International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7C� C�

ITU-R�WP7C

Remote Sensing Systems

Results:275 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 275 ]
Liaison statement to Working Parties 4C, 5D and 7C - Status of studies on the harmonization/rationalization of frequency bands/tuning ranges for cross-border deployment of electronic news gathering (ENG) systems � WP 5C 2011-11-18
[ 274 ]
Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and -passive services � WP 5C 2011-11-17
[ 273 ]
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Studies in support of WRC-12 Agenda item 1.20 � WP 5C 2011-11-16
[ 272 ]
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4 � WP 5C 2011-11-16
[ 271 ]
Liaison statement to Working Parties 5B, 7C and 7D - Draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz � WP 5C 2011-11-16
[ 270 ]
ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7 � BR Study Group Department 2011-11-03
[ 269 ]
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance" � SG 3 2011-10-31
[ 268 ]
+Ann.1-11
Report of the meeting of Working Party 7C - (Geneva, 26-30 September 2011) � Chairman, WP 7C 2011-10-03
[ 267 ]
Final List of Participants - Working Party 7C (Geneva, 26-30 September 2011) � Director, BR 2011-09-30
[ 266 ]
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services � WP 4A 2011-09-29
[ 265 ]
Liaison statement to Working Party 7C - Updated documents on pulsed interference to RNSS receivers � WP 4C 2011-09-26
[ 264 ]
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services � WP 4C 2011-09-28
[ 263 ]
List of documents issued � BR Study Group Department 2011-09-23
[ 262 ]
Sharing studies between EESS (passive) and fixed service in the band 31.5-31.8 GHz � United Kingdom of Great Britain and Northern Ireland 232/7 2011-09-19
[ 261 ]
Draft revision of Recommendation ITU-R RS.515-4 - Frequency bands and bandwidths used for satellite passive remote sensing � Korea (Republic of) 2011-09-19
[ 260 ]
Proposed modifications to Annex 3 of Doc. 7C/214 - PDR of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band � United States of America 2011-09-15
[ 259 ]
Draft new Report ITU-R RS.[3.15 GHZ SHARE] - Sharing the 31.5-31.8 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive) � United States of America 232-1/7 2011-09-15
[ 258 ]
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.8 involving FS OOB emissions into EESS (passive) systems in the 86-92 GHz band � United States of America 129-2/7 2011-09-15
[ 257 ]
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.20 involving EESS (passive) and HAPS gateway stations � United States of America 2011-09-15
[ 256 ]
Working document towards a preliminary draft new Report - Potential interference between the Earth exploration satellite (active) and space research (active) in the 1 215-1 300 MHz and the Air-Route surveillance radars in the 1 215-1 400 MHz band � United States of America 2011-09-15
[ 255 ]
Potential impact to EESS (passive) systems operating near 6 GHz from HAPS gateway systems � United States of America 2011-09-15
[ 254 ]
Evaluation of fixed service OOB interference to EESS (passive) systems in 86-92 GHz � United States of America 129-2/7 2011-09-15
[ 253 ]
Working document toward a draft new Report RS.[MITIG_RNSS-EESS] "Compatibility measurements and possible mitigation measures between EESS (active) systems and RNSS systems in the band 1 215-1 300 MHz" � United States of America 288/4, 217-2/4 2011-09-15
[ 252 ]
Typical technical and operating characteristics and preferred frequency bands of spaceborne radar sounder systems in EESS (active) � United States of America 2011-09-15
[ 251 ]
Draft liaison statement to ITU-D Study Group 2 and the World Meteorological Organization - Additional information in support of ITU-D Study Group 2 Question 22-1/2 � United States of America 2011-09-15
[ 250 ]
Proposed draft new Recommendation ITU-R RS.[PERF_INTERF], performance and interference criteria for satellite passive remote sensing � United States of America 2011-09-15
[ 249 ]
Analysis and proposed revision to Report ITU-R F.[FS/PASSIVE - 70-80 GHz] � France 2011-09-16
[ 248 ]
Technical and operational characteristics of the space station "Spektr-R" passive sensors � Russian Federation 221/7 2011-09-16
[ 247 ]
Preliminary analysis of the impact of unwanted emissions of SAR operating at 9 GHz into SRS deep space stations operating in the band 8.4-8.5 GHz and radioastronomy stations operating in the band 10.6-10.7 GHz � France , Germany (Federal Republic of) 2011-09-16
[ 246 ]
Report of RAG activities � Chairman, SG 7 2011-09-05
[ 245 ]
Modification to preliminary draft revision of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 2515-1 300 MHz band � Japan 234/7 2011-09-01
[ 244 ]
ITU-R Study Group 5 Recommendation ITU-R F.1107-2 - Probabilistic analysis for assessing interference into the fixed service from satellites using the geostationary orbit � BR Study Group Department 2011-08-09
[ 243 ]
Questions assigned to Radiocommunication Study Group 7 - Science services � Chairman, SG 7 2011-07-28
[ 242 ]
Liaison statement to Working Party 4C and Working Party 7C regarding sharing in the frequency bands 5 150-5 250 MHz, 10.5-10.6 GHz and 13.25-13.4 GHz � WP 5B 2011-07-01
[ 241 ]
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 7B, 7C and 7D - On proposed revisions to Recommendation ITU-R M.1732 � WP 5A 2011-06-27
[ 240 ]
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Status of studies in support of WRC-12 Agenda item 1.20 � WP 5C 2011-06-24
[ 239 ]
Liaison statement to relevant Working Parties of ITU-R Study Groups 4, 5, 6 and 7 - Status of studies in support of WRC-12 Agenda item 1.5 � WP 5C 2011-06-24
[ 238 ]
Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and passive services � WP 5C 2011-06-23
[ 237 ]
Liaison statement to ITU-R Working Parties 1A, 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Revisions of F-Series Recommendations on the interference criteria (Recommendations ITU-R F.758-4 and ITU-R F.1495-1) � WP 5C 2011-06-22
[ 236 ]
Liaison statement to Working Parties 7C and 7D - Development of new ITU-R Recommendations on radio frequency arrangements for fixed service systems in frequency arrangements for fixed service systems in frequency ranges 40.5-43.5 GHz, 71-86 GHz and 92-95 GHz � WP 5C 2011-06-22
[ 235 ]
Liaison statement to Working Parties 7C and 7D - Proposed modifications to preliminary draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency range between 57 GHz and 134 GHz � WP 5C 2011-06-22
[ 234 ]
Liaison statement to Working Party 7C - Regarding studies under Question ITU-R 232-1/7 � WP 5C 232/7 2011-06-22
[ 233 ]
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties (copy to ITU-T Study Group 15) - Activities regarding the protection range calculation between inductive systems and radiocommunication services using frequencies below 30 MHz � WP 1A 2011-06-10
[ 232 ]
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment � WP 1A 2011-06-10
[ 231 ]
Liaison statement to Study Groups 4, 6 and 7 and Working Parties 5A, 5B, 5C and 5D on a database for the protection of radio services � SG 1 2011-06-08
[ 230 ]
Reply liaison statement to Working Party 7C (copy to ICAO for information) - Feasibility of sharing between the radionavigation-satellite service (space-to-Earth and space-to-space) and the Earth exploration-satellite (active) and space research (active) services in the band 1 215-1 300 MHz � WP 4C 2011-05-24
[ 229 ]
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) Further work on power line telecommunications � WP 6A 2011-05-20
[ 228 ]
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications � WP 6A 2011-05-20
[ 227 ]
Progress of the studies requested by WRC Resolutions and Recommendations (except those related to WRC-12 Agenda items) � Chairman, SG 7 2011-05-16
[ 226 ]
Initial review of ITU-R Resolutions of specific concern to the scope of Study Group 7 � Chairman, SG 7 2011-05-16
Results:275 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-09-21