International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:665 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 665 ]
Liaison statement on work being carried out under study in ITU-T Q3/5 � ITU-T SG 5 2019-10-15
[ 664 ]
Revision of ERC Recommendation (01)02, ERC Recommendation 12-03, ERC Recommendation 12-06, Recommendation T/R 12-01 and Recommendation T/R 13-02 � Russian Federation 2019-07-25
[ 663 ]
Liaison statement to ITU-R Working Party 5C - Preliminary draft new Report ITU-R S.[LESIM-FS] � WP 4A AI1.5 2019-07-18
[ 662 ]
Liaison statement to Working Parties 5A, 5C, 7B, 7C and 7D - Non-geostationary satellites operating space-to-space links in mobile-satellite service (MSS) allocations in the 1-3 GHz range � WP 4C 2019-07-17
[ 661 ]
Liaison statement to Working Party 5D (Copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band � WP 4C 2019-07-02
[ 660 ]
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems � WP 1A 2019-06-21
[ 659 ]
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications � WP 1A 2019-06-21
[ 658 ]
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D - Information related to WRC-19 agenda item 1.15 � WP 1A 2019-06-21
[ 657 ]
Reply liaison statement to Working Party 5C - Development of a Recommendation on principles and approaches of limiting unwanted emissions for improving HF electromagnetic environment � WP 1A 2019-06-21
[ 656 ]
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range � WP 1A 2019-06-18
[ 655 ]
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise � WP 1A 2019-06-18
[ 654 ]
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference � WP 1A 2019-06-18
[ 653 ]
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5 � ITU-T SG 5 2019-06-14
[ 652 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2019-06-14
[ 651 ]
Liaison statement to Working Parties 7C and 5C - Ionospheric sounders used for space weather remote sensing � WP 3L 2019-05-23
[ 650 ]
Liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Recommendation ITU-R M.[MS-RXCHAR-28] � WP 5A 2019-05-15
[ 649 ]
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems � WP 5A 2019-05-13
[ 648 ]
+Ann.1-12
Report on the twenty-second meeting of Working Party 5C (Geneva, 29 April -8 May 2019) � Chairman, WP 5C 2019-05-09
[ 647 ]
Reply liaison statement to Working Party 7B (copy to Working Parties 4C, 5A, 5C and 6A for information) - Consideration of non-GSO short duration satellite systems in 137-138 MHz operating under the space operation service � WP 5B AI1.7 2019-05-09
[ 646 ]
Final list of participants - Working Party 5C (Geneva, 29 April - 8 May 2019) � Director, BR 2019-05-08
[ 645 ]
List of documents issued (Documents 5C/617 - 5C/645) � BR Study Groups Department 2019-04-26
[ 644 ]
Proposed modification to working document towards a preliminary draft new Handbook ITU-R [HF ADAPTIVE Handbook] � China (People's Republic of) 2019-04-22
[ 643 ]
Proposed Recommendation on principles and approaches of constraining unwanted emissions for improving HF electromagnetic environment � China (People's Republic of) 2019-04-22
[ 642 ]
Proposed modifications to preliminary draft new Report ITU-R F.[HF ENVIRONMENT] - Working document for improving the HF sky wave electromagnetic environment under the Question ITU-R 258/5 � China (People's Republic of) 2019-04-22
[ 641 ]
Proposed revision to preliminary draft new Report ITU-R F.[HAPS-39.5 GHz] � China (People's Republic of) 2019-04-22
[ 640 ]
Proposed revision to preliminary draft new Report ITU-R F.[HAPS-31 GHz] � China (People's Republic of) 2019-04-22
[ 639 ]
Review of the Questions assigned to Working Party 5C � Japan 2019-04-22
[ 638 ]
Proposed modifications to preliminary draft new Report ITU-R F.[HAPS-31GHz] � Samsung Electronics Co., Ltd. 2019-04-22
[ 637 ]
Revision of Recommendation ITU-R F.636-4 on channel width in 15 GHz band � Huawei Technologies Co. Ltd. Q247-1/5 2019-04-21
[ 636 ]
Revision of Recommendation ITU-R F.387-12 on channel width in 11 GHz band � Huawei Technologies Co. Ltd. Q247-1/5 2019-04-21
[ 635 ]
Proposed changes to preliminary draft new Report ITU-R F.[HAPS-25GHz] � Russian Federation AI1.14 2019-04-19
[ 634 ]
Considerations about reference radiation patterns for 275-450 GHz frequency range � Russian Federation 2019-04-19
[ 633 ]
Proposed amendments to preliminary draft revision of Recommendation ITU-R F.387-12 - Radio-frequency channel arrangements for fixed wireless systems in the 10.7-11.7 GHz band � Canada 2019-04-19
[ 632 ]
Proposed modifications to the preliminary draft Reports on sharing and compatibility studies on HAPS � Canada AI1.14 2019-04-19
[ 631 ]
Proposal for revision of Recommendation ITU-R F.383-9 - Radio-frequency channel arrangements for high-capacity fixed wireless systems operating in the lower 6 GHz (5 925 to 6 425 MHz) band � Canada 2019-04-19
[ 630 ]
Working document towards a preliminary draft revision of Report ITU-R F.2416 "Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency band 275-450 GHz" � Canada 2019-04-19
[ 629 ]
Proposed modifications to the draft new Report ITU-R F.[HAPS-21 GHz] - Sharing and compatibility studies of HAPS systems in the 21.4-22 GHz frequency range � United States of America 2019-04-15
[ 628 ]
Review of the Questions assigned to Working Party 5C � United States of America 2019-04-15
[ 627 ]
Draft reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 7B and 7C (copy for information to Working Party 1A) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � United States of America 2019-04-15
[ 626 ]
Preliminary draft new Report ITU-R F.[HAPS-2 GHz] - Sharing and compatibility studies of HAPS systems in the 21.4-22 GHz frequency range � United States of America AI1.14 2019-04-15
[ 625 ]
Preliminary draft new Report ITU-R F.[HAPS-25GHz] - Sharing and compatibility studies of HAPS systems in the 24.25-27.5 GHz frequency range in Region 2 � United States of America AI1.14 2019-04-15
[ 624 ]
Preliminary draft new Report ITU-R F.[HAPS-31GHz] - Sharing and compatibility studies of HAPS systems in the 27.9-28.2 GHz and 31.0-31.3 GHz frequency ranges � United States of America AI1.14 2019-04-15
[ 623 ]
Liaison statement on strategies and policies concerning human exposure to EMF � ITU-D SG 2 2019-04-11
[ 622 ]
Liaisons statement on ITU inter-Sector coordination � ITU-T SG 11 2019-03-21
[ 621 ]
Reply liaison statement to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems � WP 5D 2019-03-05
[ 620 ]
Liaison statement on ITU inter-Sector coordination � ITU-T TSAG 2018-12-17
[ 619 ]
Reply liaison statement to ITU-R Working Party 1A and the Rapporteur Group on the coexistence of wired telecommunication with radiocommunication systems (copy to Working Parties 5C and 5D) (copy for information to Working Parties 5B, 6A, 7A, 7B, 7C, 7D and ITU-T SG 15) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility Management Systems � WP 5A 2018-11-20
[ 618 ]
Liaison statement to Working Parties 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies � WP 5A 2018-11-20
[ 617 ]
+Ann.1-24
Report on the twenty-first meeting of Working Party 5C (Geneva, 5-15 November 2018) � Chairman, WP 5C 2018-11-16
[ 616 ]
Final list of participants - Working Party 5C (Geneva, 5-15 November 2018) � Director, BR 2018-11-15
Results:665 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18