Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 636 ]
�
� |
Liaison statement on possible disturbance/interference between radio devices and broadband cable and TV networks
�
� |
ITU-T SG 9
� |
� |
2011-12-14 |
|
[ 635 ]
�
� |
Liaison statement on radio connection to hearing aids
�
� |
ITU-T SG 16
� |
� |
2011-12-14 |
|
[ 634 ]
�
� |
Reply liaison statement related to "Further work on Power Line Telecommunications"
�
� |
ITU-T SG 9
� |
� |
2011-12-14 |
|
[ 633 ]
�
� |
ITU-R Study Group 1 Recommendation ITU-R SM.1879-1 to be brought to the attention of Study Group 6
�
� |
BR Study Group Department
� |
� |
2011-11-25 |
|
[ 632 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 5A, 4A, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R 1581-3
�
� |
WP 5B
� |
� |
2011-11-18 |
|
[ 631 ]
�
� |
Liaison statement to Working Parties 5A and 6A - Status of studies in support of potential joint development of ITU-R Recommendations/Reports on harmonization of ENG
�
� |
WP 5C
� |
� |
2011-11-16 |
|
[ 630 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4
�
� |
WP 5C
� |
� |
2011-11-16 |
|
[ 629 ]
�
� |
ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-11-03 |
|
[ 628 ]
�
� |
ITU-R Study Group 1 Question to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-11-03 |
|
[ 627 ]
�
� |
ITU-R Study Group 1 Recommendation to be brought to the attention of Study Group 6
�
� |
BR Study Group Department
� |
� |
2011-11-03 |
|
[ 626 ]
�
� |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"
�
� |
SG 3
� |
� |
2011-10-31 |
|
[ 625 ]
�
� |
Reply liaison statement to Working Party 1A (copy to Working Party 6A for information) - Question ITU-R 230-1/3 on "Prediction methods and models applicable to power line telecommunications systems"
�
� |
SG 3
� |
230-1/3
� |
2011-10-31 |
|
[ 624 ]
�
� |
Liaison statement to Working Party 6A - Ground-wave propagation handbook
�
� |
SG 3
� |
� |
2011-10-31 |
|
[ 623 ]
�
� |
Reply liaison statement to Working Party 6A - Impact of global warming on ITU-R Recommendations - Interference assessment over cold and warm sea paths
�
� |
WP 3K
� |
� |
2011-10-26 |
|
[ 622 ]
�
� |
Liaison statement to Working Party 6A - Compatibility studies in relation to Resolution 224
�
� |
WP 5D
� |
� |
2011-10-26 |
|
[ 621 ]
�
� |
Liaison statement to IEC TC100 on Wireless connections to hearing aids
�
� |
ITU-T FG AVA
� |
� |
2011-10-14 |
|
[ 620 ]
�
� |
Liaison statement to Working Party 5D (copy to WPs 4A, 5A, 5B and 6A for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
�
� |
WP 7B
� |
� |
2011-10-13 |
|
[ 619 ]
�
+Ann.1-20� |
Report of the meeting of Working Party 6A (Geneva, 27 September to 5 October 2011)
�
� |
Chairman, WP 6A
� |
� |
2011-10-06 |
|
[ 618 ]
�
� |
Final List of Participants - Working Party 6A (Geneva, 27 September to 5 October 2011)
�
� |
Director, BR
� |
� |
2011-10-05 |
|
[ 617 ]
�
� |
Proposal for action on some terms and definitions related to broadcasting
�
� |
SG 6 Rapporteur to the CCV
� |
� |
2011-10-03 |
|
[ 616 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services
�
� |
WP 4A
� |
� |
2011-09-29 |
|
[ 615 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 5A, 5B, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
�
� |
WP 4A
� |
� |
2011-09-29 |
|
[ 614 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services
�
� |
WP 4C
� |
� |
2011-09-28 |
|
[ 613 ]
�
� |
Liaison statement to Working Parties 6A and 6B
�
� |
WP 4B
� |
� |
2011-09-26 |
|
[ 612 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2011-09-26 |
|
[ 611 ]
�
(Rev.1)� |
Status Report on preparation of Handbook on digital terrestrial television (DTTB) implementation
�
� |
RG Handbook on DTTB implementation
� |
� |
2011-09-26 |
|
[ 610 ]
�
� |
Study Group 6 receives Emmy Award 2011 for Recommendation ITU-R BS.1770-2
�
� |
Chairman, SG 6
� |
� |
2011-09-23 |
|
[ 609 ]
�
� |
Studies called for under Resolution 224 (WRC-07) within Working Party 6A consistent with the views of the Chairmen of Study Group 5 and Study Group 6 - Draft Report on intercessional activities
�
� |
RG on Studies under Resolution 224
� |
� |
2011-09-22 |
|
[ 608 ]
�
� |
The co-existence of LTE and digital TV services at UHF: A field trial
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
4-2/6, 132-1/6, 114/6
� |
2011-09-20 |
|
[ 607 ]
�
� |
Technical analysis of LTE 800 MHz base station interference into DTT receivers
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
4/6, 132/6, 114/6
� |
2011-09-20 |
|
[ 606 ]
�
� |
Protection ratio measurements LTE 800 MHz base station interference into DTT receivers
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
4-2/6, 132-1/6, 114/6
� |
2011-09-20 |
|
[ 605 ]
�
� |
Additional DVB-T receiver protection ratio and overload threshold measurements under LTE BS interference with different LTE traffic loadings
�
� |
Philips International B.V.
� |
� |
2011-09-20 |
|
[ 604 ]
�
� |
Proposed liaison statement to Working Party 5D - Compatibility studies in relation to Resolution 224 (Rev.WRC-07) and Question ITU-R 229/5
�
� |
NDR
,
Free TV Australia Ltd.
,
Zweites Deutsches Fernsehen (ZDF)
� |
� |
2011-09-20 |
|
[ 603 ]
�
� |
Preliminary draft new Report ITU-R BT.[CS] - Compatibility Studies in the band 790-862 MHz
�
� |
RG on Studies under Resolution 224
� |
� |
2011-09-20 |
|
[ 602 ]
�
� |
Preliminary draft new Report - Areas for compatibility studies between digital terrestrial television broadcasting services and other services
�
� |
RG on Studies under Resolution 224
� |
� |
2011-09-20 |
|
[ 601 ]
�
� |
Concerns on preliminary draft new Report ITU-R BT.[COMPENDIUM]
�
� |
Korea (Republic of)
� |
� |
2011-09-19 |
|
[ 600 ]
�
� |
Review of Recommendations and Reports within the purview of Working Party 6A
�
� |
Korea (Republic of)
� |
� |
2011-09-19 |
|
[ 599 ]
�
� |
Proposed draft new Recommendation ITU-R BT.[ETMM] - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
�
� |
Korea (Republic of)
� |
45-2/6, 31/6
� |
2011-09-19 |
|
[ 598 ]
�
� |
Report on developments on PLT since the sixth meeting of Study Group 6
�
� |
RG PLT
� |
� |
2011-09-20 |
|
[ 597 ]
�
� |
Proposed revisions to preliminary draft new Recommendation ITU-R BT.[ETMM] - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
�
� |
Ukraine
� |
69-1/6
� |
2011-09-19 |
|
[ 596 ]
�
� |
Proposed draft revision of Recommendation ITU-R BT.1833-1 - Broadcasting of multimedia and data applications for mobile reception by handheld receivers
�
� |
Ukraine
� |
69-1/6
� |
2011-09-19 |
|
[ 595 ]
�
� |
Preliminary draft new Report - A conceptual method for the representation of loss of broadcast coverage
�
� |
RG on Studies under Resolution 224
� |
� |
2011-09-19 |
|
[ 594 ]
�
+Corr.1� |
Preliminary draft new Report - A generic methodology for assessing interference from cellular mobile networks into broadcast reception
�
� |
RG on Studies under Resolution 224
� |
� |
2011-09-19 |
|
[ 593 ]
�
� |
Preparation of new Question on the study of worldwide broadcasting roaming
�
� |
Russian Federation
� |
� |
2011-09-19 |
|
[ 592 ]
�
� |
Results of field strength and consistent reception test for DVB-T/T2 digital terrestrial broadcasting on the border of transmitting station service area
�
� |
Russian Federation
� |
4-2/6, 132-1/6
� |
2011-09-19 |
|
[ 591 ]
�
� |
Frequency band using for electronic news gathering, outside broadcast and program field production
�
� |
Regional Commonwealth in the Field of Communications
� |
89/6
� |
2011-09-19 |
|
[ 590 ]
�
� |
Proposed liaison statement to Study Group 1 and Working Party 1C - DVB-T coverage measurements and verification of planning criteria
�
� |
Free TV Australia Ltd.
� |
� |
2011-09-19 |
|
[ 589 ]
�
� |
Proposed Question to ITU-R Working Party 3K - Impact of global warming on ITU-R Recommendations - Interference assessment over cold and warm sea paths
�
� |
Free TV Australia Ltd.
� |
� |
2011-09-19 |
|
[ 588 ]
�
� |
Proposed liaison statement to Study Group 1 and Working Party 1B - Technical and operating parameters and spectrum use for short-range radiocommunication devices
�
� |
Free TV Australia Ltd.
� |
� |
2011-09-19 |
|
[ 587 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R BT.[DTVRX] - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems
�
� |
Free TV Australia Ltd.
� |
4-2/6, 14/6, 132-1/6, 114/6, 105/6
� |
2011-09-19 |
Results:636 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):