Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP5A : Contribuciones : 114 Nuevo�-� Busque los documentos de la reuni�n
[114]� Report on the meeting of Working Party 5A - (Geneva, 10-20 May 2016)

Formato

Tama�o

Puesta a disposici�n

English

Word

66389 octetos 2016-05-24 [114]�Annex 31- List of output (TEMP) documents - (Documents 5A/TEMP/1 to 5A/TEMP/63)

Word

4415217 octetos 2020-12-17 [114]�Annex 30- Preliminary draft new Report ITU-R M.[RAIL.LINK] - Introduction to specific railway communication systems in the millimetric wave frequency range

Word

1936866 octetos 2020-12-17 [114]�Annex 29- Working document toward a preliminary draft new Report ITU-R M.[ITS USAGE] - Intelligent transport systems (ITS) usage in ITU Member States

Word

68947 octetos 2016-05-24 [114]�Annex 28- Working document towards a preliminary draft new Report ITU-R M.[300GHZ_MS_CHAR] - Technical and operational characteristics and applications of the land mobile service operating in the frequency band 275-450 GHz

Word

158858 octetos 2016-05-24 [114]�Annex 27- Working document towards a preliminary draft new Report ITU-R M.[SHARE] - Sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications

Word

6612912 octetos 2016-05-24 [114]�Annex 26- Working document towards a preliminary draft new Report ITU-R M.[RLAN SHARING] - Sharing and compatibility studies of WAS/RLAN in the 5 GHz frequency range

Word

8663486 octetos 2016-05-24 [114]�Annex 25- Working document towards a preliminary draft new Report ITU-R M.[AGGREGATE RLAN MEASUREMENTS] - Use of aggregate RLAN measurements from airborne and terrestrial platforms to support studies under WRC-19 agenda item 1.16

Word

182377 octetos 2016-06-08 [114]�Annex 24- Working document towards a preliminary draft new Report ITU-R M.[RLAN REQ-PAR] - Technical characteristics and operational requirements of WAS/RLAN in the 5 GHz frequency range

Word

911306 octetos 2016-05-24 [114]�Annex 23- Compilation of technical information on techniques that could be used in RLAN deployments to facilitate sharing

Word

266152 octetos 2016-05-24 [114]�Annex 22- Working document towards a preliminary draft new Report ITU-R M.[RLAN MITIGATION] - Possible additional mitigation techniques to facilitate sharing between RLAN systems and incumbent services

Word

942702 octetos 2016-05-24 [114]�Annex 21- Working document towards a preliminary draft new Report ITU-R M.[PPDR SPECTRUM] - Spectrum calculations and requirements for Public Protection and Disaster Relief (PPDR)

Word

431907 octetos 2016-05-23 [114]�Annex 20- Working document towards a preliiminary draft revision of Recommendation ITU-R M.2015-1 - Frequency arrangements for public protection and disaster relief radiocommunication systems in accordance with Resolution 646 (Rev.WRC-15)

Word

595397 octetos 2016-05-23 [114]�Annex 19- Working document towards a preliminary draft new Report ITU-R M.[RAIL.RSTT] - Technical and operational characteristics, implementation and spectrum needs of railway radiocommunication systems between train and trackside

Word

66859 octetos 2016-05-23 [114]�Annex 18- Working document towards a preliminary draft new Report ITU-R M.[DLMSA] - Digital land mobile systems for specific applications

Word

4451163 octetos 2016-05-23 [114]�Annex 17- Working document towards a preliminary draft revision of Report ITU-R M.2014-2 - Digital land mobile systems for dispatch traffic

Word

68080 octetos 2016-05-23 [114]�Annex 16- Working document towards a preliminary draft new [Recommendation] [or Report] ITU-R M.[AMATEUR-WSJT] - Use of structured data, error correction, and encoding/decoding techniques to improve communication reliability in the amateur services

Word

96481 octetos 2016-05-23 [114]�Annex 15- Working document toward preliminary draft new Report ITU-R M.[AMATEUR_50_MHz] - Spectrum needs for the amateur service in the frequency band 50-54 MHz in Region 1 and sharing with mobile fixed, radiolocation, and broadcasting services

Word

148755 octetos 2016-05-23 [114]�Annex 14- Preliminary draft revision to Recommendation ITU R M.1732 1 - Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies

Word

66993 octetos 2016-05-23 [114]�Annex 13- Draft workplan for WRC-19 agenda item 9.1 issue 9.1.5

Word

59255 octetos 2016-05-23 [114]�Annex 12- Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1 issue 9.1.5

Word

59513 octetos 2016-05-23 [114]�Annex 11- Draft work plan for WRC-19 agenda item 1.16

Word

59788 octetos 2016-05-23 [114]�Annex 10- Working document towards preliminary draft CPM text for WRC-19 agenda item 1.16

Word

60306 octetos 2016-05-23 [114]�Annex 09- Draft work plan for WRC-19 agenda item 1.12

Word

67455 octetos 2016-05-23 [114]�Annex 08- Elements of draft CPM text for WRC-19 agenda item 1.12 - Agenda item 1.12

Word

60339 octetos 2016-05-23 [114]�Annex 07- Work plan for preparation for WRC-19 agenda item 1.11

Word

59918 octetos 2016-05-23 [114]�Annex 06- Working document towards draft CPM text for WRC-19 agenda item 1.11

Word

62023 octetos 2016-05-23 [114]�Annex 05- Work plan for WRC-19 agenda item 1.1

Word

61625 octetos 2016-05-23 [114]�Annex 04- Working document toward preliminary draft CPM text for WRC-19 agenda item 1.1

Word

503771 octetos 2016-06-03 [114]�Annex 03- Consolidation of Reports from the Working Groups of Working Party 5A

Word

2809308 octetos 2016-06-02 [114]�Annex 02- Consolidation of texts approved by Working Party 5A

Word

233498 octetos 2016-06-02 [114]�Annex 01- Working Party 5A management

Word

93624 octetos 2016-07-06 [114]�- Report on the meeting of Working Party 5A (Geneva, 10-20 May 2016)

Documento :

UIT-R�WP5A� Contribuci�n� 114

T�tulo :

Report on the meeting of Working Party 5A - (Geneva, 10-20 May 2016)

Recibido en :

2016-05-19

Origen :

Chairman, WP 5A

Disponibilidad :

Documento p�blico

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2020-12-17