International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions : 1361 Recently posted�-� Search Meeting Documents
[1361]� Report on the 41st meeting of Working Party 5D (Geneva, 13-24 June 2022)

Format

Size

Posted

English

Word

1842943 bytes 2022-10-07 [1361]�Chapter 7 - General matters

Word

34729 bytes 2022-07-15 [1361]�Chapter 6 - Meeting report of Ad Hoc Workplan

Word

39472 bytes 2022-07-15 [1361]�Chapter 5 - Meeting Report of Working Group Technology Aspects

Word

50447 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.1 - Meeting Report of Sub-Working Group IMT Specifications

Word

60155 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.2 - Meeting Report of Sub-Working Group Evaluation

Word

36068 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.3 - Structure of working document towards PDNR ITU-R M.TTTT - The outcome of the evaluation, consensus building and decision of the IMT-2020 process (Steps 4 to 7) on the new submission for 'after year 2021', including characteristics of IMT-2020 radio interfaces

Word

33813 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.4 - (Template) Summary of Step 4 of the IMT-2020 Process for Evaluation of IMT-2020 Candidate Technology submissions IMT-2020/76

Word

32113 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.5 - Template of IMT-2020/k (for 'after year 2021') - Evaluation report received from [Name of IEG] on the new candidate IMT-2020 Radio Interface Technology proposal for 'after year 2021'

Word

34590 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.6 - Template of IMT-2020/ZZZ (for 'after year 2021') - Evaluation by [Name of Independent Evaluation Group (IEG)] of IMT-2020 candidate technology submission in Document(s) IMT-2020/76

Word

39410 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.7 - Meeting Report of Sub-Working Group Radio aspects

Word

2592564 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.8 - Preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE] - Terrestrial IMT for remote sparsely populated areas providing high data rate coverage

Word

42063732 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.9 - Draft working document towards a preliminary draft new Report ITU-R M.[IMT.Above 100 GHz] - Technical feasibility of IMT in bands above 100 GHz

Word

33749 bytes 2022-07-15 [1361]�Chapter 5 - Annex 5.10 - Meeting Report of Sub-Working Group OOBE

Word

745590 bytes 2022-07-15 [1361]�Chapter 5 - Annex 5.11 - Working document towards a preliminary draft revision of Recommendation ITU-R M.2070-1 - [U]nwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-Advanced

Word

801015 bytes 2022-07-05 [1361]�Chapter 5 - Annex 5.12 - Working document towards a preliminary draft revision of Recommendation ITU-R M.2071-1 - [Generic U]nwanted emission characteristics of mobile stations using the terrestrial radio interfaces of IMT-Advanced

Word

53619 bytes 2022-07-04 [1361]�Chapter 4 - Meeting Report of Working Group Spectrum Aspects and WRC-23 Preparations

Word

55439 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.1 - Meeting Report of Sub-Working Group Sharing Studies

Word

17359596 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.2 - Working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Measurements and mathematical modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems

Word

270645 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.3 - Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word

120018 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.4 - Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]

Word

2142604 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.5 - Working document toward a draft Note to the Director of the Radiocommunication Bureau

Word

35248 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.6 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.1

Word

69207 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.7 - Working document towards a preliminary draft CPM text for WRC-23 agenda item 1.1

Word

2912269 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.8 - Working document towards a preliminary draft new Report ITU-R M.[CONDITIONS 1.1] - Working document related to WRC-23 agenda item 1.1 - Technical and regulatory conditions for the protection of stations of the aeronautical mobile service (AMS) and maritime mobile service (MMS) located in international airspace or waters (i.e. outside national territories) and operating in the frequency band 4 800-4 990 MHz

Word

38410 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.9 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.2

Word

79281 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.10 - Working document towards Draft CPM Text on WRC-23 agenda item 1.2

Word

37320 bytes 2022-07-01 [1361]�Chapter 4 - Annex 4.11 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Main part

Word

4627764 bytes 2022-07-08 [1361]�Chapter 4 - Annex 4.12 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 1 - Sharing and compatibility of RLS and IMT operating in the frequency band 3 300-3 400 MHz

Word

3816710 bytes 2022-07-05 [1361]�Chapter 4 - Annex 4.13 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 2 - Sharing and compatibility studies of fixed-satellite service and IMT operating in the frequency band 3 600-3 800 MHz

Word

100793 bytes 2022-07-01 [1361]�Chapter 4 - Annex 4.14 - Working document on sharing and compatibility studies of IMT systems in the frequency band 3 300-3 800 MHz - Attachment 3 - Sharing and compatibility of FS and IMT operating in the frequency band 3 600- 3 800 MHz

Word

44655 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.15 - Working document on sharing and compatibility studies of IMT systems in the frequency bands 6 425-7 025 and 7 025-7 125 MHz - Main Part

Word

5287066 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.16 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 1 - Sharing and compatibility of SRS operating in the frequency band 7 145-7 190 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word

782771 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.17 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 2 - Sharing and compatibility of the SOS operating in the frequency band 7 100 7 155 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word

11574780 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.18 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 3 - Sharing and compatibility of FS and IMT operating in the frequency band 6 425-7 125 MHz

Word

26333787 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.19 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 4 - Sharing and compatibility of FSS (Earth-to-space) operating in the frequency band 6 425-7 075 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word

32176738 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.20 - Working document on sharing and compatibility studies of IMT systems in the frequency band 6 425-7 125 MHz - Attachment 5 - Sharing and compatibility of FSS (space-to-Earth) operating in the frequency band 6 700-7 075 MHz and IMT operating in the frequency band 6 425-7 125 MHz

Word

43381 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.21 - Working document on sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Main Part

Word

12209518 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.22 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 1 - Sharing and compatibility of RLS and IMT operating in the frequency band 10-10.5 GHz

Word

15858758 bytes 2022-07-15 [1361]�Chapter 4 - Annex 4.23 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 2 - Sharing and compatibility of EESS (active) operating in the frequency band 10-10.4 GHz and IMT operating in the frequency band 10-10.5 GHz

Word

17457198 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.24 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 3 - Sharing and compatibility of EESS (passive) operating in the band 10.6-10.7 GHz and IMT operating in the frequency band 10-10.5 GHz

Word

42072 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.25 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 4 - Sharing and compatibility of FS and IMT operating in the frequency band 10-10.5 GHz

Word

918931 bytes 2022-07-07 [1361]�Chapter 4 - Annex 4.26 - Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2 - Attachment 5 - Compatibility of RAS and IMT operating in the frequency band 10-10.5 GHz

Word

43749 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.27 - Meeting Report of Sub-Working Group WRC-23 agenda item 1.4

Word

137451 bytes 2022-07-05 [1361]�Chapter 4 - Annex 4.28 - Working document towards draft CPM Text on WRC-23 agenda item 1.4

Word

2232496 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.29 - Working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS] - Working document related to WRC-23 agenda item 1.4 - Spectrum needs, usage and deployment scenarios, and technical and operational characteristics for the use of high-altitude platform stations as IMT base stations (HIBS) in the mobile service in certain frequency bands below 2.7 GHz already identified for IMT

Word

48614 bytes 2022-06-30 [1361]�Chapter 4 - Annex 4.30 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) on WRC-23 agenda item 1.4

Word

199359 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.31 - Overview table and summary of the sharing and compatibility studies for WRC-23 agenda item 1.4

Word

11283548 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.32 - Annex 1 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS)in the 694-960 MHz frequency range

Word

7794294 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.33 - Annex 2 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in the 1 710-1 885 MHz frequency range

Word

4605382 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.34 - Annex 3 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in 1 885-1 980 MHz, 2 010-2 025 MHz and 2 110-2 170 MHz frequency ranges

Word

21565117 bytes 2022-07-04 [1361]�Chapter 4 - Annex 4.35 - Annex 4 - Sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in 2 500-2 690 MHz frequency range

Word

36514 bytes 2022-07-15 [1361]�Chapter 3 - Meeting Report of Working Group General Aspects

Word

40559 bytes 2022-07-04 [1361]�Chapter 3 - Annex 3.1 - Sub-Working Group Specific Applications Meeting Report

Word

8892047 bytes 2022-07-04 [1361]�Chapter 3 - Annex 3.2 - Working document towards a preliminary draft new Report ITU-R M.[IMT.INDUSTRY] - Applications of IMT for specific societal, industrial and enterprise usages

Word

78984 bytes 2022-07-15 [1361]�Chapter 3 - Annex 3.3 - Working document toward a preliminary draft new Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word

35534 bytes 2022-07-04 [1361]�Chapter 3 - Annex 3.4 - Liaison statement to ITU-R Working Parties 5A, 5C, 6A, 6B, 6C - Development of a new Report ITU-R M.[IMT.MULTIMEDIA]

Word

44672 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.5 - Meeting Report of Sub-Working Group Vision

Word

96586 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.6-Part 2

Word

48933 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.6-Part 1

Word

5027118 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.6 - Working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - IMT Vision - Framework and overall objectives of the future development of IMT for 2030 and beyond

Word

437958 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.7 - Summary of Workshop

Word

32406 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.8 - Report on the activities of Sub-Working Group RA-23 - ITU-R Resolutions, Questions and Opinions

Word

44127 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.9 - Working document towards the review of ITU-R Resolutions, Questions and Opinions

Word

40240 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.10 - Working document towards the revision of Resolution ITU-R 56

Word

36308 bytes 2022-07-05 [1361]�Chapter 3 - Annex 3.11 - Working document towards the revision of Resolution ITU-R 65

PowerPoint 2007

48355 bytes 2022-07-15 [1361]�Chapter 2-Part 1

Word

685217 bytes 2022-07-15 [1361]�Chapter 2 - ITU-R Working Party 5D structure and work plan

Word

64085 bytes 2022-07-14 [1361]�Chapter 2 - Annex 2.21 - Chairmen's contact details

Word

49301 bytes 2022-07-14 [1361]�Chapter 2 - Annex 2.22 - Meeting schedule

Word

45741 bytes 2022-07-27 [1361]�Chapter 2 - Annex 2.23 - Anticipated overall deliverables/work plan of Working Party 5D

Word

34146 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24 - "Detailed work plans" for individual deliverables

Word

34382 bytes 2022-07-14 [1361]�Chapter 2 - Annex 2.24.1 - Work plan for development of a preliminary draft new Report ITU-R M.[IMT.INDUSTRY]

Word

41871 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.2 - Detailed work plan for Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications

Word

36285 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.3 - Detailed work plan for the development of preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]

Word

33478 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.4 - Detailed work plan for revision of Recommendation ITU-R M.1036-6

Word

45065 bytes 2022-07-14 [1361]�Chapter 2 - Annex 2.24.5 - Detailed work plan on the technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz

Word

43887 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.6 - Detailed work plan for ITU-R Report on advanced antenna system (AAS) pattern for sharing studies between IMT-2020 systems and other services

Word

43683 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.7 - Detailed work plan for the studies requested by WRC-19 in Document 550

Word

42166 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.8 - Detailed work plan for methods to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz

Word

42319 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.9 - Detailed work plan on the development of technical guidance to administrations for ensuring coexistence between IMT and transmitting FSS earth stations

Word

37333 bytes 2022-07-27 [1361]�Chapter 2 - Annex 2.24.10 - Detailed work plan for Working Party 5D preparatory work for WRC-23 agenda item 1.1

Word

38095 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.11 - Detailed work plan for WRC-23 agenda item 1.2

Word

40687 bytes 2022-07-27 [1361]�Chapter 2 - Annex 2.24.12 - Detailed work plan for WRC-23 agenda item 1.4

Word

41944 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.13 - Detailed work plan for a draft "revision after year 2021" of Recommendation ITU-R M.2150

Word

38626 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.14 - Detailed work plan for a draft revision 6 of Recommendation ITU-R M.2012-5

Word

34660 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.15 - Detailed work plan for development of Report ITU-R M.TTTT

Word

34425 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.16 - Detailed work plan for the development of the new Document IMT-2020/ZZZ (for 'after year 2021')

Word

33261 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.17 - Detailed work plan for the development of a working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]

Word

34973 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.18 - Detailed work plan for the development of preliminary draft new Report ITU-R M.[IMT.Above 100GHz]

Word

35045 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.19 - Detailed work plan on revision for "generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT-Advanced and IMT-2020"

Word

33201 bytes 2022-07-15 [1361]�Chapter 2 - Annex 2.24.20 - Detailed work plan for the review of existing ITU-R Resolutions, Questions and Opinion

Word

47814 bytes 2022-07-28 [1361]�Chapter 1 Part 2

Word

43612 bytes 2022-07-28 [1361]�Chapter 1 Part 1

Word

684194 bytes 2022-07-28 [1361]�Chapter 1 - Chairman's Report of the 41st meeting of Working Party 5D (13-24 June 2022) (Physical meeting with remote participation)

Excel 2007

31852 bytes 2022-07-27 [1361]�Chapter 1 - Annex 1.1 - Index of Chapters and Annexes of the Report of Working Party 5D Meeting #41

Document :

ITU-R�WP5D� Contribution� 1361

Title :

Report on the 41st meeting of Working Party 5D (Geneva, 13-24 June 2022)

Date :

2022-06-24

Source :

Chairman, WP 5D

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-10-07