Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 233 ]
�
� |
Report ITU-R BT.2470-0 - Use of Monte Carlo simulation to model interference to DTTB
�
� |
SG 6
� |
� |
2019-10-10 |
|
[ 232 ]
�
� |
Liaison statement on the definition of broadband access
�
� |
SCV
� |
� |
2019-08-26 |
|
[ 231 ]
�
� |
Liaison statement on results fo ITU's work on machine learning for 5G networks
�
� |
ITU-T FG ML5G
� |
� |
2019-08-26 |
|
[ 230 ]
�
� |
Question ITU-R 228-3/3 - Propagation data required for the planning of radiocommunication systems operating above 275 GHz
�
� |
SG 3
� |
� |
2019-08-22 |
|
[ 229 ]
�
� |
Liaison statement to CISPR (copy for infromation to Study Group 1 and Working Parties 1A, 5A, 5B and 7A) - Update to broadcasting services protection requirements in the CISPR radio sevices database
�
� |
WP 6A
� |
Q32/6
� |
2019-07-29 |
|
[ 228 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) standards over view and work plan
�
� |
ITU-T SG 15
� |
� |
2019-07-22 |
|
[ 227 ]
�
� |
Liaison statemen to TSAG, ITU-D Sector and ITU-R Sector on inter-Sector Coordination (reply to TSAG-LS 13, ITU-D SG1RGQ/120 (Rev.1)-E, ITU-D SG2RGQ/107 (Rev.1)-E and ITU-R SG 6-LS 28)
�
� |
ITU-T SG 15
� |
� |
2019-07-22 |
|
[ 226 ]
�
+Ann.1-2� |
Summary Record of the meeting of Radiocommunication Study Group 1 (6 - 7 June 2019)
�
� |
Chairman, SG 1
� |
� |
2019-06-12 |
|
[ 225 ]
�
� |
Final list of participants - Study Group 1 (Geneva, 6-7 June 2019)
�
� |
Director, BR
� |
� |
2019-06-07 |
|
[ 224 ]
�
� |
List of documents issued (Documents 1/158 - 1/224)
�
� |
BR Study Groups Department
� |
� |
2019-06-06 |
|
[ 223 ]
�
� |
Preliminary draft revision of ITU-R Resolutions
�
� |
Chairman, SG 1
� |
� |
2019-06-05 |
|
[ 222 ]
�
� |
Executive Report on the May-June 2019 meeting of Working Party 1B (Geneva, 28 May - 5 June 2019)
�
� |
Chairman, WP 1B
� |
� |
2019-06-05 |
|
[ 221 ]
�
� |
Executive Report on the November 2018 meeting of Working Party 1B (Geneva, 16-20 November 2018)
�
� |
Chairman, WP 1B
� |
� |
2019-06-05 |
|
[ 220 ]
�
� |
Executive Report on the May-June 2019 meeting of Working Party 1C (Geneva, 28 May - 5 June 2019)
�
� |
Chairman, WP 1C
� |
� |
2019-06-05 |
|
[ 219 ]
�
(Rev.1)� |
Executive Report on the May-June 2019 meeting of Working Party 1A (Geneva, 28 May - 5 June 2019)
�
� |
Chairman, WP 1A
� |
� |
2019-06-05 |
|
[ 218 ]
�
� |
Draft reply liaison statement from ITU-R Study Group 1 to CISPR (copy to ITU-R Working Parties 5A, 5B, 6A and 7A) - Establishment of Liaison between CISPR-B and the relevant groups in ITU-R
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 217 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 216 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SM.[WPT_MOBILE] - Guidance on frequency ranges for operation of non-beam wireless power transmission systems for mobile and portable devices
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 215 ]
�
(Rev.1)� |
Revision to Report ITU-R SM.2422-0 - Visible light for broadband communications
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 214 ]
�
(Rev.1)� |
New Report ITU-R SM.2451-0 (WPT_EV_IMPACT) - Assessment of impact of wireless power transmission for electric vehicle charging (WPT-EV) on radiocommunication services
�
� |
WP 1B
� |
� |
2019-06-05 |
|
[ 213 ]
�
� |
Draft reply liaison statement from ITU-R Study Group 1 to ITU-T Study Group 3 (copy to the Director of the Radiocommunciation Bureau for communication to the Director of the Telecommunication Standardization Bureau) (copy to ITU-R Working Parties 5A and 5D for information) - Comments on draft new Recommendation ITU-T D.264 (D.SpectrumShare)
�
� |
WP 1B
� |
� |
2019-06-05 |
|
[ 212 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1875-2 - DVB-T/T2 coverage measurements and comparison with coverage predictions
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 211 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2257-4 - Spectrum management and monitoring during major events
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 210 ]
�
(Rev.1)� |
New Report ITU-R SM.2454-0 (MEAS-GNSS) - Spectrum monitoring techniques in the RNSS frequency bands
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 209 ]
�
(Rev.1)� |
New Report ITU-R SM.2453-0 (SAT MON COOPERATION) - Cooperation in the field of space radio monitoring
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 208 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 207 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2355-0 - Spectrum monitoring evolution
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 206 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1268-4 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations
�
� |
WP 1C
� |
� |
2019-06-05 |
|
[ 205 ]
�
(Rev.1)� |
New Report ITU-R SM.2450-0 (275-450GHz_SHARING) - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
�
� |
WP 1A
� |
AI1.15
� |
2019-06-05 |
|
[ 204 ]
�
� |
Editorial update of twenty nine Recommendations assigned to ITU-R Working Party 1A
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 203 ]
�
� |
Comments on format to the ITU-R Recommendations assigned to ITU-R Working Party 1A
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 202 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1138-2 - Determination of necessary bandwidths including examples for their calculation and associated examples for the designation of emissions
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 201 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R SM.1448-0 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 200 ]
�
� |
Supplement on the maintenance of Recommendation ITU-R SM.1448
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 199 ]
�
� |
Draft Note from the Chairman of Study Group 1 to the Director of the Radiocommunication Bureau - Update on the inconsistencies in Appendix 7 (Rev.WRC-15) as listed in Annex 14 to Document 1A/340
�
� |
WP 1A
� |
� |
2019-06-05 |
|
[ 198 ]
�
(Rev.1)� |
New Report ITU-R SM.2449-0 (WPT_100-148.5KHZ) - Technical characteristics and impact analyses of non-beam inductive Wireless Power Transmission (WPT) for mobile and portable devices charging on radiocommunication services
�
� |
WP 1A
� |
Q210/1
� |
2019-06-05 |
|
[ 197 ]
�
� |
Preliminary draft of the Study Group 1 Chairman's Report to RA-19 - Spectrum management
�
� |
Chairman, SG 1
� |
� |
2019-06-05 |
|
[ 196 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2182-2 - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
�
� |
WP 1C
� |
� |
2019-06-04 |
|
[ 195 ]
�
(Rev.1)� |
Revision of Report ITU-R SM.2015-0 - Methods for determining national long-term strategies for spectrum utilization
�
� |
WP 1B
� |
� |
2019-06-03 |
|
[ 194 ]
�
� |
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1C
�
� |
WP 1C
� |
� |
2019-06-03 |
|
[ 193 ]
�
� |
Proposed editorial revision to the ITU-R Recommendations assigned to ITU-R Working Party 1B
�
� |
WP 1B
� |
� |
2019-06-03 |
|
[ 192 ]
�
(Rev.1)� |
Draft new Question ITU-R [SPEC-AVAILABILITY]/1 - Methodologies for assessing or predicting spectrum availability
�
� |
WP 1B
� |
� |
2019-06-03 |
|
[ 191 ]
�
� |
Draft reply liaison statement from ITU-R Study Group 1 to ITU-T Study Group 12 (copy to the Director of the Radiocommunication Bureau for communication to the Director of the Telecommuication Standardization Bureau) - Comments on Licensed Spectrum Sharing
�
� |
WP 1B
� |
� |
2019-06-03 |
|
[ 190 ]
�
(Rev.1)� |
Revision to Report ITU-R SM.2153-6 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
�
� |
WP 1B
� |
� |
2019-06-03 |
|
[ 189 ]
�
(Rev.1)� |
New Report ITU-R SM.2452-0 (EMF-MON) - Electromagnetic field measurements to assess human exposure
�
� |
WP 1C
� |
Q239/1
� |
2019-06-03 |
|
[ 188 ]
�
� |
Editorial update of twenty eight Recommendations assigned to ITU-R Working Party 1C
�
� |
WP 1C
� |
� |
2019-06-03 |
|
[ 187 ]
�
� |
Report on CISPR activities from November 2018 to May 2019
�
� |
Rapporteur, SG 1 RG on Liaison with CISPR
� |
� |
2019-05-27 |
|
[ 186 ]
�
� |
Establishment of liaison between CISPR B and the relevant Groups in ITU-R
�
� |
International Special Committee on Radio Interference
� |
� |
2019-05-20 |
|
[ 185 ]
�
� |
Report of ITU-R Study Group 1 Correspondence Group on editorial review and maintenance ITU-R Recommendations, Reports and Questions assigned to the Study Group 1
�
� |
Chairman, SG 1 CG on editorial review
� |
� |
2019-05-17 |
|
[ 184 ]
�
� |
Liaison statement on draft new Recommendation ITU-T D.264 on "Shared use of spectrum and telecommunication infrastructure as possible methods for enhancing the efficiency of telecommunications"
�
� |
ITU-T SG 3
� |
� |
2019-05-10 |
Results:233 total items. Result page:�
1 -
2 -
3 -
4 -
5
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):