methods required for the design of Earth-space telecommunication systems
�
� |
WP 3M
� |
� |
2024-06-12 |
|
[ 6 ]
�
� |
Draft editorial amendment to Recommendation ITU-R P.1622-1 - Prediction methods required for the design of Earth-space systems operating between 20 THz and 375 THz
�
� |
WP 3M
� |
� |
2024-06-12 |
|
[ 5 ]
�
� |
Draft revision of Recommendation ITU-R P.372 - Radio Noise
�
� |
WP 3L
� |
� |
2024-06-12 |
|
[ 4 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
� |
2024-04-22 |
|
[ 3 ]
�
(Rev.1)� |
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV
�
� |
Director, BR
� |
� |
2024-01-26 |
|
[ 2 ]
�
� |
Documents to be carried over from the 2019-2023 Study Period
�
� |
SG 3
� |
� |
2023-11-22 |
|
[ 1 ]
�
(Rev.1)� |
Assignment of texts to the Study Group 3 Sub-Groups
�
� |
Chair, SG 3
� |
� |
2023-11-22 |
Results:18 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):