Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1310 ]
�
� |
Liaison statement on work being carried out under study in ITU-T Q3/5
�
� |
ITU-T SG 5
� |
� |
2019-10-15 |
|
[ 1309 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Party 5D on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services
�
� |
ITU-D SG 1
� |
� |
2019-10-02 |
|
[ 1308 ]
�
� |
Liaison statement from the 5G PPP IMT-2020 Evaluation Group Regarding - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
�
� |
5G PPP
� |
� |
2019-10-01 |
|
[ 1307 ]
�
� |
Liaison statement from the 5GMF IMT-2020 Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
�
� |
Fifth Generation Mobile Forum (5GMF-IEG)
� |
� |
2019-09-30 |
|
[ 1306 ]
�
� |
Reply liaison statement to Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (TTA)
�
� |
Director, BR
� |
� |
2019-09-30 |
|
[ 1305 ]
�
� |
Liaison statement from ChEG regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
�
� |
The Chinese Evaluation Group (ChEG)
� |
� |
2019-09-30 |
|
[ 1304 ]
�
� |
Liaison statement from the 5G India Forum Evaluation Group - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
�
� |
Director, BR
� |
� |
2019-09-27 |
|
[ 1303 ]
�
� |
Response to the LS from ITU-R Working Party 5D - Information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020 (CEG)
�
� |
Director, BR
� |
� |
2019-09-27 |
|
[ 1302 ]
�
� |
Liaison statement from ATIS WTSC IMT-2020 Evaluation Group regarding information of the evaluation for the terrestrial components of the radio interface(s) for IMT-2020
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2019-09-24 |
|
[ 1301 ]
�
� |
Updated submission of the candidate IMT-2020 Technology
�
� |
TSDS, India (TSDSI)
� |
� |
2019-09-10 |
|
[ 1300 ]
�
� |
Updated submission of candidate IMT-2020 Radio Interface Technology (EUHT)
�
� |
Nufront (Beijing) Technology Co., Ltd.
� |
� |
2019-09-10 |
|
[ 1299 ]
�
� |
Candidate submission for inclusion in IMT-2020
�
� |
Eswatini (Kingdom of)
,
Botswana (Republic of)
,
Malawi
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2022-06-06 |
|
[ 1298 ]
�
� |
Liaison statement on ITU-T SG20 terms and definitions
�
� |
SCV
� |
� |
2019-08-23 |
|
[ 1297 ]
�
+Ch.1-7� |
Report on the thirty-second meeting of Working Party 5D (B�zios, Brazil, 9-17 July 2019)
�
� |
Chairman, WP 5D
� |
� |
2019-07-22 |
|
[ 1296 ]
�
� |
Final List of Participants - Working Party 5D (B�zios, Brazil, 9-17 July 2019
�
� |
Director, BR
� |
� |
2019-07-18 |
|
[ 1295 ]
�
(Rev.2)� |
Update on activities in Region 3
�
� |
Region 3 Rapporteur
� |
� |
2019-07-09 |
|
[ 1294 ]
�
� |
Report on the recent activities of the Wireless World Research Forum (WWRF)
�
� |
WWRF Liaison Rapporteur
� |
� |
2019-07-08 |
|
[ 1293 ]
�
� |
Update on recent activities within CEPT
�
� |
ITU Region 1 (CEPT) Rapporteur
� |
AI1.13
� |
2019-07-08 |
|
[ 1292 ]
�
� |
Liaison statement on invitation to update the information in the IMT2020 roadmap [to ITU Study Groups and External IMT-2020 liaison partners]
�
� |
Chairman, ITU-T JCA-IMT2020
� |
� |
2019-07-08 |
|
[ 1291 ]
�
� |
Update on recent and planned IMT-related activities within ATU
�
� |
ITU Region 1 (ATU) Rapporteur
� |
� |
2019-07-05 |
|
[ 1290 ]
�
� |
Submission in support of TSDSI RIT proposal towards IMT-2020
�
� |
India (Republic of)
� |
� |
2019-07-02 |
|
[ 1289 ]
�
� |
Input on working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES]
�
� |
India (Republic of)
� |
� |
2019-07-02 |
|
[ 1288 ]
�
� |
Input on working document towards preliminary draft new Question ITU-R [IMT.SPECIFIC INDUSTRIAL APPLICATIONS]/5
�
� |
India (Republic of)
� |
� |
2019-07-02 |
|
[ 1287 ]
�
� |
Proposal for preliminary draft new Recommendation on the frequency band 24.25-27.5 GHz under agenda item 1.13 item A
�
� |
United Arab Emirates
� |
� |
2019-07-02 |
|
[ 1286 ]
�
� |
Proposal for the revision of Recommendation ITU-R M.1036-5
�
� |
United Arab Emirates
� |
� |
2019-07-02 |
|
[ 1285 ]
�
� |
Draft new Report ITU-R M.[RADAR&IMT SHARING]
�
� |
Angola (Republic of)
,
Botswana (Republic of)
,
Cameroon (Republic of)
,
Egypt (Arab Republic of)
,
Kenya (Republic of)
,
Lesotho (Kingdom of)
,
Malawi
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
Niger (Republic of the)
,
Nigeria (Federal Republic of)
,
Rwanda (Republic of)
,
South Africa (Republic of)
,
Tanzania (United Republic of)
,
Uganda (Republic of)
,
Zambia (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2019-07-02 |
|
[ 1284 ]
�
� |
Considerations on aspects of synchronization operations on multiple IMT-2020 TDD networks
�
� |
Telefon AB - LM Ericsson
� |
� |
2019-07-02 |
|
[ 1283 ]
�
� |
Sharing and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocations systems in 3 100-3 400 MHz
�
� |
Orange
� |
� |
2019-07-02 |
|
[ 1282 ]
�
� |
Proposed revision to the draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]
�
� |
Inmarsat Plc.
� |
� |
2019-07-02 |
|
[ 1281 ]
�
� |
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries
�
� |
Inmarsat Plc.
� |
� |
2019-07-02 |
|
[ 1280 ]
�
� |
Revision of the Recommendation ITU-R M.1036-5
�
� |
Deutsche Telekom AG
,
Nokia Corporation
,
Orange
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telia Company AB
� |
� |
2019-07-02 |
|
[ 1279 ]
�
� |
Response to liaison statement to registered Independent Evaluation Group
�
� |
Director, BR
� |
� |
2019-07-02 |
|
[ 1278 ]
�
� |
Proposal on the work plan and the skeleton of Report ITU-R M.[IMT-2020.TDD. SYNCHRONIZATION]
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1277 ]
�
� |
Consideration on a new ITU-R Resolution and Question for other industrial usages by IMT
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1276 ]
�
� |
Observations for technology submissions
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1275 ]
�
� |
Proposals for Addendum 4 to Circular Letter 5/LCCE/59
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1274 ]
�
� |
Proposals for program of IMT-2020 evaluation workshop
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1273 ]
�
� |
Proposals on workplan of SWG Evaluation
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1272 ]
�
� |
Proposals on LS contents to proponents and IEGS
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1271 ]
�
� |
Proposals on format of conclusion from IMT-2020 submissions in SWG Eval
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1270 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries
�
� |
China (People's Republic of)
� |
AI9.1
� |
2019-07-02 |
|
[ 1269 ]
�
� |
Evaluation activities from Chinese Evaluation Group
�
� |
Director, BR
� |
� |
2019-07-02 |
|
[ 1268 ]
�
� |
Final submission of candidate IMT-2020 radio interface technology
�
� |
China (People's Republic of)
� |
� |
2019-07-02 |
|
[ 1267 ]
�
� |
Electromagnetic simulations of A 26 GHz band advanced antenna system (AAS) at different frequencies
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2019-07-02 |
|
[ 1266 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band
�
� |
WP 4C
� |
� |
2019-07-02 |
|
[ 1265 ]
�
� |
Updates to spectrum analyzer measurements of terrestrial IMT operations for 2 GHz band segments addressed in WRC-19 agenda item 9.1.1
�
� |
Papua New Guinea
� |
� |
2019-07-02 |
|
[ 1264 ]
�
� |
Further updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries (Question ITU-R 201-1/4)
�
� |
Papua New Guinea
� |
� |
2019-07-02 |
|
[ 1263 ]
�
� |
Liaison statement to ITU-T JCA IMT-2020, ITU-R Working Party 5D and 3GPP - Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies
�
� |
WP 4B
� |
� |
2019-07-02 |
|
[ 1262 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
WP 4A
� |
� |
2019-07-05 |
|
[ 1261 ]
�
� |
Proposals on the work of the preliminary draft new Report ITU-R M.[REP.MSS & IMT L-BAND COMPATIBILITY] and on the working document towards a draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY]
�
� |
Brazil (Federative Republic of)
� |
� |
2019-07-01 |
Results:1310 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):