Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 101 ]
�
� |
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database
�
� |
WP 6A
� |
Q32/6
� |
2019-07-29 |
|
[ 100 ]
�
� |
Reply liaison statement to Working Party 7A - Draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
�
� |
WP 1A
� |
� |
2019-06-24 |
|
[ 99 ]
�
� |
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R
�
� |
WP 1A
� |
� |
2019-06-21 |
|
[ 98 ]
�
� |
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems
�
� |
WP 1A
� |
� |
2019-06-21 |
|
[ 97 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications
�
� |
WP 1A
� |
� |
2019-06-21 |
|
[ 96 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range
�
� |
WP 1A
� |
� |
2019-06-18 |
|
[ 95 ]
�
� |
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise
�
� |
WP 1A
� |
� |
2019-06-18 |
|
[ 94 ]
�
� |
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference
�
� |
WP 1A
� |
� |
2019-06-18 |
|
[ 93 ]
�
� |
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer
�
� |
WP 1B
� |
� |
2019-06-17 |
|
[ 92 ]
�
� |
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"
�
� |
WP 7C
� |
� |
2019-06-10 |
|
[ 91 ]
�
+Ann.02(Rev.1)� |
Report on the meeting of Working Party 7A (Geneva, 28-31 May 2019)
�
� |
Chairman, WP 7A
� |
� |
2019-05-31 |
|
[ 90 ]
�
� |
Final List of Participants - Working Party 7A (Geneva, 28-31 May 2019)
�
� |
Director, BR
� |
� |
2019-05-31 |
|
[ 89 ]
�
� |
List of documents issued (Documents 7A/73 - 7A/89)
�
� |
BR Study Groups Department
� |
� |
2019-05-27 |
|
[ 88 ]
�
� |
Proposals to amend the working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
Germany (Federal Republic of)
� |
� |
2019-05-23 |
|
[ 87 ]
�
� |
Draft revision to working document towards a preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA]
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2019-05-21 |
|
[ 86 ]
�
� |
Reply liaison statement to Working Party 1B on SFTS protection criteria
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2019-05-21 |
|
[ 85 ]
�
� |
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems - Chapter 1: Introduction and basic concepts
�
� |
United States of America
� |
� |
2019-05-21 |
|
[ 84 ]
�
� |
Proposal for modification of working document towards the preliminary draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication
�
� |
Japan
� |
� |
2019-05-20 |
|
[ 83 ]
�
� |
Proposals to working document towards a preliminary draft new Report ITU-R TF.[SFTS PROTECTION CRITERIA]
�
� |
Russian Federation
� |
� |
2019-05-20 |
|
[ 82 ]
�
� |
Proposals to working document towards the preliminary draft new Report ITU-R TF.[UTC]
�
� |
Russian Federation
� |
� |
2019-05-20 |
|
[ 81 ]
�
� |
Proposed modification to the working document towards a preliminary draft new Report ITU-R TF.[UTC]
�
� |
France
� |
� |
2019-05-20 |
|
[ 80 ]
�
� |
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems
�
� |
WP 5A
� |
� |
2019-05-13 |
|
[ 79 ]
�
� |
Liaison statement to Working Parties 1A and 1B (copy for information Working Parties 5A, 5B, and 7A) - Frequency use by non-beam Wireless Power Transmission (WPT) applications using inductive power transfer
�
� |
WP 6A
� |
� |
2019-02-04 |
|
[ 78 ]
�
� |
Reply liaison statement to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems
�
� |
WP 5D
� |
� |
2019-03-05 |
|
[ 77 ]
�
� |
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)
�
� |
WP 1B
� |
AI9.1
� |
2018-11-29 |
|
[ 76 ]
�
� |
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems
�
� |
WP 5A
� |
� |
2018-11-20 |
|
[ 75 ]
�
� |
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems
�
� |
WP 5D
� |
� |
2018-10-23 |
|
[ 74 ]
�
� |
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"
�
� |
WP 7C
� |
� |
2018-09-26 |
|
[ 73 ]
�
+Ann.1-2� |
Report of the meeting of Working Party 7A (Geneva, 19-25 September 2018)
�
� |
Chairman, WP 7A
� |
� |
2018-09-25 |
|
[ 72 ]
�
� |
Final List of Participants - Working Party 7A (Geneva, 19-25 September 2018)
�
� |
Director, BR
� |
� |
2018-09-25 |
|
[ 71 ]
�
� |
List of documents issued (Documents 7A/57 - 7A/71)
�
� |
BR Study Group Department
� |
� |
2018-09-18 |
|
[ 70 ]
�
� |
United Kingdom MSF 60 KHz standard frequency and time signal service (SFTS) transmission and reception
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2018-09-12 |
|
[ 69 ]
�
� |
Draft reply liaison statement to International Bureau of Weights and Measures
�
� |
Russian Federation
� |
� |
2018-09-11 |
|
[ 68 ]
�
� |
Proposals to working document towards the preliminary draft new Report ITU-R TF[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication
�
� |
Russian Federation
� |
� |
2018-09-11 |
|
[ 67 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS
�
� |
WP 4B
� |
� |
2018-07-06 |
|
[ 66 ]
�
� |
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
�
� |
WP 1A
� |
Q210/1
� |
2018-06-29 |
|
[ 65 ]
�
� |
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems
�
� |
WP 1A
� |
� |
2018-06-29 |
|
[ 64 ]
�
� |
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification
�
� |
WP 1A
� |
� |
2018-06-29 |
|
[ 63 ]
�
� |
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems
�
� |
WP 1A
� |
� |
2018-06-21 |
|
[ 62 ]
�
� |
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems
�
� |
WP 5D
� |
� |
2018-06-21 |
|
[ 61 ]
�
� |
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6
�
� |
WP 1B
� |
AI9.1
� |
2018-06-28 |
|
[ 60 ]
�
� |
Reply liaison statement to Working Party 7A (copy for information to Working Parties 5A and 5D) - Coordinated universal time application in the systems of the maritime mobile service, including global maritime distress and safety service, aeronautical mobile service and radiodetermination service
�
� |
WP 5B
� |
� |
2018-05-30 |
|
[ 59 ]
�
� |
Reply liaison statement to Working Party 7A - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems"
�
� |
WPs 7B and 7C
� |
� |
2018-05-22 |
|
[ 58 ]
�
� |
Reply liaison statement to Working Party 7C - UTC application in radio astronomy service systems
�
� |
WP 7D
� |
� |
2018-05-21 |
|
[ 57 ]
�
+Ann.1-2� |
Report of the meeting of Working Party 7A (Geneva, 14-18 May 2018)
�
� |
Chairman, WP 7A
� |
� |
2018-05-18 |
|
[ 56 ]
�
� |
Final List of Participants - Working Party 7A (Geneva, 14-18 May 2018)
�
� |
Director, BR
� |
� |
2018-05-18 |
|
[ 55 ]
�
� |
List of documents issued (Documents 7A/43 - 7A/55)
�
� |
BR Study Groups Department
� |
� |
2018-05-11 |
|
[ 54 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R TF.[time]
�
� |
United States of America
� |
� |
2018-05-07 |
|
[ 53 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R TF.[Relativistic] Relativistic Time Transfer
�
� |
United States of America
� |
� |
2018-05-07 |
|
[ 52 ]
�
� |
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
regarding broadcasting systems
�
� |
WP 6B
� |
� |
2018-05-04 |
Results:101 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):