Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 117 ]
�
� |
Reply liaison statement to CCT (copy for information to Study Group 6 and Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7C)
�
� |
WP 7D
� |
� |
2023-10-19 |
|
[ 116 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 work plan for frequencies above 100 GHz
�
� |
WP 3M
� |
� |
2023-06-09 |
|
[ 115 ]
�
+Ann.1-7� |
Report on the fifth 2019-2023 meeting of Working Party 1B (Thessaloniki, Greece, 29 May - 2 June 2023)
�
� |
Chairman, WP 1B
� |
� |
2023-06-02 |
|
[ 114 ]
�
� |
Final list of participants - Working Party 1B (Thessaloniki, Greece, 29 May - 2 June 2023)
�
� |
Director, BR
� |
� |
2023-06-02 |
|
[ 113 ]
�
� |
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8
�
� |
WPs 3J, 3K & 3M
� |
� |
2023-06-02 |
|
[ 112 ]
�
� |
Liaison statement to ITU-T Study Groups 16 and 20, ITU-R SG 1 and Working Parties 1B, 5A and 5D (copy to ITU-T SGs 2, 3, 5, 9, 13, and ITU-R WPs 1C, 4A, 5B, 5C, 6A, 7B) on question of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) for e-services including e-health and e-education
�
� |
ITU-D SG2
� |
� |
2023-05-31 |
|
[ 111 ]
�
� |
List of documents issued (Documents 1B/80-1B/111)
�
� |
BR, Study Groups Department
� |
� |
2023-05-30 |
|
[ 110 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on the questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022)
�
� |
ITU-D SG1
� |
� |
2023-05-23 |
|
[ 109 ]
�
� |
Proposed editorial revision of seven Recommendations assigned to ITU-R Working Party 1B
�
� |
Chairman/Focal Point, SG 1 CG on editorial review
� |
� |
2023-05-23 |
|
[ 108 ]
�
� |
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization
�
� |
United Arab Emirates
� |
� |
2023-05-22 |
|
[ 107 ]
�
� |
Proposed modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value
�
� |
India (Republic of)
� |
� |
2023-05-22 |
|
[ 106 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
�
� |
Korea (Republic of)
� |
� |
2023-05-19 |
|
[ 105 ]
�
� |
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems
�
� |
Korea (Republic of)
� |
� |
2023-05-19 |
|
[ 104 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4B, 4C, 6A, and 7C regarding revision of Resolution ITU-R 55
�
� |
WP 5A
� |
� |
2023-05-19 |
|
[ 103 ]
�
� |
Reply liaison statement to CCT (copy to Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Revising Recommendation ITU-R V.431-8
�
� |
WP 5A
� |
� |
2023-05-18 |
|
[ 102 ]
�
� |
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]
�
� |
China (People's Republic of)
� |
� |
2023-05-17 |
|
[ 101 ]
�
� |
Proposals on the modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value
�
� |
China (People's Republic of)
� |
� |
2023-05-17 |
|
[ 100 ]
�
� |
Liaison statement to ITU-R Working Parties - Revising Recommendation ITU-R V.431-8
�
� |
CCT
� |
� |
2023-05-09 |
|
[ 99 ]
�
� |
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
�
� |
Brazil (Federative Republic of)
� |
� |
2023-04-28 |
|
[ 98 ]
�
� |
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management
�
� |
Kenya (Republic of)
,
ATDI
� |
� |
2023-04-21 |
|
[ 97 ]
�
� |
Editorial revision of Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology
�
� |
United States of America
� |
� |
2023-04-21 |
|
[ 96 ]
�
� |
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
�
� |
United States of America
� |
� |
2023-04-21 |
|
[ 95 ]
�
� |
Editorial revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
�
� |
United States of America
� |
� |
2023-04-21 |
|
[ 94 ]
�
� |
Liaison statement on new ITU-T Focus Group on costing models for affordable data services (FG-CostingData)
�
� |
ITU-T SG3
� |
� |
2023-03-15 |
|
[ 93 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 1/2 to ITU-T Study Groups 3, 5, 12, 13, 15, 16, 17, 20 FG-AI4A, ITU-R Study Groups 3, 4, 6, ITU-R Working Parties 1B, 5A, 5C, and 5D on new Question 1/2 and collaboration
�
� |
ITU-D SG2
� |
� |
2022-12-20 |
|
[ 92 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 6/1 to ITU-R Study Group 1 and Working Party 1B on consumer information, protection and rights
�
� |
ITU-D SG1
� |
� |
2022-12-20 |
|
[ 91 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration
�
� |
ITU-D SG1
� |
� |
2022-12-20 |
|
[ 90 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 3/1 to all related Study Groups of ITU-T, all related Working Parties of ITU-R, APT and ETSI on disaster risk reduction and management
�
� |
ITU-D SG1
� |
� |
2022-12-20 |
|
[ 89 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz
�
� |
WP 5C
� |
� |
2022-12-01 |
|
[ 88 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF
�
� |
WP 5C
� |
� |
2022-11-30 |
|
[ 87 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
�
� |
WP 5A
� |
� |
2022-11-28 |
|
[ 86 ]
�
� |
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves
�
� |
ATDI
� |
Q228/3
� |
2022-11-21 |
|
[ 85 ]
�
� |
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves
�
� |
ATDI
� |
Q228/3
� |
2022-11-02 |
|
[ 84 ]
�
� |
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
�
� |
WP 5D
� |
� |
2022-10-28 |
|
[ 83 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz
�
� |
WP 7C
� |
� |
2022-10-07 |
|
[ 82 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 3J, 3K, 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, and 7C - Extending the application of propagation Recommendations to frequencies greater than 100 GHz
�
� |
WP 7D
� |
� |
2022-10-06 |
|
[ 81 ]
�
� |
Liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Extending the application of propagation Recommendations to frequencies greater than 100 GHz
�
� |
WP 4B
� |
� |
2022-09-19 |
|
[ 80 ]
�
+Ann.1-4� |
Report on the fourth 2019-2023 meeting of Working Party 1B (Geneva, 28 June - 7 July 2022)
�
� |
Chairman, WP 1B
� |
� |
2022-07-06 |
|
[ 79 ]
�
� |
Final list of participants Working Party 1B (Geneva, 28 June - 7 July 2022)
�
� |
Director, BR
� |
� |
2022-07-06 |
|
[ 78 ]
�
� |
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
�
� |
CCT
� |
� |
2022-06-30 |
|
[ 77 ]
�
� |
List of documents issued (Documents 1B/64 - 1B/77)
�
� |
BR, Study Groups Department
� |
� |
2022-06-28 |
|
[ 76 ]
�
� |
Proposed additional modifications to the preliminary draft revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
�
� |
Brazil (Federative Republic of)
� |
� |
2022-06-21 |
|
[ 75 ]
�
� |
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]
�
� |
China (People's Republic of)
� |
� |
2022-06-21 |
|
[ 74 ]
�
� |
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL]
�
� |
China (People's Republic of)
� |
� |
2022-06-21 |
|
[ 73 ]
�
� |
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems
�
� |
Korea (Republic of)
� |
� |
2022-06-20 |
|
[ 72 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
�
� |
Korea (Republic of)
� |
Q241/1
� |
2022-06-20 |
|
[ 71 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1603-2 - Spectrum redeployment as a method of national spectrum management
�
� |
United States of America
� |
� |
2022-06-16 |
|
[ 70 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz
�
� |
WP 3M
� |
� |
2022-06-14 |
|
[ 69 ]
�
� |
Liaison statement - Revision ETSI Report TR 103 181-3 - Summary worldwide UWB regulations
�
� |
European Telecommunications Standards Institute
� |
� |
2022-06-01 |
|
[ 68 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a)
�
� |
WP 7C
� |
AI9.1A)
� |
2022-05-06 |
Results:117 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):