Contributions�� |
�
|
Number�
|
Title
|
Source
|
Date
|
|
[ 103 ]
�
� |
Summary Report of the sixth plenary meeting of the Radiocommunication Assembly
�
� |
Chairman, RA-15
� |
2015-11-11 |
|
[ 102 ]
�
� |
Summary Report of the fifth plenary meeting of the Radiocommunication Assembly -
Friday, 30 October 2015, at 09:00 hours
�
� |
Chairman, RA-15
� |
2015-11-10 |
|
[ 101 ]
�
� |
Summary Report of the fourth plenary meeting of the Radiocommunication Assembly - Thursday, 29 October 2015, at 14 00 hours
�
� |
Chairman, RA-15
� |
2015-11-10 |
|
[ 100 ]
�
(Rev.1)� |
Summary Report of the third plenary meeting of the Radiocommunication Assembly - Thursday, 29 October 2015, at 10 00 hours
�
� |
Chairman, RA-15
� |
2015-11-05 |
|
[ 99 ]
�
� |
Summary Report of the second plenary meeting of the Radiocommunication Assembly -
Tuesday, 27 October 2015, at 1400 hours
�
� |
Chairman, RA-15
� |
2015-11-05 |
|
[ 98 ]
�
� |
Draft revision of Resolution ITU-R 1-6 - Working methods for the Radiocommunication Assembly, the Radiocommunication Study Groups, and the Radiocommunication Advisory Group
�
� |
Convenor, Ad-hoc on Res. ITU-R 1
� |
2015-10-29 |
|
[ 97 ]
�
� |
Draft new Recommendation ITU R M.[AMS(R)S.METHODOLOGY]-0 - Methodology to calculate spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space) for aeronautical mobile-satellite (R) service communications related to the priority categories 1 to 6 of Article 44 of the Radio Regulations
�
� |
Chairman, SG 4
� |
2015-10-29 |
|
[ 96 ]
�
� |
List of ITU-R Resolutions (RA-15)
�
� |
BR Secretariat
� |
2015-10-29 |
|
[ 95 ]
�
� |
Text to be included in the Report from RA-15 to WRC-15
�
� |
COM 4
� |
2015-10-29 |
|
[ 94 ]
�
� |
Draft Report of the Budget Control Committee to the Plenary Meeting
�
� |
Budget Control Committee
� |
2015-10-29 |
|
[ 93 ]
�
� |
Draft new Recommendation ITU-R M.[BSMS700] - Specific unwanted emission limit of IMT mobile stations operating in the frequency band 694-790 MHz to facilitate protection of existing services in Region 1 in the frequency band 470-694 MHz
�
� |
Chairman, Ad-hoc Group Plen 1 (M Series Recs)
� |
2015-10-29 |
|
[ 92 ]
�
� |
Draft revision of Recommendation ITU-R M.1036-4 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RR)
�
� |
Chairman, Ad-hoc Group Plen 1 (M Series Recs)
� |
2015-10-29 |
|
[ 91 ]
�
� |
Draft new Resolution ITU-R XX - Development and deployment of international public telecommunications via satellite in developing countries
�
� |
COM 4
� |
2015-10-28 |
|
[ 90 ]
�
� |
Draft new Resolution ITU-R [UNAUTHORIZED SERVICE PROVISION] - Guidelines for the management of unauthorized operation of earth station terminals
�
� |
COM 4
� |
2015-10-28 |
|
[ 89 ]
�
� |
Draft new Resolution ITU-R [IoT] - Studies related to wireless systems and applications for the development of the Internet of Things (IoT)
�
� |
COM 4
� |
2015-10-28 |
|
[ 88 ]
�
� |
Note by the Secretary-General - Financial statement of the Radiocommunication Assembly (RA 15) as at 28 October 2015
�
� |
Secretary-General
� |
2015-10-28 |
|
[ 87 ]
�
� |
Draft revision of Resolution ITU-R 6-1 - Liaison and collaboration with the ITU Telecommunication Standardization Sector
�
� |
COM 5
� |
2015-10-28 |
|
[ 86 ]
�
� |
Draft new Report ITU-R M.[VDES] - Technical characteristics for a VHF data exchange system in the VHF maritime mobile band
�
� |
Editorial Group for Document 5/1007
� |
2015-10-28 |
|
[ 85 ]
�
� |
Draft revision of Resolution ITU-R 1-6 - Working methods for the Radiocommunication Assembly, the Radiocommunication Study Groups, and the Radiocommunication Advisory Group
�
� |
COM 5
� |
2015-10-28 |
|
[ 84 ]
�
� |
Draft revision of Resolution ITU-R 5-6 (body text) - Work programme and Questions of Radiocommunication Study Groups
�
� |
COM 5
� |
2015-10-28 |
|
[ 83 ]
�
� |
Draft revision of Resolution ITU-R 43 - Rights of Associates
�
� |
COM 5
� |
2015-10-28 |
|
[ 82 ]
�
� |
Draft revision of Resolution ITU-R 5-6 (Annexes) - Work programme and Questions of Radiocommunication Study Groups
�
� |
COM 4
� |
2015-10-28 |
|
[ 81 ]
�
� |
Draft new Question ITU-R [EUR/VISIBLE LIGHT] - Characteristics for use of visible light for broadband communications
�
� |
COM 4
� |
2015-10-28 |
|
[ 80 ]
�
� |
Draft revision to Resolution ITU-R 60 - Reduction of energy consumption for environmental protection and mitigating climate change by use of ICT/radiocommunication technologies and systems
�
� |
COM 4
� |
2015-10-28 |
|
[ 79 ]
�
� |
Draft revision of Resolution ITU-R 59 - Studies on availability of frequency bands and/or tuning ranges1 for worldwide and/or regional harmonization and conditions for their use by terrestrial electronic news gathering systems
�
� |
COM 4
� |
2015-10-28 |
|
[ 78 ]
�
� |
Draft revision of Resolution ITU-R 40-3 - Worldwide databases of terrain height and surface features
�
� |
COM 4
� |
2015-10-28 |
|
[ 77 ]
�
� |
Proposed suppression of Resolution ITU-R 53-1 - The use of radiocommunications in disaster response and relief
�
� |
COM 4
� |
2015-10-28 |
|
[ 76 ]
�
� |
Draft new Resolution ITU-R [EUR/SMALL SAT] - Improving the dissemination of knowledge concerning the applicable regulatory procedures for small satellites, including nanosatellites and picosatellites
�
� |
COM 4
� |
2015-10-28 |
|
[ 75 ]
�
� |
Draft new Resolution (Geneva, 2015) - Telecommunication/ICT accessibility for persons with disabilities and persons with specific needs
�
� |
COM 4
� |
2015-10-28 |
|
[ 74 ]
�
� |
Draft revision to Resolution ITU-R 55-1 - ITU studies of disaster prediction, detection, mitigation and relief
�
� |
COM 4
� |
2015-10-28 |
|
[ 73 ]
�
� |
Draft revision to Resolution ITU-R 9-4 - Liaison and collaboration with other relevant organizations, in particular ISO, IEC and CISPR
�
� |
COM 5
� |
2015-10-28 |
|
[ 72 ]
�
� |
Draft revision to Resolution ITU-R 2-6 - Conference Preparatory Meeting
�
� |
COM 5
� |
2015-10-28 |
|
[ 71 ]
�
� |
Draft new Resolution ITU-R [IOT] - Studies related to wireless systems and applications for the development of the Internet of Things (IoT)
�
� |
WG 4C
� |
2015-10-28 |
|
[ 70 ]
�
� |
Draft new Resolution ITU-R XX - Development and deployment of international public telecommunications via satellite in developing countries
�
� |
WG 4C
� |
2015-10-28 |
|
[ 69 ]
�
� |
Draft new Resolution ITU-R [UNAUTHORIZED SERVICE PROVISION] - Guidelines for the management of unauthorized operation of earth station terminals
�
� |
WG 4C
� |
2015-10-28 |
|
[ 68 ]
�
� |
Summary Report of the first plenary meeting of the Radiocommunication Assembly - Monday, 26 October 2015, 10:45 to 11:45 hours
�
� |
Chairman, RA-15
� |
2015-10-28 |
|
[ 67 ]
�
� |
Draft revision of Resolution ITU R 1-6 - Working methods for the Radiocommunication Assembly, the Radiocommunication Study Groups, and the Radiocommunication Advisory Group
�
� |
WG 5A
� |
2015-10-28 |
|
[ 66 ]
�
� |
Draft revision of Resolution ITU R 5-6 (body text) - Work programme and Questions of Radiocommunication Study Groups
�
� |
WG 5A
� |
2015-10-27 |
|
[ 65 ]
�
� |
Draft revision of Resolution ITU R 43 - Rights of Associates
�
� |
WG 5A
� |
2015-10-27 |
|
[ 64 ]
�
� |
Draft new Resolution (GENEVA, 2015) - Telecommunication/ICT accessibility for persons with disabilities and persons with specific needs
�
� |
WG 4C
� |
2015-10-27 |
|
[ 63 ]
�
� |
Draft new Resolution ITU-R [EUR/SMALL SAT] - Improving the dissemination of knowledge concerning the applicable regulatory procedures for small satellites, including nanosatellites and picosatellites
�
� |
WG 4C
� |
2015-10-27 |
|
[ 62 ]
�
� |
Draft new Recommendation ITU-R M.[AMS CHAR 15GHZ] - Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range 14.5 15.35 GHz
�
� |
Convenor, Ad-hoc Group Plen -15 GHz
� |
2015-10-27 |
|
[ 61 ]
�
� |
Draft revision of Resolution ITU R 5-6 (Annexes) - Work programme and Questions of Radiocommunication Study Groups
�
� |
WG 4A
� |
2015-10-27 |
|
[ 60 ]
�
� |
Proposed suppression of Resolution ITU-R 38-4 - Study of regulatory/procedural matters
�
� |
COM 5
� |
2015-10-27 |
|
[ 59 ]
�
� |
Draft revision of Resolution ITU-R 59 - Studies on availability of frequency bands and/or tuning ranges for worldwide and/or regional harmonization and conditions for their use
by terrestrial electronic news gathering2 systems
�
� |
WG 4B
� |
2015-10-27 |
|
[ 58 ]
�
� |
Proposed suppression of Resolution ITU-R 63 - Admission of Academia, Universities and their associated research establishments to participate in the work of ITU-R
�
� |
COM 5
� |
2015-10-27 |
|
[ 57 ]
�
� |
Draft new Question ITU-R [EUR/VISIBLE LIGHT] - Characteristics for use of visible light for broadband communications
�
� |
WG 4A
� |
2015-10-27 |
|
[ 56 ]
�
� |
Proposed suppression of Resolution ITU-R 33-3 - Preparation of texts on terminology
�
� |
COM 5
� |
2015-10-27 |
|
[ 55 ]
�
� |
Draft revision of Resolution ITU-R 55-1 - ITU studies of disaster prediction, detection, mitigation and relief
�
� |
WG 4B
� |
2015-10-27 |
|
[ 54 ]
�
� |
Draft revision to Resolution ITU-R 60 - Reduction of energy consumption for environmental protection and mitigating climate change by use of ICT/radiocommunication technologies and systems
�
� |
WG 4B
� |
2015-10-27 |
Results:103 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):