Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 174 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]
�
� |
WP 5A
� |
� |
2015-08-26 |
|
[ 173 ]
�
� |
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam
�
� |
WP 6A
� |
� |
2015-08-03 |
|
[ 172 ]
�
� |
Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)
�
� |
ITU-T SG9
� |
� |
2015-07-14 |
|
[ 171 ]
�
� |
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations
�
� |
WP 1A
� |
� |
2015-06-12 |
|
[ 170 ]
�
� |
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
�
� |
WP 1A
� |
� |
2015-06-12 |
|
[ 169 ]
�
+Ann.1-10� |
Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2015)
�
� |
Chairman, WP 1C
� |
� |
2015-06-10 |
|
[ 168 ]
�
(Rev.1)� |
Final list of participants - Working Party 1C (Geneva, 3-10 June 2015)
�
� |
Director, BR
� |
� |
2015-06-09 |
|
[ 167 ]
�
� |
List of documents issued (Documents 1C/119 - 1C/167)
�
� |
BR Study Groups Department
� |
� |
2015-06-02 |
|
[ 166 ]
�
� |
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ Doc.XXX] - Proposal for a new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator
�
� |
CG on DF Accuracy
� |
� |
2015-05-27 |
|
[ 165 ]
�
� |
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF Accuracy
�
� |
CG on DF Accuracy
� |
� |
2015-05-27 |
|
[ 164 ]
�
� |
Critical area for measuring and setting synchronization in medium frequency
�
� |
Iran (Islamic Republic of)
� |
� |
2015-05-27 |
|
[ 163 ]
�
� |
Proposed preliminary draft revision of Recommendation ITU-R SM.1753-2 - Methods for measurements of radio noise
�
� |
Japan
� |
� |
2015-05-27 |
|
[ 162 ]
�
� |
Proposal for a preliminary draft new Recommendation ITU-R SM.[Precision of time information in output data of monitoring receivers] - Precision of time information in output data of monitoring receivers
�
� |
Japan
� |
� |
2015-05-27 |
|
[ 161 ]
�
� |
Proposal for a preliminary draft new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator
�
� |
Japan
� |
� |
2015-05-27 |
|
[ 160 ]
�
� |
Proposed revision to Report ITU-R SM.2130 - Inspection of radio stations
�
� |
Korea (Republic of)
� |
� |
2015-05-27 |
|
[ 159 ]
�
� |
Proposal on the modification of the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-Site Measurements of DF Accuracy
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 158 ]
�
� |
Proposed revisions to Recommendation ITU-R SM.1880 - Spectrum occupancy measurement
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 157 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution
�
� |
Chairman, CG on Spectrum Monitoring Evolution
� |
� |
2015-05-22 |
|
[ 156 ]
�
� |
Working document towards a preliminary draft new Report - Measurement techniques and new technologies for satellite monitoring
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 155 ]
�
� |
Working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF accuracy
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 154 ]
�
� |
Proposed contribution to the working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - The grid monitoring experimental network for metropolitan environment in Shanghai, China
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 153 ]
�
� |
Proposal for a new Recommendation on test procedure for measuring direction finder sensitivity - Test procedure for measuring direction finder sensitivity
�
� |
China (People's Republic of)
� |
� |
2015-05-22 |
|
[ 152 ]
�
� |
Review of working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE-DF-ACC] - On-site measurements of DF accuracy
�
� |
Greece
� |
� |
2015-05-22 |
|
[ 151 ]
�
� |
RF Human hazards - ITU Intersectoral activities
�
� |
Israel (State of)
� |
� |
2015-05-21 |
|
[ 150 ]
�
� |
Preliminary draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
�
� |
Chairman CG on Planning SMN
� |
� |
2015-05-20 |
|
[ 149 ]
�
(Rev.1)� |
Comments on the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy
�
� |
GEW Technologies (Pty) Ltd.
� |
� |
2015-05-14 |
|
[ 148 ]
�
� |
Review of working document towards a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy
�
� |
MEDAV GmbH
� |
� |
2015-05-14 |
|
[ 147 ]
�
� |
Proposal for the revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals
�
� |
United States of America
� |
� |
2015-05-13 |
|
[ 146 ]
�
� |
Proposed modifications to Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events
�
� |
Indonesia (Republic of)
� |
� |
2015-05-08 |
|
[ 145 ]
�
� |
Preliminary draft new Recommendation ITU-R SM.[DOC. _ _ _ _] - Inserting highly precise time information in I/Q data of monitoring receivers
�
� |
GEW Technologies (Pty) Ltd.
� |
� |
2015-04-30 |
|
[ 144 ]
�
� |
Report to Working Party 1C on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations
�
� |
Brazil (Federative Republic of)
� |
� |
2015-04-24 |
|
[ 143 ]
�
� |
Spectrum management activities for the FIFA Soccer World Cup 2014 Brazil
�
� |
Brazil (Federative Republic of)
� |
� |
2015-04-24 |
|
[ 142 ]
�
� |
Working document towards the Report ITU-R SM.[PLANNING_SMN] - Optimization of the planning of spectrum monitoring networks topology in VHF/UHF range using irregular model of monitoring networks
�
� |
Ukraine
� |
� |
2015-03-18 |
|
[ 141 ]
�
� |
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters
�
� |
WP 6A
� |
� |
2015-03-03 |
|
[ 140 ]
�
� |
Proposal for revision of Report ITU -R SM.2256 - Spectrum occupancy measurements and evaluation
�
� |
Russian Federation
� |
� |
2015-02-25 |
|
[ 139 ]
�
� |
Draft revision of Recommendation ITU -R SM.1880 - Spectrum occupancy measurement
�
� |
Russian Federation
� |
� |
2015-02-25 |
|
[ 138 ]
�
� |
This document has been withdrawn
�
� |
BR Study Groups Department
� |
� |
2015-02-25 |
|
[ 137 ]
�
� |
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"
�
� |
ITU-T SG 5
� |
� |
2015-02-11 |
|
[ 136 ]
�
� |
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
�
� |
WP 5D
� |
� |
2015-02-10 |
|
[ 135 ]
�
� |
Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)
�
� |
ITU-T SG 5
� |
� |
2015-02-10 |
|
[ 134 ]
�
� |
Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)
�
� |
Chairman, SG 1
� |
� |
2015-02-06 |
|
[ 133 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 , ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on Q7/2 work items for the 2014 - 2018 study period
�
� |
ITU-D SG 2
� |
� |
2014-11-17 |
|
[ 132 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems
�
� |
WP 5A
� |
� |
2014-11-10 |
|
[ 131 ]
�
� |
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
�
� |
WP 5B
� |
� |
2014-11-05 |
|
[ 130 ]
�
� |
RF Human hazards - Intersectoral activities
�
� |
Israel (State of)
� |
� |
2014-10-26 |
|
[ 129 ]
�
� |
Liaison statement to Working Party 1C - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]
�
� |
WP 7D
� |
227/7
� |
2014-10-17 |
|
[ 128 ]
�
� |
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)
�
� |
ITU-T SG 9
� |
� |
2014-09-30 |
|
[ 127 ]
�
� |
Reply liaison statement to Working Party 1C - Information documents on indoor noise measurement
�
� |
WP 3L
� |
� |
2014-09-15 |
|
[ 126 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5
�
� |
ITU-T WP 2/5
� |
� |
2014-08-08 |
|
[ 125 ]
�
� |
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
�
� |
WP 1A
� |
� |
2014-06-20 |
Results:174 total items. Result page:�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):