International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 383 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-T Study Group 3 and ITU-R Study Group 1 Working Party 1B on economic aspects of spectrum management and sharing - Economic policies and methods of determining the costs of services related to national telecommunication/information and communication technology networks, including next-generation networks � ITU-D SG 1 2019-10-09
[ 382 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services � ITU-D SG 1 2019-10-02
[ 381 ]
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam � WP 1A 2019-06-24
[ 380 ]
+Ann.1-4
Report on the seventh 2015-2019 meeting of Working Party 1B (Geneva, 28 May - 5 May 2019) � Chairman, WP 1B 2019-06-05
[ 379 ]
Final list of participants - Working Party 1B (Geneva, 28 May - 5 June 2019) � Director, BR 2019-06-05
[ 378 ]
Liaison statement to Working Party 1B (copy to Working Party 1A, for information) - On protection criteria for SFTS en relation to WRC-19 agenda item 9.1, issue 9.1.6 � WP 7A AI9.1 2019-05-31
[ 377 ]
List of documents issued (Documents 1B/341 - 1B/377) � BR Study Groups Department 2019-05-27
[ 376 ]
(Rev.2)
Reply liaison statement to Wokring Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near fiel) � WPs 3J, 3K, 3L and 3M 2019-05-27
[ 375 ]
Report on CISPR activities from November 2018 to May 2019 � Rapporteur, SG 1 RG on Liaison with CISPR 2019-05-27
[ 374 ]
Establishment of liaison between CISPR B and the relevant Groups in ITU-R � International Special Committee on Radio Interference 2019-05-20
[ 373 ]
Liaison statement to ITU-R on the activity of the wireless power transfer for electric vehicles in CISPR 11 standard � International Special Committee on Radio Interference 2019-05-20
[ 372 ]
Update to study on the impact of WPT-EV on the 60 KHz standard frequency and time signal service � United Kingdom of Great Britain and Northern Ireland AI9.1 2019-05-21
[ 371 ]
Modification to the PDR Recommendation ITU-R SM.2110 to reflect the outcomes of studies � United Kingdom of Great Britain and Northern Ireland AI9.1 2019-05-21
[ 370 ]
Proposed revisions to Annex 2 to Working Party 1B Chairman's Report (1B/341) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] - Assessment of impact of wireless power transmission for electric vehicle charging (WPT-EV) on radiocommunication services � European Broadcasting Union 2019-05-21
[ 369 ]
Proposed revision of the draft revision of Report ITU-R SM.2015-0 - Methods for determining national long-term strategies for spectrum utilization � Korea (Republic of) Q205/1 2019-05-21
[ 368 ]
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] � Korea (Republic of) Q210/1, AI9.1 2019-05-21
[ 367 ]
Proposal for a draft new ITU-R Question - Methodologies for Balancing between Spectrum Supply and Demand in Spectrum Management � Korea (Republic of) 2019-05-21
[ 366 ]
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTION] - [Assessment of spectrum efficiency and economic value] � Korea (Republic of) Q240/1 2019-05-21
[ 365 ]
The proposal of modification to the working document of preliminary draft new Report on the question of "Assessment of spectrum efficiency and economoic value" � China (People's Republic of) 2019-05-21
[ 364 ]
Proposed revision of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] � Japan Q210-3/1 2019-05-20
[ 363 ]
Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] � Japan AI9.1 2019-05-20
[ 362 ]
Proposal of working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] � Japan AI9.1 2019-05-20
[ 361 ]
Proposed editorial revision of thirteen Recommendations assigned to ITU-R Working Party 1B � Chairman, SG 1 CG on editorial review 2019-05-17
[ 360 ]
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1B � Chairman, SG 1 CG on editorial review 2019-05-17
[ 359 ]
Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles � Germany (Federal Republic of) Q210/1, AI901 2019-05-15
[ 358 ]
Elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] - [Regulatory considerations of wireless power transmission (WPT)] � Germany (Federal Republic of) Q210/1 2019-05-15
[ 357 ]
Elements for working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] - Emission fields in the spurious domain from WPT systems � International Amateur Radio Union (IARU) AI9.1 2019-05-15
[ 356 ]
Reply from SAE J2954 on EV WPT EMI of harmonics 9.0 kHz to 30 MHz � Director, BR 2019-05-14
[ 355 ]
Liaison statement on draft new Recommendation ITU-T D.264 on "Shared use of spectrum and telecommunication infrastructure as possible methods for enhancing the efficiency of telecommunications" � ITU-T SG 3 2019-05-10
[ 354 ]
Preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles � United States of America Q210/1 2019-05-09
[ 353 ]
Proposed suppression of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] � United States of America Q210/1 2019-05-09
[ 352 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTIONS] � United States of America Q240/1 2019-05-09
[ 351 ]
Measurements of the Man-made Noise Floor � International Amateur Radio Union 2019-05-08
[ 350 ]
Recently published ECC Report 289 on wireless power transmission (WPT) systems for electrical vehicles (EV) operating within 79-90 KHz band � Netherlands (Kingdom of the) 2019-04-24
[ 349 ]
Liaison to ITU-R on proctection of Radio Services � International Special Committee on Radio Interference 2019-04-17
[ 348 ]
Liaison statement to Working Parties 3L and 3K (copy for information to Working Parties 1A, 1B and 5A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) � WP 6A 2019-04-08
[ 347 ]
Liaison statement to Working Parties 1A and 1B (copy for information Working Parties 5A, 5B, and 7A) - Frequency use by non-beam Wireless Power Transmission (WPT) applications using inductive power transfer � WP 6A 2019-02-04
[ 346 ]
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B on economic aspects of spectrum management and sharing - ITU-D Study Group 1 Question 4/1: Economic policies and methods of determining the costs of services related to national telecommunications/information and communication technology networks, including next-generation networks � ITU-D SG 1 2019-03-26
[ 345 ]
Liaison statement on "Request to update the IoT and SC&C Standards Roadmap and the list of contact points" � JCA-IoT and SC&C 2019-01-08
[ 344 ]
Liaison statement - Evolution of magnetic field strength requirements in CISPR 14-1 � International Special Committee on Radio Interference 2018-12-21
[ 343 ]
Liaison statement on ITU inter-Sector coordination � ITU-T TSAG 2018-12-17
[ 342 ]
Liaison statement - Discussion of a work proposal on spectrum sharing � ITU-T SG 12 2018-12-07
[ 341 ]
+Ann.1-8
Report on the sixth 2015-2019 meeting of Working Party 1B (Geneva, 16-20 November 2018) � Acting Chairman, WP 1B 2018-11-20
[ 340 ]
Final list of participants Working Party 1B (Geneva, 16 - 20 November 2018) � Director, BR 2018-11-20
[ 339 ]
Liaison statement to Working Parties 1A and 1B (copy for information to ICAO) - Aeronautical radionavigation service information for Wireless Power Transmission (WPT) � WP 5B Q210/1 2018-11-16
[ 338 ]
List of documents issued (Documents 1B/303 - 1B/337) � BR Study Groups Department 2018-11-15
[ 337 ]
(Rev.1)
Report on current status of WPT issues in CISPR - June to October 2018 � SG 1 Rapp. to CISPR on WPT issues 2018-11-13
[ 336 ]
Liaison statement to Working Parties 1A and 3L (copy to Working Parties 1B, 5B and 6A) - Comments on Report ITU-R SM.[WPT_100-148.5kHz] � WP 5A 2018-11-09
[ 335 ]
Proposed modifications to Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]" � European Broadcasting Union Q210/1, AI9.1 2018-11-09
[ 334 ]
Proposed modifications to Section 3 of Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]" � European Broadcasting Union Q210/1, AI9.1 2018-11-09
Results:383 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16