Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 152 ]
�
� |
ITU-R Study Group 1 Question to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-11-03 |
|
[ 151 ]
�
� |
Draft revision of Report ITU-R SA.2164 - Compatibility between the meteorological satellite and the fixed services in the band 7 850-7 900 MHz
�
� |
WP 7B
� |
� |
2011-10-25 |
|
[ 150 ]
�
� |
Draft new Report ITU-R SA.[SRS SHARING 37 GHz] - Protection of SRS and FSS systems sharing the 37.5-38 GHz band
�
� |
WP 7B
� |
� |
2011-10-25 |
|
[ 149 ]
�
� |
Draft new Question ITU-R XXX/7 - Characteristics and spectrum requirements of nano and pico satellites as well as systems composed of such satellites
�
� |
WP 7B
� |
� |
2011-10-24 |
|
[ 148 ]
�
� |
Draft new Report ITU-R RS.[31.5 GHZ SHARE] - Sharing the 31.5-31.8 GHz band by the fixed and mobile services and the Earth exploration -satellite service (passive)
�
� |
WP 7C
� |
� |
2011-10-20 |
|
[ 147 ]
�
� |
Draft revision of Recommendation ITU-R RS.515-4 - Frequency bands and bandwidths used for satellite passive sensing
�
� |
WP 7C
� |
� |
2011-10-20 |
|
[ 146 ]
�
� |
Draft new Recommendation IUT-R RS.[PERF_INTERF] - Peformance and interference criteria for satellite passive remote sensing
�
� |
WP 7C
� |
� |
2011-10-20 |
|
[ 145 ]
�
� |
Draft new Report ITU-R RA.[RQZ] - Characteristics of radio quiet zones (RQZs)
�
� |
WP 7D
� |
� |
2011-10-20 |
|
[ 144 ]
�
� |
Liaison statement to Study Group 1 (for information to Study Group 4, 5, 7) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS)
�
� |
WP 6A
� |
� |
2011-10-10 |
|
[ 143 ]
�
� |
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Parties 1A, 4A) - A database for the protection of radio services
�
� |
WP 4C
� |
� |
2011-09-21 |
|
[ 142 ]
�
� |
Liaison statement to Study Group 1 and Working Party 1A (copy to Study Groups 4, 6 and 7) - A database for the protection of radio services
�
� |
WPs 5A, 5B, 5C and 5D
� |
� |
2011-06-28 |
|
[ 141 ]
�
� |
Information Document from TSB Director on "ITU-T Activities on ICT, Climate Change and the Environment"
�
� |
Director, TSB
� |
� |
2011-05-20 |
|
[ 140 ]
�
� |
Liaison statement to ITU-R SG 7 on continued work of ITU-D SG 2 Question 22-1/2: utilization of Telecommunications/ICT for disaster preparedness, mitigation and response
�
� |
ITU-D SG 2
� |
� |
2011-03-28 |
|
[ 139 ]
�
� |
ITU-R Study Group 5 Report to be brought to the attention of Study Groups 4 and 7
�
� |
BR Study Group Department
� |
� |
2011-03-11 |
|
[ 138 ]
�
� |
ITU-R Study Group 1 Recommendation SM.1541-3 to be brought to the attention of Study Groups 4, 5, 6 and 7
�
� |
BR Study Group Department
� |
� |
2011-02-07 |
|
[ 137 ]
�
� |
Response to Document 5/214 from the Chairman of Study Group 7 on consideration of the adoption of Recommendations and a Report by Study Group 5
�
� |
Chairman, SG 5
� |
� |
2011-01-17 |
|
[ 136 ]
�
� |
Note from Study Group 6 to the RAG proposal for revision to the guidelines for the working methods and/or Resolution ITU-R 1
�
� |
SG 6
� |
� |
2010-12-16 |
|
[ 135 ]
�
� |
Study Group 7 Summary Record (Meeting: 4 and 12/10/10)
�
� |
Chairman, SG 7
� |
� |
2010-10-13 |
|
[ 134 ]
�
� |
Final List of Participants - Study Group 7 (Geneva, 4 & 12 October 2010)
�
� |
Director, BR
� |
� |
2010-10-12 |
|
[ 133 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2010-10-11 |
|
[ 132 ]
�
� |
Draft new Report ITU-R SA.[23 GHz SRS EXCEPT HIBLEO-2 COMPAT] - Compatibility between the space research service (Earth-to-space) and the systems in the fixed, mobile and inter-satellite service in the band 22.55-23.15 GHz
�
� |
WP 7B
� |
� |
2010-10-11 |
|
[ 131 ]
�
� |
Note from Study Group 7 Chairman to the CPM Chairman
�
� |
Chairman, SG 7
� |
� |
2010-10-11 |
|
[ 130 ]
�
� |
Draft revision of Question ITU-R 141-3/7 - Data transmission for meteorological satellite systems
�
� |
WP 7B
� |
� |
2010-10-08 |
|
[ 129 ]
�
� |
Proposed new Question - Relativistic effects in the transfer of time and frequency in the vicinity of the Earth and in the solar system
�
� |
WP 7A
� |
� |
2010-10-08 |
|
[ 128 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R TF.768-6 - Standard frequencies and time signals
�
� |
WP 7A
� |
� |
2010-10-08 |
|
[ 127 ]
�
� |
Draft revision of Question ITU-R 207-277
�
� |
WP 7A
� |
� |
2010-10-08 |
|
[ 126 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R RA.1417 - A radio-quiet zone in the vicinity of the L2 Sun-Earth Lagrange point
�
� |
WP 7D
� |
147/7
� |
2010-10-08 |
|
[ 125 ]
�
� |
Draft new Question ITU-R XXX - Parameters needed for the registration of distributed radio astronomy systems
�
� |
WP 7D
� |
� |
2010-10-08 |
|
[ 124 ]
�
� |
Draft new Report ITU-R RA.[DTV] - The transition to digital television and its impact on the unprotected use by the radio astronomy service of bands used for terrestrial television broadcasting
�
� |
WP 7D
� |
� |
2010-10-08 |
|
[ 123 ]
�
� |
Draft new Report ITU-R SA.[SRS-AMS (37-38 GHz)] - Study on compatibility between the mobile servife (aeronautical) and the space research service (space-to-Earth) in the frequency band 37-38 GHz
�
� |
WP 7B
� |
� |
2010-10-08 |
|
[ 122 ]
�
� |
Draft new Report ITU-R SA.[23 GHz SRS HIBLEO-2 COMPAT] - Compatibility between the space research service (Earth-to-space) and the non-GSO-to-non-GSO systems on the inter-satellite service in the band 22.55-23.55 GHz
�
� |
WP 7B
� |
� |
2010-10-08 |
|
[ 121 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R SA.[METAIDS METH] - Methodology for determining terrestrial and space-to-Earth sharing and coordination criteria for meteorological aids in the 400.15-406 MHz and 1 668-1 700 MHz bands
�
� |
WP 7C
� |
� |
2010-10-08 |
|
[ 120 ]
�
� |
Draft liaison statement to ITU-D Study Group 2 concerning Question 24/2, ICT and climate change
�
� |
WP 7C
� |
� |
2010-10-08 |
|
[ 119 ]
�
� |
Draft new Report ITU-R SA.[BANDWIDTH REQU] - Spectrum requirements for future SRS missions operating under a potential new SRS allocation in the band 22.55-23.15 GHz
�
� |
WP 7B
� |
� |
2010-10-08 |
|
[ 118 ]
�
� |
Draft revision to Question ITU-R 139-3/7 - Data transmission for Earth exploration-satellite systems
�
� |
WP 7B
� |
� |
2010-10-08 |
|
[ 117 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2010-10-01 |
|
[ 116 ]
�
� |
Summary of responses to the Questionnaire on a draft revision of Recommendation ITU-R TF.460-6 (CACE/516)
�
� |
Director, BR
� |
� |
2010-09-29 |
|
[ 115 ]
�
� |
Liaison statement to ITU-D Study Group 2 concerning Question 24/2, ICT and climate change
�
� |
France
� |
� |
2010-09-27 |
|
[ 114 ]
�
� |
Executive Report of Working party 7A
�
� |
Chairman, WP 7A
� |
� |
2010-09-27 |
|
[ 113 ]
�
� |
Liaison statement on ICT and climate change
�
� |
ITU-D SG 2
� |
� |
2010-09-24 |
|
[ 112 ]
�
� |
Executive Report on the June 2010 meeting of Working Party 7D
�
� |
Chairman, WP 7D
� |
� |
2010-09-23 |
|
[ 111 ]
�
� |
Review of the Questions assigned by the Radiocommunication Assembly (RA-07) to Study Group 7
�
� |
Chairman, SG 7
� |
� |
2010-09-23 |
|
[ 110 ]
�
� |
Report on the status of Study Group 7 Handbooks (September 2010)
�
� |
Vice-Chairman, SG 7
� |
� |
2010-09-23 |
|
[ 109 ]
�
(Rev.1)� |
Report on the status of Study Group 7 ITU-R Recommendations
�
� |
Vice-Chairman, SG 7
� |
� |
2010-09-22 |
|
[ 108 ]
�
� |
Executive Report on the June 2010 meeting of Working Party 7C
�
� |
Chairman, WP 7C
� |
� |
2010-09-22 |
|
[ 107 ]
�
� |
Executive Report on the June 2010 meeting of Working Party 7B
�
� |
Chairman, WP 7B
� |
� |
2010-09-21 |
|
[ 106 ]
�
� |
Report of RAG activities
�
� |
Chairman, SG 7
� |
� |
2010-07-01 |
|
[ 105 ]
�
(Rev.1)� |
Draft new Recommendation ITU-R RS.[CLIMATE] - Use of remote sensing systems in the study of climate change and the effects thereof
�
� |
WP 7C
� |
� |
2010-06-29 |
|
[ 104 ]
�
� |
Draft new Report ITU-R RS.[ESSENTIAL ROLE OBSERVATIONS] - The essential role and global importance of radio spectrum use for Earth observations and for related applications
�
� |
WPs 7C and 7D
� |
� |
2010-06-29 |
|
[ 103 ]
�
� |
Draft new Recommendation ITU-R SA.[SRS 23 GHz CHAR] - Technical and operational characteristics of space research service (Earth-to-space) systems for use in the 22.55-23.15 GHz band
�
� |
WP 7B
� |
� |
2010-06-29 |
Results:152 total items. Result page:�
1 -
2 -
3 -
4
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):