Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 76 ]
�
+Ann.1� |
Report of the meeting of Working Party 7A (S�vres, France, 26-30 June 2023)
�
� |
Chairman, WP 7A
� |
� |
2023-06-29 |
|
[ 75 ]
�
� |
Final list of participants - Working Party 7A (S�vres, France, 26-30 June 2023)
�
� |
Director, BR
� |
� |
2023-06-29 |
|
[ 74 ]
�
� |
List of documents issued ((Documents 7A/64 - 7A/74)
�
� |
BR, Study Groups Department
� |
� |
2023-06-26 |
|
[ 73 ]
�
� |
Report on activities since September 2022
�
� |
Chairman, CG-stfs-cispr
� |
� |
2023-06-19 |
|
[ 72 ]
�
� |
Information on the resolutions adopted by the General Conference on Weights and Measures in November 2022 and follow on of the activities
�
� |
BIPM
� |
� |
2023-06-19 |
|
[ 71 ]
�
� |
Regarding assessment of the status of Questions assigned to Working Party 7A
�
� |
United States of America
� |
� |
2023-06-19 |
|
[ 70 ]
�
� |
Proposed additions to the Note to the Director of the Radiocommunication Bureau
�
� |
France
� |
� |
2023-06-16 |
|
[ 69 ]
�
� |
Revising Recommendation ITU-R V.431-8 - Nomenclature of the frequency and wavelength bands used in telecommunications
�
� |
ATDI
� |
� |
2023-06-14 |
|
[ 68 ]
�
� |
Proposed revision of Question ITU-R 236-2/7 - The future of the UTC time scale
�
� |
Germany (Federal Republic of)
� |
� |
2023-06-14 |
|
[ 67 ]
�
� |
Liaison statement to Working Party 7A - Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2023-06-13 |
|
[ 66 ]
�
� |
Reply liaison statement to CCT (copy to Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Revising Recommendation ITU-R V.431-8
�
� |
WP 5A
� |
� |
2023-05-18 |
|
[ 65 ]
�
� |
Liaison statement to ITU-R Working Parties - Revising Recommendation ITU-R V.431-8
�
� |
CCT
� |
� |
2023-05-17 |
|
[ 64 ]
�
+Ann.1-4� |
Report of the meeting of Working Party 7A (Geneva, 29 September - 6 October 2022)
�
� |
Chairman, WP 7A
� |
� |
2022-10-06 |
|
[ 63 ]
�
� |
Final list of participants Working Party 7A (Geneva, 29 Sept. - 6 Oct. 2022)
�
� |
Director, BR
� |
� |
2022-10-06 |
|
[ 62 ]
�
� |
List of documents issued (Documents 7A/51 - 7A/62)
�
� |
BR, Study Groups Department
� |
� |
2022-09-29 |
|
[ 61 ]
�
� |
Note to the Director of the Radiocommunication Bureau
�
� |
France
,
Germany (Federal Republic of)
,
Italy
� |
� |
2022-09-22 |
|
[ 60 ]
�
� |
Proposals to a preliminary draft new Report ITU-R TF.[UTC]
�
� |
Russian Federation
� |
� |
2022-09-22 |
|
[ 59 ]
�
� |
Proposals to a preliminary draft Note to the Director of the BR
�
� |
Russian Federation
� |
� |
2022-09-22 |
|
[ 58 ]
�
� |
Report on the CPM-23 Chapter 3 - Issues (and Chapter 5 - Science topics)
�
� |
CPM-23 Rapporteur, Chapter 3 issues
� |
� |
2022-09-21 |
|
[ 57 ]
�
� |
Comments on reply liaison statement from Working Party 1A - Protection of the SFTS from WPT-EV - Comments on Recommendation ITU-R SM.2110-1 and Report ITU-R SM.2451-1
�
� |
Japan
� |
� |
2022-09-20 |
|
[ 56 ]
�
� |
Proposed update to preliminary draft Note to the Director of the Radiocommunication Bureau and preliminary draft new Report ITU-R TF.[UTC]
�
� |
Japan
� |
� |
2022-09-20 |
|
[ 55 ]
�
� |
Proposed revisions to preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication
�
� |
France
� |
� |
2022-09-19 |
|
[ 54 ]
�
� |
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 7A, 7C and 5D for information) - Re: Beam wireless power transmission
�
� |
WP 4A
� |
� |
2022-09-15 |
|
[ 53 ]
�
� |
Reply liaison statement to Working Party 7A on protection of the SFTS from WPT-EV - Comments on Recommendation ITU-R SM.2110-1 and draft revision of Report ITU-R SM.2451-0
�
� |
WP 1A
� |
� |
2022-07-20 |
|
[ 52 ]
�
� |
Liaison statement to Working Parties 5A, 5B, 5C and 7A (copy to Working Party 6A for information) - Preliminary draft revision of Report ITU-R SM.2449-0
�
� |
WP 1A
� |
� |
2022-07-11 |
|
[ 51 ]
�
+Ann.04(Rev.1)� |
Report of the meeting of Working Party 7A (Geneva, 2-6 May 2022)
�
� |
Chairman, WP 7A
� |
� |
2022-05-06 |
|
[ 50 ]
�
� |
Final list of participants - Working Party 7A (Geneva, 2-6 May 2022)
�
� |
Director, BR
� |
� |
2022-05-06 |
|
[ 49 ]
�
� |
List of documents issued (Documents 7A/31 - 7A/49)
�
� |
BR, Study Groups Department
� |
� |
2022-05-02 |
|
[ 48 ]
�
� |
Proposal for revision of Recommendation ITU-R TF.768-7 and Recommendation ITU-R TF.583-6
�
� |
Russian Federation
� |
� |
2022-04-22 |
|
[ 47 ]
�
� |
[Proposed] Note to the Director of the BR - Resolution 655 (WRC-15)
�
� |
France
,
Germany (Federal Republic of)
,
Italy
,
Switzerland (Confederation of)
� |
� |
2022-04-25 |
|
[ 46 ]
�
� |
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems
�
� |
France
� |
� |
2022-04-22 |
|
[ 45 ]
�
� |
Proposed revision to working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
France
� |
� |
2022-04-22 |
|
[ 44 ]
�
� |
Proposals to working document towards a preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication
�
� |
Russian Federation
� |
� |
2022-04-25 |
|
[ 43 ]
�
� |
Information on the activities related to time and frequency metrology in preparation to the General Conference on Weights and Measures 2022
�
� |
International Bureau of Weights and Measures
� |
� |
2022-04-21 |
|
[ 42 ]
�
� |
Proposal for the draft revision of the Handbook selection and use of precise frequency and time systems
�
� |
Germany (Federal Republic of)
� |
� |
2022-04-19 |
|
[ 41 ]
�
� |
Working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
Canada
� |
� |
2022-04-19 |
|
[ 40 ]
�
� |
Comments on reply liaison statement from Working Party 1A - Protection of the SFTS from WPT-EV - Approved Report ITU-R TF.2487 on SFTS protection criteria and revision of Recommendation ITU-R SM.2110
�
� |
Japan
� |
� |
2022-04-19 |
|
[ 39 ]
�
� |
Proposed updates to working document towards a preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication
�
� |
Japan
� |
� |
2022-04-19 |
|
[ 38 ]
�
� |
Liaison statement on use of continuous timescales in Telecom applications
�
� |
ITU-T SG 15
� |
� |
2021-12-23 |
|
[ 37 ]
�
� |
GASS 2021: Recent URSI Resolutions and Recommendation
�
� |
Director, BR
� |
� |
2021-12-16 |
|
[ 36 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5D, 7A and 7B for information) - Request for information for use in impact studies for EESS (passive) operations in the 6 425-7 250 MHz range under RR No. 5.458
�
� |
WP 5C
� |
� |
2021-12-03 |
|
[ 35 ]
�
� |
Reply liaison statement to Working Party 7A - Protection of the SFTS from WPT-EV - Approved ITU-R Report on SFTS protection criteria and revision of Recommendation ITU-R SM.2110
�
� |
WP 1A
� |
� |
2021-11-23 |
|
[ 34 ]
�
� |
Liaison statement to Working Parties 5A, 5B, 5C and 7A (copy to Working Party 6A for information) - Working document towards a preliminary draft revision of Report ITU-R SM.2449-0
�
� |
WP 1A
� |
� |
2021-11-15 |
|
[ 33 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C, 5D, 7A, and 7B - Request for information for use in impact studies for EESS (passive) operations in the 6 425-7 250 MHz range under RR No. 5.458
�
� |
WP 7C
� |
� |
2021-09-28 |
|
[ 32 ]
�
� |
Reply liaison statement to Working Party 7A - Working document towards a draft new Report ITU-R TF.[UTC]
�
� |
WP 7D
� |
� |
2021-09-24 |
|
[ 31 ]
�
+Ann.01(Rev.1)� |
Report of the meeting of Working Party 7A (8-15 September 2021, e-Meeting)
�
� |
Chairman, WP 7A
� |
� |
2021-09-15 |
|
[ 30 ]
�
� |
Final List of Participants - Working Party 7A (8-15 September 2021, e-Meeting)
�
� |
Director, BR
� |
� |
2021-09-15 |
|
[ 29 ]
�
� |
List of documents issued (Documents 7A/25 - 7A/29)
�
� |
BR Study Groups Department
� |
� |
2021-09-07 |
|
[ 28 ]
�
� |
Proposed addition to working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
Poland (Republic of)
� |
� |
2021-09-01 |
|
[ 27 ]
�
� |
Proposals to working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
Germany (Federal Republic of)
� |
� |
2021-08-30 |
Results:76 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):