Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 123 ]
�
� |
Question ITU-R 228-3/3 - Propagation data required for the planning of radiocommunication systems operating above 275 GHz
�
� |
SG 3
� |
� |
2019-08-22 |
|
[ 122 ]
�
� |
Note to Study Group 5 (copy to Study Groups 4, 6 and 7) - Coordination among Study Groups and Working Parties
�
� |
WP 5D
� |
� |
2019-07-22 |
|
[ 121 ]
�
(Rev.1)� |
Summary Report of actions taken during the meetings of Radiocommunication Study Group 7 (Geneva, 5 June 2019)
�
� |
Chairman, SG 7
� |
� |
2019-06-05 |
|
[ 120 ]
�
� |
Final List of Participants - Study Group 7 (Geneva, 5 June 2019)
�
� |
Director, BR
� |
� |
2019-06-05 |
|
[ 119 ]
�
� |
List of documents issued (Documents 7/105 - 7/119)
�
� |
Chairman, SG 7
� |
� |
2019-06-04 |
|
[ 118 ]
�
� |
Executive Report on May 2019 meeting of Working Party 7D (28-31 May 2019)
�
� |
WP 7D
� |
� |
2019-06-04 |
|
[ 117 ]
�
� |
Executive Report on the May-June 2019 meeting of Working Party 7B (29 May - 4 June 2019)
�
� |
WP 7B
� |
� |
2019-06-04 |
|
[ 116 ]
�
� |
Executive Report on the May/June 2019 meeting of Working Party 7C (29 May - 4 June 2019)
�
� |
WP 7C
� |
� |
2019-06-04 |
|
[ 115 ]
�
(Rev.1)� |
New Report ITU-R RS.[SPACE_WEATHER_SENSORS] - Space weather sensor systems using radio spectrum
�
� |
WP 7C
� |
� |
2019-06-04 |
|
[ 114 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SA.[IMT-EES/SRS COORDINATION] - Methodologies for calculating coordination zones around EESS and SRS earth stations to avoid harmful interference from IMT-2020 systems in the frequency bands 25.5-27 GHz and 37-38 GHz
�
� |
WP 7B
� |
� |
2019-06-03 |
|
[ 113 ]
�
� |
Executive Report on May 2019 meeting of Working Party 7A (June 2019)
�
� |
WP 7A
� |
� |
2019-06-03 |
|
[ 112 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1027-5
�
� |
WP 7B
� |
� |
2019-06-03 |
|
[ 111 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1164-3 - Sharing and coordination criteria for service links in data collection systems using GSO satellites in the Earth exploration-satellite and meteorological-satellite services
�
� |
WP 7B
� |
� |
2019-06-03 |
|
[ 110 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1161-2 - Sharing and coordination criteria for data transmission systems in the Earth exploration-satellite and meteorological-satellite services using satellites in geostationary orbit
�
� |
WP 7B
� |
� |
2019-06-03 |
|
[ 109 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SA.1016
�
� |
WP 7B
� |
� |
2019-05-31 |
|
[ 108 ]
�
(Rev.1)� |
New Report ITU-R RA.[COEXISTENCE] - Coexistence between the radio astronomy service and radiolocation service applications in the frequency band 76-81 GHz (Resolution 759 (WRC-15))
�
� |
WP 7D
� |
� |
2019-05-31 |
|
[ 107 ]
�
� |
Note to Study Group 7
�
� |
Chairman, WP 7A
� |
� |
2019-05-01 |
|
[ 106 ]
�
� |
Liaison statement on ITU inter-Sector coordination
�
� |
ITU-T TSAG
� |
� |
2018-12-17 |
|
[ 105 ]
�
� |
Summary Report of actions taken during the meetings of Radiocommunication Study Group 7 (Geneva, 18 and 26 September 2018)
�
� |
Vice-Chairman, SG 7
� |
� |
2018-09-26 |
|
[ 104 ]
�
� |
Final List of Participants - Study Group 7 (Geneva, 18 & 26 September 2018)
�
� |
Director, BR
� |
� |
2018-09-26 |
|
[ 103 ]
�
(Rev.1)� |
New Report ITU-R RS.[VHF SOUNDER] - Preliminary results of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range
�
� |
WP 7C
� |
AI2.2
� |
2018-09-25 |
|
[ 102 ]
�
� |
Draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-450 GHz
�
� |
WP 7C
� |
AI1.15
� |
2018-09-25 |
|
[ 101 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.364-5 - Preferred frequencies and bandwidths for manned and unmanned near-Earth research satellites
�
� |
WP 7B
� |
� |
2018-09-25 |
|
[ 100 ]
�
� |
Draft new Report ITU-R SA.[400 MHZ-LIMITS] - Technical studies for establishing in-band power limits for earth stations operating in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and MetSat services
�
� |
WP 7B
� |
� |
2018-09-25 |
|
[ 99 ]
�
� |
Draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations
�
� |
WP 7B
� |
AI1.7
� |
2018-09-25 |
|
[ 98 ]
�
� |
Draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT (space-to-Earth) to primary and addition of primary allocation to EESS (space-to-Earth)
�
� |
WP 7B
� |
� |
2018-09-25 |
|
[ 97 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R TF.[RELATIVISTIC] - Relativistic Time Transfer
�
� |
WP 7A
� |
� |
2018-09-25 |
|
[ 96 ]
�
� |
Draft revision of Report ITU-R RA.2189 - Sharing between the radio astronomy service and active services in the frequency range 275-3 000 GHZ
�
� |
WP 7D
� |
� |
2018-09-25 |
|
[ 95 ]
�
� |
Draft new Report ITU-R RA.[DISTRIB_RAS_REG] - Parameters needed for the registration of distributed radio astronomy systems
�
� |
WP 7D
� |
Q252/7
� |
2018-09-25 |
|
[ 94 ]
�
(Rev.1)� |
List of documents issued (Documents 7/65 - 7/103)
�
� |
BR Study Groups Department
� |
� |
2018-09-17 |
|
[ 93 ]
�
� |
Status of ITU-R Questions assigned to Study Group 7 - September 2018
�
� |
Vice-Chairman, SG 7
� |
� |
2018-09-14 |
|
[ 92 ]
�
� |
Executive Report on the October 2017 and May 2018 meetings of Working Party 7C (25 - 31 October 2017 and 14 - 18 May 2018)
�
� |
WP 7C
� |
� |
2018-09-11 |
|
[ 91 ]
�
� |
Executive Report on the October 2017 and May 2018 meetings of Working Party 7D (24 - 27 October 2017 and 14 - 18 May 2018)
�
� |
WP 7D
� |
� |
2018-09-10 |
|
[ 90 ]
�
� |
Proposed addition to draft new Report ITU-R SA.[SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in space operation service below 1 GHz for non-GSO satellites with short duration missions
�
� |
United States of America
� |
� |
2018-09-10 |
|
[ 89 ]
�
� |
Executive Report on the October 2017 and May 2018 meetings of Working Party 7B (25 - 31 October 2017 and 14 - 18 May 2018)
�
� |
WP 7B
� |
� |
2018-09-07 |
|
[ 88 ]
�
� |
Executive Report on the October 2017 and May 2018 meeting of Working Party 7A (September 2018)
�
� |
Chairman, WP 7A
� |
� |
2018-09-07 |
|
[ 87 ]
�
� |
Report on the status of TWO SG 7 Handbooks, on RS Recommendations and RS Reports
�
� |
Vice-Chairman SG 7
� |
� |
2018-09-07 |
|
[ 86 ]
�
� |
Status of SA series of Reports
�
� |
Vice-Chairman SG 7
� |
� |
2018-09-07 |
|
[ 85 ]
�
� |
Status of the Handbook on space research communication and the SA-series of ITU-R Recommendations
�
� |
Vice-Chairman, SG 7
� |
� |
2018-09-05 |
|
[ 84 ]
�
� |
Liaison statement on new ITU-T SG2 terms and definitions
�
� |
SCV
� |
� |
2018-07-16 |
|
[ 83 ]
�
(Rev.2)� |
Draft revision of Recommendation ITU-R RS.1859-0 - Use of remote sensing systems for data collections to be used in the event of natural disasters and similar emergencies
�
� |
WP 7C
� |
� |
2018-06-12 |
|
[ 82 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof
�
� |
WP 7C
� |
� |
2018-06-12 |
|
[ 81 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RS.2042-0 - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band
�
� |
WP 7C
� |
AI2.2
� |
2018-05-31 |
|
[ 80 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RS.1263-1 - Interference criteria for meteorological aids operated in the 400.15-406 MHz and 1 668.4-1 700 MHz bands
�
� |
WP 7C
� |
� |
2018-05-31 |
|
[ 79 ]
�
(Rev.1)� |
Draft revised Recommendation ITU-R RS.1165-2 - Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands
�
� |
WP 7C
� |
� |
2018-05-31 |
|
[ 78 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1164-2 - Sharing and coordination criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services
�
� |
WP 7B
� |
� |
2018-05-24 |
|
[ 77 ]
�
(Rev.1)� |
Draft revision to Recommendation ITU-R SA.1163-2 - Interference criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services
�
� |
WP 7B
� |
� |
2018-05-24 |
|
[ 76 ]
�
� |
Liaison statement invitation to update the information in the IMT 2020 roadmap
�
� |
Chairman, ITU-T (JCA-IMT2020)
� |
� |
2018-03-06 |
|
[ 75 ]
�
� |
Liaison statement on the results of the 1st meeting of the ITU-T Focus Group on machine learning for future networks including 5G (FG ML5G)
�
� |
ITU-T FG ML5G
� |
� |
2018-02-08 |
|
[ 74 ]
�
� |
Liaison statement - New ITU-T Study Group 13 terms and definitions
�
� |
ITU-R CCV, ITU-T SCV
� |
� |
2018-02-09 |
Results:123 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):