International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1A� C�

ITU-R�WP1A

Spectrum Engineering Techniques

Results:466 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 466 ]
Liaison statement on work being carried out under study in ITU-T Q3/5 � ITU-T SG 5 2019-10-15
[ 465 ]
Liaison statement on EMC standards and limits - Further cooperation on reducing EMI and RF noise � ITU-T SG 5 2019-10-15
[ 464 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services � ITU-D SG 1 2019-10-02
[ 463 ]
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Party 1A) - Determination of the G.9710 standard (ex G.mgfast-PSD) � WP 6A 2019-07-29
[ 462 ]
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database � WP 6A Q32/6 2019-07-29
[ 461 ]
Liaison statement on the new version of the Home Network Transport (HNT) standards over view and work plan � ITU-T SG 15 2019-07-22
[ 460 ]
Liaison statement on the determined G.9710 (ex G.MGFAST-PSD) (reply to ITU-R LS15 and LS32) � ITU-T SG 15 2019-07-22
[ 459 ]
Reply liaison statement to Working Party 1A - Characteristics of terrestrial IMT systems for studies on the impact of WPT-Beam on IMT systems � WP 5D 2019-07-22
[ 458 ]
Reply liaison statement to CISPR (copy to ITU-R Working Parties 1A, 5A, 5B, 6A and 7A) - Establishment of liaison between CISPR-B and the relevant groups in ITU-R � SG 1 2019-06-21
[ 457 ]
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer � WP 1B 2019-06-17
[ 456 ]
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5 � ITU-T SG 5 2019-06-14
[ 455 ]
Liaison statement to Working Party 5D (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas � WP 1C 2019-06-13
[ 454 ]
+Ann.1-15
Report on the sixth 2015-2019 meeting of Working Party 1A (Geneva, 28 May - 5 June 2019) � Chairman, WP 1A 2019-06-05
[ 453 ]
Final list of participants - Working Party 1A (Geneva, 28 May - 5 June 2019) � Director, BR 2019-06-05
[ 452 ]
Liaison statement to Working Party 1B (copy to Working Party 1A, for information) - On protection criteria for SFTS en relation to WRC-19 agenda item 9.1, issue 9.1.6 � WP 7A 2019-05-31
[ 451 ]
Reply liaison statement to Working Party 1A (copy to ITU-R WP 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors � WP 7C 2019-05-31
[ 450 ]
Liaison statement ceoncerning document ITU-R SM.2351-2 and the work of ITU-T Q18/5 in smart grid networks � ITU-T SG 15 2019-05-30
[ 449 ]
(Rev.1)
Reply liaison statement to Working Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near field) � WPs 3J, 3K, 3L and 3M 2019-05-28
[ 448 ]
List of documents issued (Documents 1A/340 - 1A/448) � BR Study Groups Department 2019-05-27
[ 447 ]
Liaison statement to Working Party 5A (copy to Working Party 1A) - Working document toward a preliminary draft revision of Report ITU-R M.2417-0 � WPs 3J, 3K and 3M 2019-05-27
[ 446 ]
Report on CISPR activities from November 2018 to May 2019 � Rapporteur, SG 1 RG on Liaison with CISPR 2019-05-27
[ 445 ]
Reply liaison statement to Working Party 1A - Recommendation ITU-R P.620-7 � SG 3 2019-05-27
[ 444 ]
Establishment of liaison between CISPR B and the relevant Groups in ITU-R � International Special Committee on Radio Interference 2019-05-20
[ 443 ]
Liaison statement to ITU-R on the activity of the Wireless Power Transfer at A Distance (WPTAAD) in CISPR 11 standard � International Special Committee on Radio Interference 2019-05-20
[ 442 ]
Liaison statement to ITU-R on the activity of the wireless power transfer for electric vehicles in CISPR 11 standard � International Special Committee on Radio Interference 2019-05-20
[ 441 ]
Update to study on the impact of WPT-EV on the 60 KHz standard frequency and time signal service � United Kingdom of Great Britain and Northern Ireland 2019-05-21
[ 440 ]
Modification to the PDR Recommendation ITU-R SM.2110 to reflect the outcomes of studies � United Kingdom of Great Britain and Northern Ireland AI9.1 2019-05-21
[ 439 ]
Comments on the Working Party 1A Chairman's Report relating to Appendix 7 and the revision of Recommendation ITU-R SM.1448-0 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � United Kingdom of Great Britain and Northern Ireland 2019-05-21
[ 438 ]
Recent developments concerning coexistence of wired telecommunication with radiocommunication systems (Question ITU-R 221/1 and ITU-R 236/1) � Rapporteur, RG wired and radio Q236/1, Q221/1 2019-05-21
[ 437 ]
Proposed modification of a preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems � Korea (Republic of) Q210/1, AI9.1 2019-05-21
[ 436 ]
Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 - Smart grid utility management systems � Korea (Republic of) 2019-05-21
[ 435 ]
Optical wireless communication for broadband communications � Netherlands (Kingdom of the) , Korea (Republic of) 2019-05-21
[ 434 ]
Application of the CISPR TR 16-4-4 model in setting limits for radiated emissions in CISPR standards � European Broadcasting Union 2019-05-21
[ 433 ]
Real interference to DAB radio from LED lighting � European Broadcasting Union 2019-05-21
[ 432 ]
EBU comments to CISPR 16-4-4 model used to develop emission limits � European Broadcasting Union 2019-05-21
[ 431 ]
Proposed improvement to preliminary draft revision of Recommendation ITU-R SM.2110-0 � China (People's Republic of) 2019-05-21
[ 430 ]
Draft revision of Report ITU-R SM.2351-2 - Smart grid utility management systems (Question ITU-R 236-3/1) � Huawei Technologies Co. Ltd. Q236/1 2019-05-21
[ 429 ]
Internet of radio-light architecture for media and entertainment in buildings � China (People's Republic of) 2019-05-21
[ 428 ]
Preliminary draft revision to Report ITU-R SM.2422-0 - Visible light for broadband communications � China (People's Republic of) 2019-05-21
[ 427 ]
Introduction to Hybrid PLC-VLC system � China (People's Republic of) 2019-05-21
[ 426 ]
Working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency wide-beam � Japan Q210-3/1 2019-05-20
[ 425 ]
Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] � Japan AI9.1 2019-05-20
[ 424 ]
Proposal of working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] � Japan AI9.1 2019-05-20
[ 423 ]
Proposed revision to Report ITU-R SM.2352-0 - Technology trends of active services in the frequency range 275-3 000 GHz � Japan 2019-05-20
[ 422 ]
Proposed draft new Report ITU-R SM.[275-450GHz_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz � Japan AI1.15 2019-05-20
[ 421 ]
Proposed amendments to the preliminary draft new Report ITU-R SM.[275-450GHz_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz � Canada 2019-05-18
[ 420 ]
Working document towards a preliminary draft new ITU-R Report - Evaluation of radiated electromagnetic disturbances of household appliances and their interferences over an IoT network � Brazil (Federative Republic of) 2019-05-17
[ 419 ]
Technical characteristics and impact analyses of non-beam inductive wireless power transmission (WPT) for mobile devices � British Broadcasting Corporation (BBC) 2019-05-17
[ 418 ]
Proposed editorial revision of thirty one Recommendations assigned to Working Party 1A � Chairman, SG 1 CG on editorial review 2019-05-17
[ 417 ]
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1A � Chairman, SG 1 CG on editorial review 2019-05-17
Results:466 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-15