|
Format |
Size |
Posted |
|
|
|
English |
Word
�
|
262329 bytes |
2016-11-02 |
[112]�Annex 20
- Preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT to primary and addition of primary allocation to EESS |
|
Word
�
|
116944 bytes |
2016-11-02 |
[112]�Annex 19
- Preliminary draft new Report ITU-R SA.[400 MHZ-LIMITS] - To consider establishing in-band power limits for earth stations operating
in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within
the MSS, EESS and MetSat services
|
|
Word
�
|
396217 bytes |
2020-12-16 |
[112]�Annex 18
- Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for assessing interference to systems operating in
the Earth exploration-satellite and meteorological-satellite services,
and for conducting sharing studies
|
|
Word
�
|
100883 bytes |
2016-11-02 |
[112]�Annex 17
- Preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - CHARACTERISTICS] - Studies to accommodate requirements in the space operation service for non-geostationary satellites with short duration missions |
|
Word
�
|
106881 bytes |
2016-11-02 |
[112]�Annex 16
- Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - REQUIREMENTS] - Studies to accommodate requirements in the space operation service for non-geostationary satellites with short duration missions |
|
Word
�
|
245282 bytes |
2016-11-02 |
[112]�Annex 15
- Working document towards a preliminary draft new Report ITU-R SA.[short duration NGSO - SHARING STUDIES] - Studies to accommodate requirements in the space operation service for non-geostationary satellites with short duration missions |
|
Word
�
|
67228 bytes |
2016-11-02 |
[112]�Annex 14
- Element for the Chairman's Report regarding treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth and on unrealistic notified characteristics of recorded frequency assignments of GSO satellite networks |
|
Word
�
|
77016 bytes |
2016-11-02 |
[112]�Annex 13
- Preliminary draft revision to Recommendation ITU-R SA.1161-1 - Sharing and coordination criteria for Data Dissemination and direct data readout systems in the earth exploration-satellite and meteorological-satellite services using satellites in geostationary orbit |
|
Word
�
|
102142 bytes |
2016-11-02 |
[112]�Annex 12
- Preliminary draft revision to Recommendation ITU-R SA.1160-2 - Interference criteria for data dissemination and direct data readout systems in the earth exploration-satellite and meteorological-satellite services using satellites in the geostationary orbit |
|
Word
�
|
73066 bytes |
2016-11-02 |
[112]�Annex 11
- Preliminary draft revision to Recommendation ITU-R SA.1159-3 - Performance criteria for data transmission systems in the Earth exploration-satellite service and meteorological-satellite service |
|
Word
�
|
219500 bytes |
2016-11-02 |
[112]�Annex 10
- Preliminary draft revision to Recommendation ITU-R SA.1164-2 - Sharing and coordination criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services |
|
Word
�
|
368817 bytes |
2016-11-02 |
[112]�Annex 09
- Preliminary draft revision to Recommendation ITU-R SA.1163-2 - Interference criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services |
|
Word
�
|
71395 bytes |
2016-11-02 |
[112]�Annex 08
- Preliminary draft revision to Recommendation ITU-R SA.1810-0 - System design guidelines for Earth exploration-satellites operating
in the band 8 025-8 400 MHz
|
|
Word
�
|
65865 bytes |
2016-11-02 |
[112]�Annex 07
- Preliminary draft revision to Recommendation ITU-R SA.1743 - Maximum allowable degradation to radiocommunication links of the space
research and space operation services arising from interference from
emissions and radiations from other radio sources
|
|
Word
�
|
68094 bytes |
2016-11-02 |
[112]�Annex 06
- Draft CPM text on WRC-19 agenda item 1.7 |
|
Word
�
|
67636 bytes |
2016-11-02 |
[112]�Annex 05
- Draft work plan for studies required for WRC-19 agenda item 1.7 |
|
Word
�
|
66451 bytes |
2016-11-02 |
[112]�Annex 04
- Draft CPM text on WRC-19 agenda item 1.3 - Agenda item 1.3 |
|
Word
�
|
67004 bytes |
2016-11-02 |
[112]�Annex 03
- Work plan and milestones for WRC-19 agenda item 1.3 - Draft Work plan for studies required for WRC-19 agenda item 1.3 |
|
Word
�
|
66395 bytes |
2016-11-02 |
[112]�Annex 02
- Draft CPM text on WRC-19 agenda item 1.2 - agenda item 1.2 |
|
Word
�
|
66037 bytes |
2016-11-02 |
[112]�Annex 01
- Work plan and milestones for agenda item 1.2 |
|
Word
�
|
90402 bytes |
2016-11-11 |
[112]�
- Report on the October 2016 meeting of Working Party 7B with a view to its next meeting (April 2017) (Geneva, 24-28 October 2016) |
|
|