International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:1310 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 1310 ]
Liaison statement on work being carried out under study in ITU-T Q3/5 � ITU-T SG 5 2019-10-15
[ 1309 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Party 5D on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services � ITU-D SG 1 2019-10-02
[ 1308 ]
Liaison statement from the 5G PPP IMT-2020 Evaluation Group Regarding - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 � 5G PPP 2019-10-01
[ 1307 ]
Liaison statement from the 5GMF IMT-2020 Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 � Fifth Generation Mobile Forum (5GMF-IEG) 2019-09-30
[ 1306 ]
Reply liaison statement to Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (TTA) � Director, BR 2019-09-30
[ 1305 ]
Liaison statement from ChEG regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 � The Chinese Evaluation Group (ChEG) 2019-09-30
[ 1304 ]
Liaison statement from the 5G India Forum Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 � Director, BR 2019-09-27
[ 1303 ]
Response to the LS from ITU-R Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (CEG) � Director, BR 2019-09-27
[ 1302 ]
Liaison statement from ATIS WTSC IMT-2020 Evaluation Group regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 � Alliance for Telecommunications Industry Solutions 2019-09-24
[ 1301 ]
Updated submission of the candidate IMT-2020 Technology � TSDS, India (TSDSI) 2019-09-10
[ 1300 ]
Updated submission of candidate IMT-2020 Radio Interface Technology (EUHT) � Nufront (Beijing) Technology Co., Ltd. 2019-09-10
[ 1299 ]
Candidate submission for inclusion in IMT-2020 � Eswatini (Kingdom of) , Botswana (Republic of) , Malawi , South Africa (Republic of) , Zimbabwe (Republic of) 2022-06-06
[ 1298 ]
Liaison statement on ITU-T SG20 terms and definitions � SCV 2019-08-23
[ 1297 ]
+Ch.1-7
Report on the thirty-second meeting of Working Party 5D (B�zios, Brazil, 9-17 July 2019) � Chairman, WP 5D 2019-07-22
[ 1296 ]
Final List of Participants - Working Party 5D (B�zios, Brazil, 9-17 July 2019 � Director, BR 2019-07-18
[ 1295 ]
(Rev.2)
Update on activities in Region 3 � Region 3 Rapporteur 2019-07-09
[ 1294 ]
Report on the recent activities of the Wireless World Research Forum (WWRF) � WWRF Liaison Rapporteur 2019-07-08
[ 1293 ]
Update on recent activities within CEPT � ITU Region 1 (CEPT) Rapporteur AI1.13 2019-07-08
[ 1292 ]
Liaison statement on invitation to update the information in the IMT2020 roadmap [to ITU Study Groups and External IMT-2020 liaison partners] � Chairman, ITU-T JCA-IMT2020 2019-07-08
[ 1291 ]
Update on recent and planned IMT-related activities within ATU � ITU Region 1 (ATU) Rapporteur 2019-07-05
[ 1290 ]
Submission in support of TSDSI RIT proposal towards IMT-2020 � India (Republic of) 2019-07-02
[ 1289 ]
Input on working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] � India (Republic of) 2019-07-02
[ 1288 ]
Input on working document towards preliminary draft new Question ITU-R [IMT.SPECIFIC INDUSTRIAL APPLICATIONS]/5 � India (Republic of) 2019-07-02
[ 1287 ]
Proposal for preliminary draft new Recommendation on the frequency band 24.25-27.5 GHz under agenda item 1.13 item A � United Arab Emirates 2019-07-02
[ 1286 ]
Proposal for the revision of Recommendation ITU-R M.1036-5 � United Arab Emirates 2019-07-02
[ 1285 ]
Draft new Report ITU-R M.[RADAR&IMT SHARING] � Angola (Republic of) , Botswana (Republic of) , Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Lesotho (Kingdom of) , Malawi , Mozambique (Republic of) , Namibia (Republic of) , Niger (Republic of the) , Nigeria (Federal Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Tanzania (United Republic of) , Uganda (Republic of) , Zambia (Republic of) , Zimbabwe (Republic of) 2019-07-02
[ 1284 ]
Considerations on aspects of synchronization operations on multiple IMT-2020 TDD networks � Telefon AB - LM Ericsson 2019-07-02
[ 1283 ]
Sharing and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocations systems in 3 100-3 400 MHz � Orange 2019-07-02
[ 1282 ]
Proposed revision to the draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] � Inmarsat Plc. 2019-07-02
[ 1281 ]
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries � Inmarsat Plc. 2019-07-02
[ 1280 ]
Revision of the Recommendation ITU-R M.1036-5 � Deutsche Telekom AG , Nokia Corporation , Orange , Telecom Italia S.p.A. , Telef�nica, S.A. , Telia Company AB 2019-07-02
[ 1279 ]
Response to liaison statement to registered Independent Evaluation Group � Director, BR 2019-07-02
[ 1278 ]
Proposal on the work plan and the skeleton of Report ITU-R M.[IMT-2020.TDD. SYNCHRONIZATION] � China (People's Republic of) 2019-07-02
[ 1277 ]
Consideration on a new ITU-R Resolution and Question for other industrial usages by IMT � China (People's Republic of) 2019-07-02
[ 1276 ]
Observations for technology submissions � China (People's Republic of) 2019-07-02
[ 1275 ]
Proposals for Addendum 4 to Circular Letter 5/LCCE/59 � China (People's Republic of) 2019-07-02
[ 1274 ]
Proposals for program of IMT-2020 evaluation workshop � China (People's Republic of) 2019-07-02
[ 1273 ]
Proposals on workplan of SWG Evaluation � China (People's Republic of) 2019-07-02
[ 1272 ]
Proposals on LS contents to proponents and IEGS � China (People's Republic of) 2019-07-02
[ 1271 ]
Proposals on format of conclusion from IMT-2020 submissions in SWG Eval � China (People's Republic of) 2019-07-02
[ 1270 ]
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries � China (People's Republic of) AI9.1 2019-07-02
[ 1269 ]
Evaluation activities from Chinese Evaluation Group � Director, BR 2019-07-02
[ 1268 ]
Final submission of candidate IMT-2020 radio interface technology � China (People's Republic of) 2019-07-02
[ 1267 ]
Electromagnetic simulations of A 26 GHz band advanced antenna system (AAS) at different frequencies � United Kingdom of Great Britain and Northern Ireland 2019-07-02
[ 1266 ]
Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band � WP 4C 2019-07-02
[ 1265 ]
Updates to spectrum analyzer measurements of terrestrial IMT operations for 2 GHz band segments addressed in WRC-19 agenda item 9.1.1 � Papua New Guinea 2019-07-02
[ 1264 ]
Further updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries (Question ITU-R 201-1/4) � Papua New Guinea 2019-07-02
[ 1263 ]
Liaison statement to ITU-T JCA IMT-2020, ITU-R Working Party 5D and 3GPP - Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies � WP 4B 2019-07-02
[ 1262 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � WP 4A 2019-07-05
[ 1261 ]
Proposals on the work of the preliminary draft new Report ITU-R M.[REP.MSS & IMT L-BAND COMPATIBILITY] and on the working document towards a draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] � Brazil (Federative Republic of) 2019-07-01
Results:1310 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-06-07