Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-R : WP7B : Contribuciones : 121 Nuevo�-� Busque los documentos de la reuni�n
[121]� Report on the February 2009 meeting of Working Party 7B with a view to its next meeting (September 2009)

Formato

Tama�o

Puesta a disposici�n

English

Word

688128 octetos 2009-03-17 [121]�Annex 18- Liaison statement to ITU-D Study Group 2 regarding an ITU-D Study Group 2 Question - Proposal on the role of telecommunication/ICT to be used for an integrated ICT network to monitor avian infulenza

Word

194560 octetos 2009-03-17 [121]�Annex 17- Working document towards draft CPM Text on WRC-11 Agenda item 1.24

Word

140288 octetos 2009-03-17 [121]�Annex 16- Work plan and milestones for WRC-11 Agenda item 1.24

Word

154112 octetos 2009-03-17 [121]�Annex 15- Working document towards draft CPM text on WRC-11 Agenda item 1.12 - Agenda item 1.12 (WP 7B / WP 4A, WP 5B, WP 5C, (WP 5A))

Word

180224 octetos 2009-03-20 [121]�Annex 14- Work plan and milestones for WRC-11 Agenda item 1.12

Word

214016 octetos 2009-03-17 [121]�Annex 13- Working document towards draft CPM text on WRC-11 Agenda item 1.11 - Chapter 4 - Science issues

Word

140288 octetos 2009-03-17 [121]�Annex 12- Work plan and milestones for WRC-11 Agenda item 1.11

Word

1555456 octetos 2009-03-6 [121]�Annex 11- Preliminary draft new Report ITU-R SA.[SRS/RA ANT.PAT.] - Examples of radiation patterns of large antennas used for space research and radio astronomy

Word

1083904 octetos 2009-03-6 [121]�Annex 10- Preliminary draft new Report ITU-R SA.[SRS WBA] - "Factors affecting the choice of frequency bands for space research service deep space (space-to-Earth) telecommunication links"

Word

636928 octetos 2009-03-5 [121]�Annex 09- Preliminary draft new Report ITU-R SA.[SRS-AMS(37-38 GHz)] - Study on compatibility between the mobile service (aeronautical) and the space research service (space-to-Earth) in the frequency band 37-38 GHz

Word

623104 octetos 2009-03-5 [121]�Annex 08- Preliminary draft new Report ITU-R [METSAT 7.9 GHz] - Compatibility between the meteorological satellite and the fixed service in the band 7 850-7 900 MHz

Word

760320 octetos 2009-03-6 [121]�Annex 07- Preliminary draft new Report ITU R SA.[LINK PERF] - Method for calculating link performance in the space research service

Word

440320 octetos 2009-03-5 [121]�Annex 06- Preliminary draft new Recommendation ITU-R SA.[26 GHz] - Guidelines for efficient use of the band 25.5-27.0 GHz by the Earth exploration-satellite service (space-to-Earth) and space research service (space-to-Earth)

Word

540672 octetos 2009-03-5 [121]�Annex 05- Working document towards a preliminary draft new Recommendation and/or Report ITU-R SA.[23 GHz SRS SHARING] - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz

Word

381952 octetos 2009-03-6 [121]�Annex 04- Preliminary draft new Recommendation ITU-R SA.[MANNED EMERGENCY COMM] - Emergency communications for manned space flight

Word

360960 octetos 2009-03-5 [121]�Annex 03- Preliminary draft revision of Recommendation ITU-R SA.1163-2 - Interference criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services

Word

267776 octetos 2009-03-5 [121]�Annex 02- Preliminary draft revision of Recommendation ITU-R SA.1164-2 - Sharing and coordination criteria for service links in data collection systems in the Earth exploration-satellite and meteorological-satellite services

Word

169984 octetos 2009-03-5 [121]�Annex 01- Preliminary draft revision of Recommendation ITU-R SA.1627 - Telecommunication requirements and characteristics of EESS and MetSat service systems for data collection and platform location

Word

255488 octetos 2009-03-25 [121]�- Report on the February 2009 meeting of WP 7B with a view to its next meeting (September 2009)

Documento :

UIT-R�WP7B� Contribuci�n� 121

T�tulo :

Report on the February 2009 meeting of Working Party 7B with a view to its next meeting (September 2009)

Recibido en :

2009-02-20

Origen :

Chairman, WP 7B

Disponibilidad :

Restringido a usuarios de TIES�[UIT-R]

Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� Coordenador de Web UIT-R
Actualizado el :�2009-03-25