Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 83 ]
�
� |
Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain
�
� |
SG 1
� |
� |
2015-10-12 |
|
[ 82 ]
�
� |
Recommendation ITU-R F.758-6 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
�
� |
SG 5
� |
� |
2015-10-12 |
|
[ 81 ]
�
� |
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam
�
� |
WP 6A
� |
� |
2015-08-03 |
|
[ 80 ]
�
� |
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 5B
� |
� |
2015-07-20 |
|
[ 79 ]
�
� |
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
�
� |
WP 5C
� |
� |
2015-07-16 |
|
[ 78 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.8
�
� |
WP 4A
� |
� |
2015-07-01 |
|
[ 77 ]
�
� |
Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
�
� |
WP 4C
� |
� |
2015-06-23 |
|
[ 76 ]
�
� |
Liaison statement to Working Parties 1B, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 1A
� |
� |
2015-06-23 |
|
[ 75 ]
�
� |
Draft revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)
�
� |
SG 7
� |
� |
2015-05-27 |
|
[ 74 ]
�
+Ann.1� |
Report of the meeting of Working Party 7A (Geneva, 20-25 May 2015)
�
� |
Chairman, WP 7A
� |
� |
2015-05-25 |
|
[ 73 ]
�
� |
Final list of participants - Working Party 7A (20-25 May 2015)
�
� |
Director, BR
� |
� |
2015-05-25 |
|
[ 72 ]
�
� |
List of documents issued (Documents 7A/67 - 7A/72)
�
� |
BR Study Groups Department
� |
� |
2015-05-19 |
|
[ 71 ]
�
� |
Preliminary draft revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)
�
� |
Italy
� |
� |
2015-05-11 |
|
[ 70 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth
�
� |
WP 3M
� |
� |
2015-05-08 |
|
[ 69 ]
�
� |
Predicted radio signal coverage for existing standard frequency and time signal (SFTS) services operating at 40, 60 and 77.5 kHz
�
� |
United States of America
� |
244/7
� |
2015-05-05 |
|
[ 68 ]
�
� |
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2014-10-15 |
|
[ 67 ]
�
+Ann.1-3� |
Report of the meeting of Working Party 7A (Geneva, 1-7 October 2014)
�
� |
Chairman, WP 7A
� |
� |
2014-10-07 |
|
[ 66 ]
�
� |
Final list of participants - Working Party 7A (Geneva, 1-7 October 2014)
�
� |
Director, BR
� |
� |
2014-10-07 |
|
[ 65 ]
�
� |
List of documents issued (Documents 7A/56 - 7A/65)
�
� |
BR Study Groups Department
� |
� |
2014-09-30 |
|
[ 64 ]
�
� |
Contribution to the discussion on Question ITU-R 244/7 - Interference between standard frequency and time signal services operating between 20 and 90 KHz
�
� |
Japan
� |
244/7
� |
2014-09-24 |
|
[ 63 ]
�
� |
Information document on the Leap Second Issue - URSI Commission A Resolution
�
� |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
� |
� |
2014-09-24 |
|
[ 62 ]
�
� |
Information note to ITU-R Working Party 7A Question ITU-R 249/7 - Time and frequency information from "Enhanced" long range AID to navigation (eLoran)
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2014-09-23 |
|
[ 61 ]
�
� |
Preliminary draft revision of Recommendation ITU-R TF.1153-3 "The operational use of two-way satellite time and frequency transfer employing pseudorandom noise codes"
�
� |
France
,
Germany (Federal Republic of)
,
United States of America
� |
� |
2014-09-21 |
|
[ 60 ]
�
� |
Preliminary draft new Report on the ITU/BIPM workshop on the future of the International Time Scale
�
� |
United States of America
� |
� |
2014-09-21 |
|
[ 59 ]
�
� |
Working document toward preliminary draft revision of Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
�
� |
Russian Federation
� |
� |
2014-09-18 |
|
[ 58 ]
�
� |
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 57 ]
�
� |
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
�
� |
WP 5C
� |
� |
2014-05-28 |
|
[ 56 ]
�
+Ann.1-2� |
Report on the meeting of Working Party 7A (Geneva, 6-13 May 2014)
�
� |
Chairman, WP 7A
� |
� |
2014-05-13 |
|
[ 55 ]
�
� |
Final List of Participants - Working Party 7A (Geneva, 6-13 May 2014)
�
� |
Director, BR
� |
� |
2014-05-13 |
|
[ 54 ]
�
� |
List of documents issued (Documents 7A/42 - 7A/54)
�
� |
BR Study Groups Department
� |
� |
2014-05-01 |
|
[ 53 ]
�
� |
Proposed modification to the preliminary draft CPM text on WRC-15 agenda item 1.14
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2014-04-29 |
|
[ 52 ]
�
� |
Proposals on update of draft CPM text for WRC-15 agenda item 1.14
�
� |
Russian Federation
� |
� |
2014-04-28 |
|
[ 51 ]
�
� |
Report of the ITU/BIPM workshop on the future of the international time scale
�
� |
International Bureau of Weights and Measures
� |
� |
2014-04-25 |
|
[ 50 ]
�
� |
Proposed revisions to preliminary draft CPM text on WRC-15 agenda item 1.14
�
� |
Japan
� |
� |
2014-04-25 |
|
[ 49 ]
�
� |
Dissemination of two time scales in parallel
�
� |
International Bureau of Weights and Measures
,
France
� |
� |
2014-04-24 |
|
[ 48 ]
�
� |
Proposed modification to the preliminary draft CPM text on WRC-15 agenda item 1.14
�
� |
International Bureau of Weights and Measures
,
France
,
United States of America
� |
� |
2014-04-24 |
|
[ 47 ]
�
� |
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
�
� |
WP 4C
� |
� |
2014-03-24 |
|
[ 46 ]
�
� |
Report of the ninth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2013-11-01 |
|
[ 45 ]
�
� |
Future of universal time scale
�
� |
Director, BR
� |
� |
2013-10-18 |
|
[ 44 ]
�
� |
Draft revision of Recommendation ITU-R TF.374-5 - Precise frequency and time-signal transmissions
�
� |
Chairman, SG 7
� |
� |
2013-09-24 |
|
[ 43 ]
�
� |
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain
�
� |
SG 1
� |
� |
2013-09-19 |
|
[ 42 ]
�
+Ann.1-2� |
Report of the meeting of Working Party 7A (Geneva, 11-17 September 2013)
�
� |
Chairman, WP 7A
� |
� |
2013-09-18 |
|
[ 41 ]
�
� |
Final list of participants - Working Party 7A (Geneva, 11 - 17 September, 2013)
�
� |
Director, BR
� |
� |
2013-09-17 |
|
[ 40 ]
�
� |
Proposed draft Revision of Question ITU-R 236/7 - The future of the UTC time scale
�
� |
Chairman, WP 7A
� |
236/7
� |
2013-09-12 |
|
[ 39 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-15
�
� |
Chairman, CPM-15
� |
� |
2013-09-10 |
|
[ 38 ]
�
� |
List of documents issued (Documents 7A/28 - 7A/37)
�
� |
BR Study Groups Department
� |
� |
2013-09-05 |
|
[ 37 ]
�
� |
Proposed revision to draft CPM text on WRC-15 agenda item 1.14
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2013-09-04 |
|
[ 36 ]
�
� |
Proposals on WRC-15 agenda item 1.14
�
� |
Russian Federation
� |
� |
2013-09-03 |
|
[ 35 ]
�
� |
Preliminary draft revision of Recommendation ITU-R TF.374-5 "Precise frequency and time-signal transmissions"
�
� |
Germany (Federal Republic of)
� |
� |
2013-09-02 |
|
[ 34 ]
�
� |
An introduction to Universal Coordinated Time and the use of leap seconds as related to WRC-15 agenda item 1.14
�
� |
United States of America
� |
� |
2013-09-02 |
Results:83 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):