Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 486 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-R WP5A, WP5D and 6A (Disaster relief liaison rapporteur) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
�
� |
ITU-D SG1 - Q3/1
� |
� |
2023-11-06 |
|
[ 485 ]
�
� |
Reply liaison statement to CCT (copy for information to Study Group 6 and Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7C)
�
� |
WP 7D
� |
� |
2023-10-19 |
|
[ 484 ]
�
+Ch.1-5� |
Report of the meeting of Working Party 6A (Geneva, 30 August - 6 September 2023)
�
� |
Chairman, WP 6A
� |
� |
2023-09-06 |
|
[ 483 ]
�
� |
Final list of participants WP 6A, Geneva, 30 August - 6 September 2023
�
� |
Director BR
� |
� |
2023-09-06 |
|
[ 482 ]
�
� |
Liaison statement to Working Parties 6A and 6B - Proposed revisions of Resolutions ITU-R 60-2 and ITU-R 62-2
�
� |
WP 6C
� |
� |
2023-09-04 |
|
[ 481 ]
�
� |
Liaison statement to Working Parties 6A and 6B - Final Report of the Rapporteur Artificial intelligence systems for programme production and exchange
�
� |
WP 6C
� |
� |
2023-08-30 |
|
[ 480 ]
�
(Rev.2)� |
List of documents issued ((Documents 6A/417 - 6A/482)
�
� |
BR, Study Groups Department
� |
� |
2023-08-30 |
|
[ 479 ]
�
� |
Developments on WPT issues
�
� |
RG on WPT Issues
� |
� |
2023-08-23 |
|
[ 478 ]
�
� |
Modernization of digital terrestrial television broadcasting in France - (Information Document)
�
� |
France
� |
� |
2023-08-23 |
|
[ 477 ]
�
� |
Proposed revision of Recommendation ITU-R BT.1774-2 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief
�
� |
Qualcomm, Inc.
� |
� |
2023-08-23 |
|
[ 476 ]
�
� |
Recent developments on EMC-Related related matters
�
� |
WP 6A Rapp. on PLT and General EMC
� |
� |
2023-08-23 |
|
[ 475 ]
�
� |
Proposed revision to preliminary draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Collection of field trials of terrestrial multimedia mobile broadcasting systems
�
� |
European Broadcasting Union
,
Broadcast Networks Europe
� |
� |
2023-08-22 |
|
[ 474 ]
�
� |
Proposed revision to working document towards a preliminary draft new Report ITU-R BT.[IMPLEMENT TMMB SYSTEM-L] - Terrestrial multimedia mobile broadcasting: Planning and implementation of System-L networks
�
� |
European Broadcasting Union
,
Broadcast Networks Europe
� |
� |
2023-08-22 |
|
[ 473 ]
�
� |
Report on activities between February 2023 and August 2023
�
� |
RG on ATSC 3.0
� |
� |
2023-08-21 |
|
[ 472 ]
�
� |
[Working document towards a] preliminary draft revision of Recommendation ITU-R BT.1774-2 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief
�
� |
RG on ATSC 3.0
� |
� |
2023-08-21 |
|
[ 471 ]
�
� |
Revision of Report ITU-R BT.2383-4 - Typical frequency sharing characteristics for digital terrestrial television broadcasting systems in the frequency band 470-862 MHz
�
� |
Broadcast Networks Europe
� |
� |
2023-08-21 |
|
[ 470 ]
�
� |
Report for Working Party 6A block meeting of August/September 2023
�
� |
RG on SAB/SAP Issues
� |
� |
2023-08-21 |
|
[ 469 ]
�
� |
Proposed reply liaison statement from Working Party 6A to Working Party 1A - Preliminary draft revision to Report ITU-R SM.2449-0
�
� |
China (People's Republic of)
� |
� |
2023-08-18 |
|
[ 468 ]
�
� |
Working document towards a preliminary draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - The Test Report of the Wireless Digital Multimedia Broadcasting Network
�
� |
China (People's Republic of)
� |
� |
2023-08-18 |
|
[ 467 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R BT.2343-8 - Field trial of DTMB-A+5G 8K UHD Integrated Transmission System
�
� |
China (People's Republic of)
� |
� |
2023-08-18 |
|
[ 466 ]
�
� |
Working document towards a draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Laboratory testing of 5G NR systems in the 700 MHz band
�
� |
China (People's Republic of)
� |
� |
2023-08-18 |
|
[ 465 ]
�
� |
Working document towards a draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - HPHT and LPLT 5G NR MBS cooperative networking test
�
� |
China (People's Republic of)
� |
� |
2023-08-18 |
|
[ 464 ]
�
� |
Proposal to progress the working document towards a preliminary draft new Report ITU-R BT.[ITCN] - Inter-Tower Communications Network (ITCN) for Terrestrial Broadcasting and Datacasting Systems (New section 6)
�
� |
Canada
� |
� |
2023-08-17 |
|
[ 463 ]
�
� |
Proposal to progress the working document towards a preliminary draft new Report ITU-R BT.[ITCN] - Inter-Tower Communications Network (ITCN) for Terrestrial Broadcasting and Datacasting Systems (New section 4)
�
� |
Canada
� |
� |
2023-08-17 |
|
[ 462 ]
�
� |
Rapporteur Group - Future of Broadcasting progress Report - March to August 2023
�
� |
RG-FOB
� |
� |
2023-08-18 |
|
[ 461 ]
�
� |
Preliminary draft revision to Report ITU-R BT.2386-4 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN) (New Annex B to Part 2)
�
� |
Korea (Republic of)
,
United States of America
� |
� |
2023-08-17 |
|
[ 460 ]
�
� |
Preliminary draft revision to Report ITU-R BT.2386-4 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN) (New Annex A to Part 2)
�
� |
Korea (Republic of)
,
United States of America
� |
� |
2023-08-17 |
|
[ 459 ]
�
� |
Proposal on a working document towards a preliminary draft new Report ITU-R BT.[ANALYSIS OF ATSC 3.0 AND 3GPP] - Analysis of ATSC 3.0 and 3GPP Rel-17 5G broadcasting systems
for mobile handheld applications
�
� |
Korea (Republic of)
,
United States of America
� |
� |
2023-08-17 |
|
[ 458 ]
�
� |
Report of activities in the Rapporteur Group
�
� |
RG on WRC-23 AI 1.5
� |
AI1.5
� |
2023-08-16 |
|
[ 457 ]
�
� |
Report of the work of the Correspondence Group on CISPR radio services database
�
� |
Chairman, CG on CISPR radio services database
� |
� |
2023-08-15 |
|
[ 456 ]
�
� |
Proposed reply liaison statement from Working Party 6A to CISPR/H
�
� |
CG on CISPR radio services database
� |
� |
2023-08-15 |
|
[ 455 ]
�
� |
Proposed updates to Resolutions ITU-R 55-3, ITU-R 60-2 and ITU-R 62-2
�
� |
Italy
,
Vatican City State
� |
� |
2023-08-10 |
|
[ 454 ]
�
� |
Proposed revisions of Questions ITU-R 120/6 and ITU-R 136-2/6
�
� |
Italy
,
Vatican City State
� |
� |
2023-08-10 |
|
[ 453 ]
�
� |
Proposed treatment of ITU-R Recommendations and Reports on large-screen digital imagery (LSDI)
�
� |
Japan
� |
� |
2023-08-09 |
|
[ 452 ]
�
� |
Proposed revision of Report ITU-R BT.2389-0 - Guidelines on measurements for digital terrestrial television broadcasting systems
�
� |
Japan
� |
� |
2023-08-09 |
|
[ 451 ]
�
� |
Response to liaison statement from Working Party 1A on WPT
�
� |
Germany (Federal Republic of)
� |
� |
2023-08-08 |
|
[ 450 ]
�
� |
Update to Working Party 6A (August-September 2023)
�
� |
Chairman, RG on RF Hazard
� |
� |
2023-08-07 |
|
[ 449 ]
�
� |
Proposal for the establishment of a Rapporteur Group to progress the revision of the Handbook on HF broadcasting system design
�
� |
British Broadcasting Corporation (BBC)
� |
� |
2023-07-31 |
|
[ 448 ]
�
� |
Preliminary draft revision of ITU-R Handbook - HF broadcasting system design
�
� |
HFCC-International Broadcasting Delivery
� |
� |
2023-07-28 |
|
[ 447 ]
�
� |
Proposals for ITU-R Recommendations and Reports concerning the DRM Digital Radio Standard
�
� |
Digital Radio Mondiale
� |
� |
2023-07-28 |
|
[ 446 ]
�
� |
Brazilian next-generation Digital Terrestrial Television (information document)
�
� |
Brazil (Federative Republic of)
� |
� |
2023-07-27 |
|
[ 445 ]
�
� |
Proposal to combine Working Party 6A Rapporteur on Wireless Power Transmission (WPT) issues and Working Party 6A Rapporteur on Power Line Telecommunication (PLT) and General EMC-Related Potential Interference Issues
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2023-07-27 |
|
[ 444 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R BT.2467-2 - Methods for the evaluation of the quality of service of second generation DTTB systems
�
� |
Rai Way S.p.A.
� |
� |
2023-07-26 |
|
[ 443 ]
�
� |
Liaison statement on collaboration matters related to EMF
�
� |
ITU-T SG5
� |
� |
2023-07-19 |
|
[ 442 ]
�
� |
Editorial amendment to Recommendation ITU-R BS.1698-1 - Evaluating electromagnetic fields from terrestrial broadcasting transmitting systems to assess human exposure to
non-ionizing emissions
�
� |
RAI - Radiotelevisione Italiana
� |
� |
2023-07-17 |
|
[ 441 ]
�
� |
Reply liaison statement to Working Parties 5A, 5C and 6A (copy to CCT) - Proposed definition of programme making and special events (PMSE)
�
� |
WP 5D
� |
� |
2023-07-03 |
|
[ 440 ]
�
� |
Liaison statement to ITU-R Working Parties 5A, 5C and 6A, ITU-D Study Group 2 and ITU-T Study Group 20 - Draft new Report ITU-R M.[IMT.APPLICATIONS] - Applications of the terrestrial component of IMT for specific societal, industrial and other usages
�
� |
WP 5D
� |
� |
2023-07-03 |
|
[ 439 ]
�
� |
Liaison statement to Working Parties 6A, 6B and 6C (copy to ITU-T SG 16) - New Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications
�
� |
WP 5D
� |
� |
2023-07-03 |
|
[ 438 ]
�
� |
Reply liaison statement on draft ITU-T Technical Report TR.WIFITV - Secondary distribution of digital television and audiovisual content to portable devices using the wireless local area network
�
� |
ITU-T SG9
� |
� |
2023-06-15 |
|
[ 437 ]
�
� |
Liaison statement on AAP consent of draft new Recommendation ITU-T J.CABLE-5G-REQ - Requirements for cable television services to use 5G radio system
�
� |
ITU-T SG9
� |
� |
2023-06-15 |
Results:485 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):