|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
35584 bytes |
2023-06-09 |
[115]�Annex 7
- Reply liaison statement to the Coordination Committee for Terminology (CCT) - Revising Recommendation ITU-R V.431-8 |
|
Word
�
|
38466 bytes |
2023-06-09 |
[115]�Annex 6
- Reply liaison statement to the ITU-D Study Group 1 Question 4/1 Rapporteur Group - Information related to the topics of mutual interest |
|
Word
�
|
785434 bytes |
2023-06-09 |
[115]�Annex 5
- Working document towards a preliminary draft revision of Report ITU-R SM.2015-2 - Methods for determining national long-term strategies for spectrum utilization |
|
Word
�
|
1386186 bytes |
2023-06-09 |
[115]�Annex 4
- Working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management |
|
Word
�
|
1507260 bytes |
2023-06-09 |
[115]�Annex 3
- Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability |
|
Word
�
|
34918 bytes |
2023-06-09 |
[115]�Annex 2
- Terms of Reference for a Correspondence Group on Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
�
|
993746 bytes |
2023-06-09 |
[115]�Annex 1
- Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems |
|
Word
�
|
61999 bytes |
2023-06-29 |
[115]�
- Report on the Fifth 2020-2023 meeting of Working Party 1B - (Thessaloniki, 29 May to 2 June 2023) |
|
|