|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
42672 bytes |
2022-09-19 |
[388]�Annex 9
- Terms of Reference for Working Party 4C Correspondence Group on adjacent band compatibility studies between MSS in the 1 518-1 525 MHz band and IMT in the 1 492-1 518 MHz band |
|
Word
�
|
32264 bytes |
2022-09-19 |
[388]�Annex 8
- Work plan for studies related to IMT/MSS compatibility at 1 518 MHz |
|
Word
�
|
37029 bytes |
2022-09-19 |
[388]�Annex 7
- Work plan for WRC-23 agenda item 1.18 |
|
Word
�
|
41329 bytes |
2022-09-19 |
[388]�Annex 6
- Work plan for WRC-23 agenda item 1.11, resolves 3 of Resolution 361 (Rev.WRC-19) |
|
Word
�
|
54262 bytes |
2022-09-19 |
[388]�Annex 5
- Draft CPM text for WRC-23 agenda item 1.18 |
|
Word
�
|
89345 bytes |
2022-09-19 |
[388]�Annex 4
- Draft CPM text for WRC-23 agenda item 1.11 |
|
Word
�
|
5283048 bytes |
2022-09-19 |
[388]�Annex 3
- Working document towards a preliminary draft new Report ITU-R M.[ADD_GSO_GMDSS] - or - Working draft document related to WRC-23 agenda item 1.11 - Introduction of additional GSO MSS systems into the GMDSS (WRC-23 agenda item 1.11, resolves 3) |
|
Word
�
|
125713 bytes |
2022-09-19 |
[388]�Annex 2
- Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] - Technical and regulatory measures to provide compatibility between IMT and MSS, with respect to MSS operations in the frequency band 1 518-1 525 MHz for administrations wishing to implement IMT in the frequency band 1 492-1 518 MHz |
|
Word
�
|
35754 bytes |
2022-09-19 |
[388]�Annex 1
- Preliminary draft revision of Recommendation ITU-R M.633-4 - Transmission characteristics of a satellite emergency position-indicating radio beacon (satellite EPIRB) system operating through a satellite system in the 406 MHz band |
|
Word
�
|
104218 bytes |
2022-10-18 |
[388]�
- Report of the twenty-ninth meeting of Working Party 4C (Geneva, 7-13 September 2022) |
|
|