Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1796 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-R WP5A, WP5D and 6A (Disaster relief liaison rapporteur) - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
�
� |
ITU-D SG1 - Q3/1
� |
� |
2023-11-06 |
|
[ 1795 ]
�
� |
Liaison statement on request to provide the standardization status for metaverse-related technologies
�
� |
ITU-T FG-MV
� |
� |
2023-10-19 |
|
[ 1794 ]
�
� |
Reply liaison statement to CCT (copy for information to Study Group 6 and Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7C)
�
� |
WP 7D
� |
� |
2023-10-19 |
|
[ 1793 ]
�
� |
Liaison statement on definition of metaverse
�
� |
ITU-T FG-MV
� |
� |
2023-10-19 |
|
[ 1792 ]
�
� |
Liaison statement on request to provide the standardization status for metaverse cross-platform interoperability
�
� |
ITU-T FG-MV
� |
� |
2023-10-19 |
|
[ 1791 ]
�
� |
Reply liaison statement to Working Party 5D - Update to preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
�
� |
N/A
� |
� |
2023-10-19 |
|
[ 1790 ]
�
� |
Reply liaison statement to Working Party 1A - (Copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 7D
� |
� |
2023-10-17 |
|
[ 1789 ]
�
� |
Liaison statement to ITU-R Study Groups 4 and 5, and ITU-T Study Groups 9, 12, 16 and 20, and ITU-D Study Group 1 and to Academia Members of the ITU and Regional, International and External Organizations - New ITU-R Report introducing a framework for the future of broadcasting
�
� |
ITU-R SG 6
� |
� |
2023-10-10 |
|
[ 1788 ]
�
� |
Reply liaison statement to Working Party 1A (Copy to Working Parties 4A, 5C, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
�
� |
WP 5A
� |
� |
2023-09-26 |
|
[ 1787 ]
�
� |
Report on disaster relief
�
� |
Disaster Relief Liaison Rapporteur
� |
� |
2023-09-18 |
|
[ 1786 ]
�
� |
Liaison statement on consent of new Recommendation ITU-T Y.3204 (ex.Y.FMSC-SC) - Fixed, mobile and satellite convergence - Service continuity for IMT-2020 networks and beyond
�
� |
ITU-T SG13
� |
� |
2023-09-12 |
|
[ 1785 ]
�
� |
Indication of intention to submit candidate technology proposal for the Revision 3 of Recommendation ITU-R M.2150
�
� |
Nufront (Beijing) Technology Co. Ltd.
� |
� |
2023-07-19 |
|
[ 1784 ]
�
� |
Liaison statement to Study Group 5 (copy to Working Party 5D) - Adjacent band compatibility studies of IMT systems in the mobile service in the band 1 492-1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
SG 4
� |
� |
2023-07-20 |
|
[ 1783 ]
�
� |
Liaison statement on collaboration matters related to EMF
�
� |
ITU-T SG5
� |
� |
2023-07-19 |
|
[ 1782 ]
�
� |
Reply liaison statement to Working Party 5D - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
�
� |
WP 4A
� |
� |
2023-07-18 |
|
[ 1781 ]
�
� |
Reply liaison statement to Working Party 1A - (Copy to Working Parties 5A, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT)
�
� |
WP 4C
� |
� |
2023-07-11 |
|
[ 1780 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (Copy to ITU-R Working Party 5D and ITU-T Study Group 17) - Regarding "Intended terms and definitions for action at ITU-T Study Group 17 meeting"
�
� |
WP 4B
� |
� |
2023-07-11 |
|
[ 1779 ]
�
� |
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT systems in the mobile service in the band 1 492-1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
WP 4C
� |
� |
2023-07-10 |
|
[ 1778 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Study Group 5 for information only) on new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND] - Framework and overall objectives of the future development of IMT for 2030 and beyond
�
� |
WP 4B
� |
� |
2023-07-10 |
|
[ 1777 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-R Working Party 5D on contribution for consideration by ITU-R
�
� |
ITU-D SG2
� |
� |
2023-06-26 |
|
[ 1776 ]
�
+Ch.1-7� |
Report on the 44th meeting of Working Party 5D (Geneva, 12-22 June 2023)
�
� |
Chairman, WP 5D
� |
� |
2023-06-23 |
|
[ 1775 ]
�
� |
List of Participants Working Party 5D (Geneva, 12-22 June 2023)
�
� |
Director BR
� |
� |
2023-06-22 |
|
[ 1774 ]
�
� |
Update on activities in ASMG
�
� |
ASMG Rapporteur
� |
� |
2023-06-21 |
|
[ 1773 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 Work Plan for frequencies above 100 GHz
�
� |
WP 3M
� |
� |
2023-06-09 |
|
[ 1772 ]
�
� |
Update on recent activities within ATU
�
� |
ITU Region 1 (ATU) Rapporteur
� |
� |
2023-06-08 |
|
[ 1771 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 5D, 7C and 7D - Beam Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
� |
2023-06-07 |
|
[ 1770 ]
�
� |
Editorial update of Recommendation ITU-R M.2012 to Revision 6 with the received transposition references
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 1769 ]
�
� |
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 6 ("Certification C")
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 1768 ]
�
� |
Editorial update of Recommendation ITU-R M.2150 to Revision 2 with the received transposition references
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 1767 ]
�
� |
Correspondence received regarding the update of Recommendation ITU-R M.2150 to Revision 2 ("Certification C")
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 1766 ]
�
� |
Updates to the draft working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] technical feasibility of IMT in bands above 100 GHz
�
� |
Wireless World Research Forum (WWRF)
� |
� |
2023-06-05 |
|
[ 1765 ]
�
� |
Proposal for update to [preliminary draft new Recommendation ITU-R M. [IMT FRAMEWORK FOR 2030 AND BEYOND]
�
� |
Wireless World Research Forum (WWRF)
� |
� |
2023-06-05 |
|
[ 1764 ]
�
(Rev.2)� |
Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] - Technical and regulatory measures to provide compatibility between IMT and MSS, with respect to MSS operations in the frequency band 1 518-1 525 MHz for administrations wishing to implement IMT in the frequency band 1 492-1 518 MHz
�
� |
Inmarsat Ltd.
� |
� |
2023-06-05 |
|
[ 1763 ]
�
� |
Proposals to the working document towards preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
�
� |
Nokia Corporation
� |
� |
2023-06-05 |
|
[ 1762 ]
�
� |
WRC-23 agenda item 1.1 - General considerations on WRC-23 agenda item 1.1 supporting material
�
� |
France
� |
� |
2023-06-05 |
|
[ 1761 ]
�
� |
Update Report on CITEL PCC.II Activities
�
� |
CITEL Rapporteur
� |
� |
2023-06-05 |
|
[ 1760 ]
�
� |
Proposed elements for inclusion in the preliminary draft new Recommendation ITU-R M.[IMT. FRAMEWORK FOR 2030 AND BEYOND]
�
� |
Nigeria (Federal Republic of)
,
South Africa (Republic of)
� |
� |
2023-06-05 |
|
[ 1759 ]
�
� |
Adjacent band compatibility between IMT IN 1 492-1 518 MHz and MSS in 1 518-1 525 MHz
�
� |
GSM Association
� |
� |
2023-06-05 |
|
[ 1758 ]
�
� |
Proposal for modifications to the preliminary draft new Recommendation ITU-R
M.[IMT.FRAMEWORK 2030 AND BEYOND]
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
Deutsche Telekom AG
,
Orange (F)
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telia Company AB
� |
� |
2023-06-05 |
|
[ 1757 ]
�
� |
Contribution to Working Party 5D draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]
�
� |
Director, BR
� |
� |
2023-06-06 |
|
[ 1756 ]
�
� |
Studies in reply to WRC-19 Document 550 on the verification of RR No. 21.5 FOR the notification of IMT stations which use an array of active elements
�
� |
GSOA
� |
� |
2023-06-05 |
|
[ 1755 ]
�
� |
Proposals on working document towards a preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 2030 AND BEYOND]
�
� |
GSOA
� |
� |
2023-06-05 |
|
[ 1754 ]
�
� |
Finalisation and upgrade of draft new Recommendation ITU-R M.[FSS_ES_IMT_ FSS_ES_IMT_26/42/47GHZ]
�
� |
GSOA
� |
� |
2023-06-05 |
|
[ 1753 ]
�
� |
Reply liaison statement to Working Party 4A - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
�
� |
GSOA
� |
� |
2023-06-05 |
|
[ 1752 ]
�
� |
Proposal on Sections 7 and 8 of preliminary draft new Report ITU-R M.[IMT.MULTIMEIDA]
�
� |
Huawei Technologies Sweden AB
� |
� |
2023-06-05 |
|
[ 1751 ]
�
� |
Proposals for preliminary draft new Report ITU-R M.[IMT. MULTIMEDIA]
�
� |
Verizon Communication Corporation
� |
� |
2023-06-05 |
|
[ 1750 ]
�
� |
Proposals for preliminary draft new Report ITU-R M.[IMT.APPLICATIONS]
�
� |
Telecom Italia S.p.A.
,
T-Mobile USA
,
Verizon Communication Corporation
� |
� |
2023-06-05 |
|
[ 1749 ]
�
� |
Reply liaison statement to Working Party 5D - Future development of P-series Recommendations to address frequencies above 100 GHz
�
� |
WPs 3J, 3K and 3M
� |
� |
2023-06-05 |
|
[ 1748 ]
�
� |
Further modifications to the preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED.UNWANT.MS]
�
� |
IAFI
� |
� |
2023-06-03 |
|
[ 1747 ]
�
� |
Further modifications to the preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED.UNWANT.BS]
�
� |
IAFI
� |
� |
2023-06-03 |
Results:1796 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):