Documents Temporaires�� |
�
|
Num�ro�
|
Titre
|
Source
|
Date
|
|
[ 22 ]
�
� |
WRC-15 agenda item 7 - Review of the orbital position limitations in RR Appendix 30 (Issue [X])
�
� |
Special Committee (SC-WG-1)
� |
2014-12-05 |
|
[ 21 ]
�
� |
Draft CPM text on WRC-15 agenda item 7 - Possible method to mitigate excessive satellite network filings issue (Issue [Y])
�
� |
Special Committee (SC-WG-1)
� |
2014-12-05 |
|
[ 20 ]
�
� |
WRC-15 agenda item 7, Issue E - Failure of a satellite during the ninety-day bringing into use period
�
� |
SC (SC-WG-1)
� |
2014-12-05 |
|
[ 19 ]
�
� |
WRC-15 agenda item 7 - Using one space station to bring frequency assignments at different orbital locations into use within a short period of time (Issue [F])
�
� |
Special Committee (SC-WG-1)
� |
2014-12-04 |
|
[ 18 ]
�
� |
WRC-15 agenda item 7 - Issue of a possible comprehensive review of the radio regulatory regime governing space services
�
� |
Special Committee (SC-WG-1)
� |
2014-12-04 |
|
[ 17 ]
�
� |
WRC-15 agenda item 7 - Issue of the possible harmonization of certain provisions of Article 4 of RR Appendices 30 and 30A with those of RR Appendix 30B, specifically on the issue of replacement of tacit with specific agreement
�
� |
Special Committee (SC-WG-1)
� |
2014-12-04 |
|
[ 16 ]
�
� |
WRC-15 agenda item 7 - Issue of steerable beams and antenna gain contour covering an area beyond the submitted service area for satellite networks
�
� |
Special Committee (SC-WG-1)
� |
2014-12-04 |
|
[ 15 ]
�
� |
WRC-15 agenda item 7, Issue [D] - Clarification of bringing into use information provided under RR Nos. 11.44/11.44B
�
� |
Special Committee (SC-WG-1)
� |
2014-12-04 |
|
[ 14 ]
�
� |
Compilation of WRC decisions
�
� |
Special Committee (SC-WG-2)
� |
2014-12-04 |
|
[ 13 ]
�
� |
WRC-15 agenda item 9.1, Issue 9.1.2 - Possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
�
� |
Special Committee (SC-WG-2)
� |
2014-12-04 |
|
[ 12 ]
�
� |
WRC-15 agenda item 9.1, Issue 9.1.4 - Updating and rearragnement of RR
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 11 ]
�
� |
Issue of applicability of frequency coordination regulatory provisions to an application with a service
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 10 ]
�
� |
Issue of example of regulatory text for allocation by footnotes
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 9 ]
�
� |
WRC-15 agenda item 1.16 - Automatic Identification System (AIS)
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 8 ]
�
� |
WRC-15 agenda item 9.2 - Application of "Additional allocation" and "Different category of service"
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 7 ]
�
� |
WRC-15 agenda item 9.2 - Metaids station definitions
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 6 ]
�
� |
SRS (deep space)
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 5 ]
�
� |
WRC-15 agenda item 9.1, Issue 9.1.8 - Nanosatellites and picosatellites
�
� |
Special Committee (SC-WG-2)
� |
2014-12-03 |
|
[ 4 ]
�
� |
Use of FSS links with earth stations in motion in the 29.5-30.0 GHz and 19.7-20.2 GHz frequency bands
�
� |
Chairman, Special Committee
� |
2014-12-03 |
|
[ 3 ]
�
� |
WRC-15 agenda item 7, draft CPM text on modifications to RR Appendix 30B in relation to the suspension of use of a frequency assignment
�
� |
Special Committee (SC-WG-1)
� |
2014-12-02 |
|
[ 2 ]
�
� |
WRC-15 agenda item 7, Issue B - Publication of information on bringing into use of satellite networks at the ITU website
�
� |
Special Committee (SC-WG-1)
� |
2014-12-02 |
|
[ 1 ]
�
� |
WRC-15 agenda item 7, Issue A - Informing the Bureau of a suspension under RR No. 11.49 beyond six months
�
� |
Special Committee (SC-WG-1)
� |
2014-12-02 |
Resultats:22 documents
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):